Skip to content

Commit 67ade4b

Browse files
Updated mlpaths
1 parent 0ab3114 commit 67ade4b

File tree

3 files changed

+345
-1
lines changed

3 files changed

+345
-1
lines changed

docs/PromptEng/#prompteng.md#

Lines changed: 343 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,343 @@
1+
# TRANSCOM Prompt Engineering Workshop Program Guide
2+
## Introduction to Prompt Engineering & Practical Applications
3+
4+
**Target Audience:** US Transportation Command (TRANSCOM) Personnel
5+
**Duration:** Two 60-minute sessions
6+
**Platform:** Google Gemini LLM with multimodal capabilities
7+
8+
9+
---
10+
11+
## Workshop Overview
12+
13+
This intensive two-session workshop introduces TRANSCOM personnel to prompt engineering fundamentals and practical applications for transportation, logistics, and deployment planning. Participants will develop competencies in structuring effective prompts for military transportation operations, leveraging Gemini's multimodal capabilities to process documents, spreadsheets, and operational imagery.
14+
15+
---
16+
17+
## Session 1: Foundations of Prompt Engineering (90 minutes)
18+
19+
### Learning Objectives
20+
By the end of Session 1, participants will be able to:
21+
- **Remember:** Define prompt engineering terminology and core concepts
22+
- **Understand:** Explain the relationship between prompt structure and AI output quality
23+
- **Apply:** Construct basic prompts using established frameworks
24+
- **Analyze:** Evaluate prompt effectiveness for transportation planning scenarios
25+
26+
### Session Structure
27+
28+
#### Opening (15 minutes)
29+
**Activity:** "Transportation Challenge Icebreaker"
30+
- Participants identify a recent transportation/logistics challenge they faced
31+
- Quick-fire discussion on how AI assistance might have helped
32+
- Introduction to workshop objectives and TRANSCOM-specific applications
33+
34+
#### Module 1: Prompt Engineering Fundamentals (25 minutes)
35+
36+
**Core Concepts:**
37+
- Definition: Prompt engineering as the systematic design of inputs to generate desired AI outputs
38+
- The prompt-response feedback loop in military contexts
39+
- Understanding AI limitations and capabilities for transportation planning
40+
41+
**Key Terminology:**
42+
- **Token:** Basic units of text processing
43+
- **Context Window:** Maximum information capacity per interaction
44+
- **Temperature:** Creativity vs. precision control
45+
- **Multimodal Processing:** Integration of text, documents, images, and data
46+
47+
**Demonstration:** Live comparison of vague vs. structured prompts using TRANSCOM scenarios
48+
49+
#### Module 2: Essential Prompt Engineering Frameworks (25 minutes)
50+
51+
##### Framework 1: CLEAR Method
52+
- **C**ontext: Set the operational environment
53+
- **L**ength: Specify desired response format
54+
- **E**xamples: Provide relevant illustrations
55+
- **A**udience: Define the intended recipients
56+
- **R**ole: Establish AI's perspective/expertise
57+
58+
**TRANSCOM Example:**
59+
```
60+
Context: You are assisting with deployment planning for Exercise Pacific Thunder
61+
Length: Provide a 3-paragraph analysis
62+
Examples: Similar to Pacific Resolve 2023 logistics requirements
63+
Audience: Brigade-level transportation officers
64+
Role: Act as a senior logistics analyst with 15 years TRANSCOM experience
65+
```
66+
67+
##### Framework 2: CRISP Framework
68+
- **C**larify the objective
69+
- **R**ole assignment for AI
70+
- **I**nstructions with specific steps
71+
- **S**pecify format and constraints
72+
- **P**rompt for verification/questions
73+
74+
##### Framework 3: APE (Action-Purpose-Expectation)
75+
- **Action:** What specific task to perform
76+
- **Purpose:** Why this analysis matters operationally
77+
- **Expectation:** Desired format, depth, and deliverables
78+
79+
**Hands-on Practice (15 minutes):**
80+
- Participants work in pairs to rewrite poor prompts using CLEAR framework
81+
- Focus on realistic TRANSCOM scenarios (port operations, airlift coordination, convoy planning)
82+
83+
#### Module 3: Core Prompt Engineering Strategies (20 minutes)
84+
85+
##### Zero-Shot Learning
86+
- **Definition:** Task completion without examples
