|**Wave 3 — ADR spikes (week 5, run alongside Wave 2 as a pair) — #143 DELIVERED 2026-04-15**||||
25
+
| ~~6~~ | ~~`/aod.define 143`~~ **[DONE]** | [#143](https://github.com/davidmatousek/tachi/issues/143) | ~~MAESTRO Phase 4: OWASP AIVSS evaluation ADR~~ — **DELIVERED 2026-04-15 via PR #167. ADR-024 (Accepted) documents tachi's decision to **diverge** from OWASP AIVSS at present time; existing four-dimensional weighted-sum composite remains canonical. Three-surface comparison (dimension space / formula shape / severity bands) and five-criteria justification (maturity, adoption, compatibility, effort, compliance value) recorded inline. Re-evaluation trigger: AIVSS v1.0 + first external adopter case study (tracked separately as Issue #168). 32 tasks complete + 1 N/A (T023 conditional skip — Option C path). Single-session, ~15min wall-clock against 1-2 day estimate; smooth sailing per retrospective. KB-032 captures three-surface comparison as a reusable pattern for future framework-evaluation ADRs. **Closes umbrella MAESTRO compliance discovery #136** (Phase 1 = 084 + Phase 2 = 141 + Phase 3 = 082 + Phase 4 = 143 all delivered).** |
26
+
| 7 |`/aod.define 144`|[#144](https://github.com/davidmatousek/tachi/issues/144)| MAESTRO companion: NIST AI RMF integration ADR — **paired research phase with #143 dissolved on solo run; runs standalone now**|
| 8 |~~*(re-scope check)*~~**DONE 2026-04-14**|[#98](https://github.com/davidmatousek/tachi/issues/98)|~~MAESTRO coverage matrix — investigate whether #141 subsumed this~~ — **NOT subsumed. Shrunk from 2-3 weeks to ~1 day. Real gap: every layer-aware view (threats.md "Risk by MAESTRO Layer", PDF MAESTRO Layer Analysis page, maestro-stack infographic) silently omits layers with zero findings (per `output-schemas.md` spec rule and `extract-report-data.py:388` filter). Reviewers cannot tell "analyzed but clean" from "not applicable" or "never analyzed." Fix: invert the omission rule across the 3 enforcement points; activate the existing dead-code empty-layer branch in `maestro-findings.typ:151-155`. Reschedule from Wave 4 to Wave 5 opportunistic. See [#98 comment](https://github.com/davidmatousek/tachi/issues/98#issuecomment-4247897465).**|
@@ -41,14 +41,16 @@ Run each `/aod.define` in order. Items on the same line can run in parallel.
41
41
3.~~Post re-scope comments on #98 and #69 to prevent duplicate work~~**DONE 2026-04-12** — scope overlap flag posted on #98 (gated on #141), scope adjacency flag posted on #69 (gated on #145).
42
42
4.~~Run `/aod.validate 126` and `/aod.validate 62` to get bodies and ICE scores on stub issues~~**DONE 2026-04-12** — #126 "Auto-detect architecture drift" scored ICE 17 (I:9 C:5 E:3), #62 "Custom brand presets" scored ICE 16 (I:6 C:5 E:5). Both above defer gate, both remain Wave 5 opportunistic.
**Next up now that Waves 0, 1, 2 are fully delivered**:
46
+
**Next up now that Waves 0, 1, 2 and the AIVSS half of Wave 3 are delivered**:
47
+
-**#143 DELIVERED 2026-04-15** — OWASP AIVSS evaluation ADR shipped as PR #167. ADR-024 (Accepted) documents tachi's posture: **diverge** from AIVSS at present time. Three-surface comparison (dimension space / formula shape / severity bands) + five-criteria justification recorded inline. Re-evaluation trigger encoded inline (AIVSS v1.0 + first external adopter case study) and tracked as Issue #168. **Closes umbrella MAESTRO compliance discovery #136** — all four phases (084/141/082/143) delivered. KB-032 captures the three-surface comparison as a reusable pattern. ADR-024 is the second tachi ADR to use a "When to Re-Evaluate" trigger clause (joining ADR-022's Future Work pattern) — this is now the recommended ADR shape for any decision that has a known external dependency timeline.
47
48
-**#129 DELIVERED 2026-04-14** — attack tree delta sub-agent shipped as PR #162. Parent-leaf decomposition with structured JSON manifest IPC. Rule 3 reconciliation now actually fires (the original bug — it never fired in practice). Sidecar PR #164 added auto-detection of newest `docs/security/<timestamp>/` run directory across the four downstream tachi commands.
48
-
-**Recommended next: Wave 3 ADR pair — `/aod.define 143` + `/aod.define 144`** (OWASP AIVSS ADR + NIST AI RMF ADR). Pure research/documentation scope, paired research phase, single `/aod.define` cycle covers both in ~1 week vs 2 weeks if sequenced. Both reference canonical MAESTRO complementary frameworks.
