Skip to content

Latest commit

 

History

History
45 lines (38 loc) · 6.59 KB

File metadata and controls

45 lines (38 loc) · 6.59 KB

Review Log

Status: scaffolded locally after Phase 1 patch
Purpose: human review history and pending review queue

Review Entries

Date Item Decision Review requirement Notes
2026-05-07 Initial public proof-stack scaffold scaffolded Human review required Earlier scaffold prepared claim routing, status control, and boundary review before broader public proof use.
2026-05-13 Phase 1 profile/proof-stack execution plan planned Human review required Plan authorized only the two control repositories: Franzabner and franzabner-proof-stack. No umbrella repo creation, supporting repo patch, push, publication, GitHub metadata change, or Hugging Face metadata change.
2026-05-13 Phase 1 local proof-stack patch scaffolded Human review required before push or public use Rebuilt this repo around the approved 17-repo architecture, status vocabulary, claim register, artifact status, boundary register, review log, and proof-entry template.
2026-05-13 Phase 2 modular/CAD public scaffold repos scaffolded Human review required before profile routing or proof promotion modular-infrastructure-studies and cad-mechanical-design-lab are public scaffold repos with validation scripts and first synthetic artifacts. They are not released, deployed, certified, product-ready, or proof-complete.
2026-05-14 Phase 3 electrical/embedded public scaffold repos scaffolded Human review required before proof promotion electrical-controls-architecture and embedded-hardware-lab are public scaffold repos with validation scripts and first synthetic artifacts. They are not released, deployed, certified, manufacturing-ready, product-ready, or proof-complete.
2026-05-14 Phase 4 simulation/data public scaffold repos scaffolded Human review required before proof promotion engineering-simulation-lab and data-model-infrastructure are public scaffold repos with validation scripts and first synthetic artifacts. They are not released, deployed, certified, benchmark-backed, physically validated, model-released, dataset-released, Space-released, fine-tuned-model-available, product-ready, or proof-complete.
2026-05-14 Phase 5 energy/civic production public scaffold repos scaffolded Human review required before proof promotion infrastructure-energy-studies and civic-infrastructure-production-systems are public scaffold repos with validation scripts and first synthetic artifacts. They are not released, deployed, certified-safe, proven-output, operational Foundation program evidence, school-deployed, production-recycling-line evidence, live-civic-node evidence, manufacturing-ready, product-ready, or proof-complete.
2026-05-14 Phase 6 standards/security/deliverables public scaffold repos scaffolded Human review required before proof promotion engineering-standards-and-validation, engineering-security-boundary, and engineering-deliverables-template are public scaffold repos with validation scripts and first synthetic artifacts. They are not released, certified, code-compliance approved, stamped, legally approved, customer-deliverable evidence, active-service evidence, model-released, dataset-released, Space-released, production-ready, or proof-complete.
2026-05-15 Phase 7 app/immersive/automation/agent public scaffold repos scaffolded Human review required before proof promotion application-development-systems, immersive-access-systems, automated-engineering-systems, and agentic-engineering-workforce are public scaffold repos with validation scripts and first synthetic artifacts. They are not live apps, deployed portals, production automation, active agent workforce evidence, autonomous production-agent evidence, active-customer evidence, released software, active-service evidence, production-ready, or proof-complete.

Required Future Reviews

Review Required before
Profile language review Pushing or publicly relying on the patched Franzabner profile files or Phase 2/3/4/5/6/7 scaffold links.
Proof matrix review Pushing or publicly relying on this proof stack as the control layer for Phase 2/3/4/5/6/7 scaffold routes.
Status vocabulary review Any status change beyond planned or scaffolded.
Boundary review Any supporting repo promotion, generated output, screenshot, CAD, KiCad, firmware, model/data artifact, Foundation-adjacent material, or client-related material.
Evidence review Any published or released claim, artifact release, model/dataset/Space claim, benchmark, eval result, product claim, deployment claim, service claim, or certification claim.
Metadata review Any GitHub profile bio, pin, repo description, topic, homepage, visibility, archive, or Hugging Face metadata change.
Umbrella repo creation review Creating any additional umbrella or supporting repository.
Supporting repo patch review Editing any existing narrow supporting repository.

Open Decisions

Decision Current state
Are Franzabner and franzabner-proof-stack safe to push as scaffolded Phase 1 control repos? Pending human review.
Are modular-infrastructure-studies and cad-mechanical-design-lab safe to route from Franzabner as scaffolded public proof surfaces? Pending human review of this routing patch.
Are electrical-controls-architecture and embedded-hardware-lab safe to route from Franzabner as scaffolded public proof surfaces? Pending human review of this routing patch.
Are engineering-simulation-lab and data-model-infrastructure safe to route from Franzabner as scaffolded public proof surfaces? Pending human review of this routing patch.
Are infrastructure-energy-studies and civic-infrastructure-production-systems safe to route from Franzabner as scaffolded public proof surfaces? Pending human review of this routing patch.
Are engineering-standards-and-validation, engineering-security-boundary, and engineering-deliverables-template safe to route from Franzabner as scaffolded public proof surfaces? Pending human review of this routing patch.
Are application-development-systems, immersive-access-systems, automated-engineering-systems, and agentic-engineering-workforce safe to route from Franzabner as scaffolded public proof surfaces? Pending human review of this routing patch.
Should any supporting narrow repo be rewritten, merged, replaced, archived, transferred, or made private/not-public? Pending separate repo-by-repo review.
Should any GitHub or Hugging Face metadata change? Not authorized by Phase 1.