Description
Since this project is no longer need. I believe it is time that we redesign the goals of the project to something that will be used.
Acceptable Criteria
- design the purpose
- create/update the UML for the new goals
- create google sheet for the the features need
Description
Since this project is no longer need. I believe it is time that we redesign the goals of the project to something that will be used.
Acceptable Criteria