49
+
-**Recommended next: `/aod.define 144`** (NIST AI RMF integration ADR). Original plan paired #143 + #144 in a single `/aod.define` cycle for overlapping research economy; #143 ran solo and shipped under the original 1-week estimate, so #144 is now a standalone ADR spike. Same shape as #143 (research → ADR → optional follow-on Issue per FR-7 conditionality). The three-surface comparison pattern from KB-032 should apply to the NIST AI RMF evaluation as well.
49
50
-**#98 re-scope check DONE 2026-04-14** — NOT subsumed by #141. Shrunk from 2-3 weeks to ~1 day; rescheduled to Wave 5 opportunistic. Gap is real: layer-aware views silently omit zero-finding layers, hiding "analyzed but clean" vs "not applicable." Fix is a 3-point omission-rule inversion. See [#98 comment](https://github.com/davidmatousek/tachi/issues/98#issuecomment-4247897465).
50
-
-**Wave 4 (after Wave 3)**: #142 (MAESTRO Phase 3 agentic patterns), #145 (MAESTRO canonical worked example). Both unblocked, both benefit from Phase 2 chains being in place.
51
+
-**Wave 4 (after #144 lands or in parallel with #144)**: #142 (MAESTRO Phase 3 agentic patterns), #145 (MAESTRO canonical worked example). Both unblocked, both benefit from Phase 2 chains being in place.
51
52
-**ADR-022 (Feature 130 output) establishes new precedent** — any future CLI prerequisite (third-party binary, renderer, compiler required at runtime) now follows the defense-in-depth two-gate pattern: shell-level preflight in the command file + Python-level `shutil.which` raise at the function boundary, gated on input detection, with a Future Work clause for helper extraction once a third CLI prereq is added.
53
+
-**ADR-024 (Feature 143 output) establishes second precedent** — any future evaluation of an external scoring framework (CVSS variants, AI risk models, alternative composite schemes) should use the three-surface decomposition (dimension space + formula shape + severity bands) backed by a five-criteria justification (maturity, adoption, compatibility, effort, compliance value) and a "When to Re-Evaluate" trigger clause with concrete external conditions. Per KB-032.
52
54
53
55
---
54
56
@@ -80,7 +82,7 @@ These are small ADR-only scopes where `/aod.run` can handle research and draftin
80
82
81
83
| Issue | Why pause before Build |
82
84
|-------|------------------------|
83
-
|[#143](https://github.com/davidmatousek/tachi/issues/143) AIVSS ADR|Output is literally a decision document; review before committing |
85
+
|~~[#143](https://github.com/davidmatousek/tachi/issues/143) AIVSS ADR~~**[DONE 2026-04-15]**|~~Output is literally a decision document; review before committing~~ — **Delivered via PR #167. Manual orchestration (Triad-governed `/aod.define` → `/aod.plan` → `/aod.build`) chosen over `/aod.run` because the decision (Diverge / Adopt-Primary / Adopt-Supplementary) required human judgment on AIVSS maturity and CVSS-version conflict. ADR-024 Accepted. The "review before committing" guidance held — architect approval at PR review served as the Accepted-at-merge attestation per ADR-024 frontmatter.**|
84
86
|[#144](https://github.com/davidmatousek/tachi/issues/144) NIST AI RMF ADR | Same — review draft before Build commits the ADR |
85
87
86
88
### Manual orchestration (avoid `/aod.run`)
@@ -174,16 +176,16 @@ Both items run in parallel because they touch different parts of the pipeline. #
These two are pure documentation and research work with overlapping research phases. They can happen during the same weeks as Wave 1 or Wave 2 implementation without competing for engineering resources.
181
+
These two are pure documentation and research work with originally-overlapping research phases. The pairing was dissolved on solo run — #143 shipped standalone in a single session and well under estimate; #144 now runs as a standalone ADR spike.