87+
- **TRANSCOM Application:** "Analyze this deployment TPFDD for potential bottlenecks"
88+
- **Best Practices:** Clear task definition, specific context, precise terminology
89+
90+
##### One-Shot Learning
91+
- **Definition:** Single example to guide response pattern
92+
- **Example:** Providing one completed risk assessment to generate similar analyses
93+
- **Use Case:** Standardizing report formats across commands
94+
95+
##### Few-Shot Learning
96+
- **Definition:** Multiple examples to establish patterns
97+
- **Military Application:**
98+
```
99+
Example 1: Convoy route analysis for Afghanistan terrain
100+
Example 2: Convoy route analysis for European operations
101+
Example 3: Convoy route analysis for Pacific theater
102+
Now analyze: [New route for Arctic operations]
103+
```
104+
105+
##### Chain of Thought (CoT) Prompting
106+
- **Definition:** Explicit step-by-step reasoning
107+
- **TRANSCOM Framework:**
108+
1. Assess transportation requirements
109+
2. Evaluate available assets and capacity
110+
3. Identify potential constraints and risks
111+
4. Develop recommendations with contingencies
112+
5. Present findings with confidence levels
113+
114+
**Interactive Exercise (10 minutes):**
115+
Participants practice CoT with deployment timeline analysis
116+
117+
#### Session 1 Wrap-up and Preview (10 minutes)
118+
- Key takeaways summary
119+
- Preview of Session 2 advanced techniques
120+
- Assignment: Identify one work scenario for Session 2 practice
121+
122+
---
123+
124+
## Session 2: Advanced Applications and Practical Implementation (90 minutes)
125+
126+
### Learning Objectives
127+
By the end of Session 2, participants will be able to:
128+
- **Apply:** Implement advanced prompting strategies for complex transportation problems
129+
- **Analyze:** Dissect multi-step logistics challenges using prompt chaining
130+
- **Evaluate:** Assess prompt effectiveness and iterate for improvement
131+
- **Create:** Design comprehensive prompt sequences for operational planning
132+
133+
### Session Structure
134+
135+
#### Review and Advanced Strategies (30 minutes)
136+
137+
##### Iterative Prompting
138+
- **Process:** Systematic refinement through follow-up queries
139+
- **TRANSCOM Example:**
140+
```
141+
Initial: "Analyze this TPFDD deployment schedule"
142+
Iteration 1: "Focus specifically on airlift capacity constraints in weeks 3-5"
143+
Iteration 2: "Provide alternative routing options for the identified bottlenecks"
144+
Iteration 3: "Calculate risk mitigation costs for each alternative"
145+
```
146+
147+
##### Negative Prompting
148+
- **Definition:** Explicitly stating what NOT to include
149+
- **Military Application:** "Analyze logistics requirements but do not include classified movement data or specific unit identifiers"
150+
- **Quality Control:** Preventing hallucination of sensitive information
151+
152+
##### Prompt Chaining
153+
- **Concept:** Linking multiple specialized prompts for complex workflows
154+
- **TRANSCOM Workflow Example:**
155+
1. **Analysis Prompt:** Document review and data extraction
156+
2. **Synthesis Prompt:** Pattern identification and trend analysis
157+
3. **Planning Prompt:** Recommendation generation
158+
4. **Validation Prompt:** Risk assessment and feasibility check
159+
5. **Communication Prompt:** Executive summary creation
160+
161+
##### Role-Based Prompting
162+
- **Strategy:** Assigning specific expertise personas to AI
163+
- **Examples:**
164+
- "As a Port Operations Manager with 20 years experience..."
165+
- "From the perspective of a Strategic Airlift Coordinator..."
166+
- "Acting as a Joint Logistics Planner familiar with CENTCOM operations..."
167+
168+
#### Practical Exercise Session (45 minutes)
169+
170+
### Challenge Exercise 1: Multimodal TPFDD Analysis (15 minutes)
171+
**Scenario:** Upload a sample TPFDD spreadsheet and related deployment order PDF
172+
**Task:** Create a prompt chain that:
173+
1. Extracts key deployment milestones and requirements
174+
2. Identifies potential transportation bottlenecks
175+
3. Generates risk mitigation recommendations
176+
4. Produces an executive briefing slide outline
177+
178+
