Skip to content

chore(deps)(deps-dev): update pytest requirement from <9,>=8 to >=8,<10 in the dev-tools group #9

chore(deps)(deps-dev): update pytest requirement from <9,>=8 to >=8,<10 in the dev-tools group

chore(deps)(deps-dev): update pytest requirement from <9,>=8 to >=8,<10 in the dev-tools group #9

Triggered via pull request March 8, 2026 18:26
Status Failure
Total duration 53s
Artifacts

ci.yml

on: pull_request
Matrix: lint-and-test
Fit to window
Zoom out
Zoom in

Annotations

9 errors
lint-and-test (3.13)
Process completed with exit code 1.
lint-and-test (3.10)
The strategy configuration was canceled because "lint-and-test._3_13" failed
lint-and-test (3.10)
Process completed with exit code 1.
lint-and-test (3.14)
The strategy configuration was canceled because "lint-and-test._3_13" failed
lint-and-test (3.14)
The operation was canceled.
lint-and-test (3.11)
The strategy configuration was canceled because "lint-and-test._3_13" failed
lint-and-test (3.11)
The operation was canceled.
lint-and-test (3.12)
The strategy configuration was canceled because "lint-and-test._3_13" failed
lint-and-test (3.12)
The operation was canceled.