180
182
181
-
| Order | Issue | Why now | Effort |Pairing|
182
-
|-------|-------|---------|--------|---------|
183
-
|6|[#143](https://github.com/davidmatousek/tachi/issues/143) OWASP AIVSS ADR | ICE 22 but tiny scope (ADR only); canonical MAESTRO references AIVSS as companion scoring framework |~1 week |Pair with #144|
184
-
| 7 |[#144](https://github.com/davidmatousek/tachi/issues/144) NIST AI RMF ADR | ICE 20; canonical MAESTRO references NIST AI RMF alongside AIVSS as complementary framework |~1 week |Pair with #143|
183
+
| Order | Issue | Why now | Effort |Actual result / pairing|
|~~6~~|~~[#143](https://github.com/davidmatousek/tachi/issues/143) OWASP AIVSS ADR~~|~~ICE 22 but tiny scope (ADR only); canonical MAESTRO references AIVSS as companion scoring framework~~| ~~~1 week~~|**DELIVERED 2026-04-15** — PR #167, single-session ~15min wall-clock against 1-2d estimate. ADR-024 Accepted. Decision: Diverge (Option C). Closes umbrella MAESTRO #136. KB-032 captures the three-surface comparison pattern as reusable.|
186
+
| 7 |[#144](https://github.com/davidmatousek/tachi/issues/144) NIST AI RMF ADR | ICE 20; canonical MAESTRO references NIST AI RMF alongside AIVSS as complementary framework |~1 week |Standalone now (pairing dissolved on #143 solo run)|
185
187
186
-
Run both as a single `/aod.define` cycle because the research phase overlaps almost entirely: read canonical MAESTRO sources, evaluate external framework integration depth, commit ADRs. One week total for both paired versus two weeks if sequenced.
188
+
The original "single `/aod.define` cycle for paired research" plan was dissolved when #143 shipped solo well under its own estimate. #144 should now be planned as a standalone ADR spike following the same shape: research → ADR → optional follow-on Issue per FR-7 conditionality. Apply the three-surface comparison pattern (KB-032) to NIST AI RMF for shape consistency with ADR-024.
187
189
188
190
### Wave 4 — MAESTRO enhancements (weeks 6-8)
189
191
@@ -218,14 +220,14 @@ Run both as a single `/aod.define` cycle because the research phase overlaps alm
#143 ─┬─ pair (overlapping research phase) — RECOMMENDED NEXT
222
-
#144 ─┘
223
+
#143 [DONE 2026-04-15] ─── (umbrella #136 closes; pairing with #144 dissolved on solo run)
224
+
#144 ─── standalone ADR spike — RECOMMENDED NEXT
223
225
224
226
#55, #126, #62, #46 ─── all independent
225
227
#69 ─── overlaps #145, re-scope after #145 lands
226
228
```
227
229
228
-
**Waves 0, 1, 2 fully delivered** — all 5 prerequisite items closed by 2026-04-14. Wave 3 (#143+ #144 ADR pair) is the recommended next item. Wave 4 (#142, #145, #98 re-scope) follows.
230
+
**Waves 0, 1, 2 fully delivered; Wave 3 half delivered** — all 5 prerequisite items closed by 2026-04-14, plus #143 closed 2026-04-15. The umbrella MAESTRO compliance discovery #136 is now closed (all four phases — 084 / 141 / 082 / 143 — delivered). Wave 3 remainder (#144) is the recommended next item; Wave 4 (#142, #145, #98 re-scope) follows.
229
231
230
232
---
231
233
@@ -280,7 +282,9 @@ This plan is a snapshot as of 2026-04-10. Re-generate or revise when:
280
282
-~~#141 ships (re-scope #98 and #69; #142 and #145 become high-priority)~~**Triggered 2026-04-12 — PR #159, #142 and #145 now high-priority, #98 re-scope actionable**
281
283
-~~#82 ships (#129 becomes unblocked)~~**Triggered 2026-04-12 — #129 now unblocked, Wave 2 is actionable**
282
284
-~~#129 ships (closes Wave 2)~~**Triggered 2026-04-14 — PR #162, ~1 day wall-clock; sidecar PR #164 fixed cwd auto-detection bug across four tachi commands. Wave 3 (#143 + #144 ADR pair) is the recommended next item.**
283
-
-**Wave 2 fully delivered 2026-04-14** — Wave 3 ADR pair is the active frontier; Wave 4 (#142, #145, #98 re-scope) follows.
285
+
-**Wave 2 fully delivered 2026-04-14** — Wave 3 ADR pair was the active frontier; Wave 4 (#142, #145, #98 re-scope) follows.
286
+
-~~#143 ships (half of Wave 3 closes; #144 remains as standalone ADR spike; umbrella #136 may close)~~**Triggered 2026-04-15 — PR #167, single-session ~15min wall-clock against 1-2d estimate. ADR-024 Accepted (Diverge from AIVSS at present time). Wave 3 pairing dissolved on solo run; #144 now runs standalone. Umbrella MAESTRO compliance #136 closed (all four phases — 084/141/082/143 — delivered). KB-032 captures three-surface comparison as reusable pattern for future framework-evaluation ADRs. Issue #168 created to track AIVSS v1.0 + first external adopter case study (the inline re-evaluation trigger from ADR-024).**
287
+
-**Wave 3 half delivered 2026-04-15** — #143 (AIVSS) closed; #144 (NIST AI RMF) remains as the next standalone ADR spike. Wave 4 (#142, #145, #98 re-scope) is the next major frontier.
284
288
- A critical bug enters the backlog that pre-empts Wave 0
285
289
286
290
Source of truth is always GitHub Issues, not this file or BACKLOG.md.