**Learning Focus:** Document processing, data synthesis, chain of thought reasoning
179+
180+
**Sample Prompt Sequence:**
181+
```
182+
Prompt 1: "Analyze the uploaded TPFDD spreadsheet. Extract and summarize:
183+
- Total personnel and equipment to be moved
184+
- Critical deployment windows (C+30, C+60, C+90)
185+
- Transportation mode requirements
186+
- Geographic distribution of movements"
187+
188+
Prompt 2: "Based on your analysis, identify the top 3 potential bottlenecks
189+
in this deployment plan. For each bottleneck, provide:
190+
- Specific timing and location
191+
- Capacity constraints involved
192+
- Downstream operational impacts"
193+
194+
Prompt 3: "For each identified bottleneck, propose 2-3 mitigation strategies
195+
including resource requirements, timeline adjustments, and risk trade-offs."
196+
```
197+
198+
### Challenge Exercise 2: Crisis Response Planning (15 minutes)
199+
**Scenario:** Natural disaster response requiring rapid transportation coordination
200+
**Materials:** News reports (text), damage assessment images, available asset spreadsheets
201+
**Task:** Develop comprehensive response recommendations
202+
203+
**Complexity Factors:**
204+
- Multiple document types requiring synthesis
205+
- Time-critical decision making
206+
- Resource optimization under constraints
207+
- Stakeholder communication requirements
208+
209+
**Advanced Techniques Applied:**
210+
- Few-shot learning with historical disaster responses
211+
- Role-based prompting (Emergency Response Coordinator)
212+
- Negative prompting (excluding unavailable resources)
213+
- Chain of thought for systematic response planning
214+
215+
### Challenge Exercise 3: Strategic Asset Optimization (10 minutes)
216+
**Scenario:** Global repositioning of transportation assets for emerging threats
217+
**Materials:** Current asset deployment map (image), threat assessment reports (PDF), budget constraints (Excel)
218+
**Task:** Create optimal redeployment strategy
219+
220+
**Higher-Order Thinking Skills:**
221+
- **Analysis:** Asset utilization patterns and strategic positioning
222+
- **Evaluation:** Cost-benefit analysis of various scenarios
223+
- **Synthesis:** Integration of multiple data sources and constraints
224+
- **Creation:** Novel strategic positioning concepts
225+
226+
**Prompt Engineering Focus:**
227+
- Complex multi-step reasoning chains
228+
- Quantitative analysis integration
229+
- Strategic thinking prompts
230+
- Scenario planning techniques
231+
232+
### Challenge Exercise 4: Operational Security Assessment (5 minutes)
233+
**Scenario:** Review transportation plans for OPSEC vulnerabilities
234+
**Task:** Identify and recommend mitigation for operational security risks
235+
**Advanced Considerations:**
236+
- Negative prompting to avoid revealing sensitive information
237+
- Role-based expertise (Intelligence/Security Specialist)
238+
- Systematic vulnerability assessment methodology
239+
- Risk communication for different audiences
240+
241+
#### Integration and Implementation Planning (15 minutes)
242+
243+
##### Prompt Library Development
244+
- **Individual Action:** Each participant creates a personal prompt library
245+
- **Templates for Common Tasks:**
246+
- Route analysis and optimization
247+
- Capacity planning and resource allocation
248+
- Risk assessment and mitigation planning
249+
- Stakeholder communication and briefing preparation
250+
251+
##### Quality Assurance Framework
252+
- **Verification Strategies:**
253+
- Cross-referencing AI outputs with doctrine and regulations
254+
- Peer review processes for critical decisions
255+
- Iterative refinement based on operational feedback
256+
- Integration with existing TRANSCOM workflows
257+
258+
##### Ethical Considerations and Limitations
259+
- **Information Security:** Handling classified and sensitive data
260+
- **Decision Authority:** AI as decision support, not decision maker
261+
- **Bias Recognition:** Understanding AI limitations in military contexts
262+
- **Human Oversight:** Maintaining professional judgment and accountability
263+
264+
---
265+
266+
## Assessment and Evaluation Framework
267+
268+
### Formative Assessment (Throughout Both Sessions)
269+
- **Peer Review:** Participants evaluate each other's prompt construction
270+
- **Real-time Feedback:** Instructor coaching during hands-on exercises
271+
- **Self-Assessment:** Reflection on prompt effectiveness and iteration needs
272+
273+
### Summative Assessment (End of Session 2)
274+
- **Practical Demonstration:** Individual creation of prompt sequence for participant's actual work challenge
275+
- **Portfolio Development:** Collection of refined prompts for future use
276+
- **Action Planning:** Specific implementation commitments for workplace integration
277+
278+
### Evaluation Criteria
279+
**Bloom's Taxonomy Alignment:**
280+
- **Knowledge/Comprehension:** Accurate use of terminology and frameworks
281+
- **Application:** Successful prompt construction for realistic scenarios
282+
- **Analysis:** Effective breakdown of complex transportation challenges
283+
- **Synthesis:** Integration of multiple data sources and constraints
284+
- **Evaluation:** Critical assessment of AI outputs and iterative improvement
285+
286+
---
287+
288+
## Technology Integration Specifications
289+
290+
### Gemini LLM Capabilities Utilized
291+
- **Multimodal Processing:** PDF documents, Excel spreadsheets, images, text
292+
- **Large Context Window:** Complex document analysis and synthesis
293+
- **Code Interpretation:** Data analysis and visualization support
294+
- **Real-time Iteration:** Immediate feedback and refinement cycles
295+
296+
### Required Materials and Setup
297+
- **Digital Infrastructure:** Stable internet, Gemini access for all participants
298+
- **Sample Documents:**
299+
- Anonymized TPFDD spreadsheets
300+
- Deployment planning documents (PDFs)
301+
- Transportation network maps and imagery
302+
- Historical case studies and after-action reports
303+
- **Collaborative Tools:** Shared workspace for prompt library development
304+
305+
---
306+
307+
## Follow-up and Sustainability
308+
309+
### Immediate Post-Workshop Actions
310+
- **30-Day Implementation Challenge:** Participants commit to using prompt engineering in specific work contexts
311+
- **Peer Learning Network:** Establishment of TRANSCOM prompt engineering community of practice
312+
- **Resource Repository:** Shared library of effective prompts and templates
313+
314+
### Long-term Development Pathway
315+
- **Advanced Workshop Series:** Specialized applications for specific TRANSCOM functions
316+
- **Train-the-Trainer Program:** Developing internal capacity for prompt engineering instruction
317+
- **Integration with Professional Military Education:** Incorporation into logistics and transportation curricula
318+
319+
### Success Metrics
320+
- **Operational Impact:** Measurable improvements in planning efficiency and quality
321+
- **Adoption Rate:** Percentage of participants actively using prompt engineering techniques
322+
- **Innovation Indicators:** Novel applications and creative problem-solving approaches
323+
- **Knowledge Sharing:** Growth of internal expertise and peer-to-peer learning
324+
325+
---
326+
327+
## Appendices
328+
329+
### Appendix A: TRANSCOM-Specific Prompt Templates
330+
- Route optimization analysis
331+
- Asset utilization assessment
332+
- Risk evaluation frameworks
333+
- Stakeholder communication formats
334+
335+
### Appendix B: Troubleshooting Guide
336+
- Common prompt engineering challenges
337+
- Error recognition and correction strategies
338+
- Technical support resources
339+
340+
### Appendix C: Additional Resources
341+
- Recommended readings on AI in military logistics
342+
- Online communities and professional development opportunities
343+
- Advanced prompt engineering techniques and emerging practices

docs/PromptEng/.#prompteng.md

Lines changed: 1 addition & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1 @@
1+
[email protected].13119:1747769125

docs/mlpaths_grids.md

Lines changed: 1 addition & 1 deletion
Original file line numberDiff line numberDiff line change
@@ -197,7 +197,7 @@ timeline
197197
</div>
198198

199199

200-
:bookmark: [Prompt Engineering](PromptEng/)
200+
:bookmark: [Prompt Engineering](PromptEng/prompteng.md)
201201

202202

203203
***

0 commit comments

Comments
 (0)