SKILL-REGISTRY.md — Project Management Skills Repository
Version: 1.3.1
Status: Active · Maintained
Authority: PMBOK8 · Artifacts-V-1.1 · Repository Operating Rules
Last Updated: 2026-06-03
File Path: SKILL-REGISTRY.md
This registry is the single authoritative index of all skills in the PM Skills Repository. It catalogs every skill by ID, pack, name, status, primary artifact, PMBOK8 anchor, and dependency chain. It does not duplicate skill content — it indexes it.
Use this registry to:
Determine which skills exist and their current build status
Identify upstream prerequisites before executing a skill
Trace which artifact each skill produces or updates
Plan the remaining skill build order
Confirm pack completeness before declaring a pack ready for use
Each skill entry contains the following fields:
Field
Description
Skill ID
Unique identifier — format: SKL-PP-NN where PP = pack number, NN = sequence within pack
Skill Name
Full name matching the skill file heading
Pack
Lifecycle pack number and name
Status
Draft · Untested / Draft · In Review / Reviewed / Approved · Production
Source Type
PMI-derived / organization-defined / synthesis
Primary Artifact (Output)
The artifact this skill produces or whose primary section it populates
Artifacts Updated
Additional artifacts modified as outputs
PMBOK8 Process Anchor
The PMBOK8 Guide process or section this skill operationalizes
Performance Domains
PMBOK8 performance domains this skill operates within
Focus Area
PMBOK8 focus area(s): Initiating / Planning / Executing / Monitoring and Controlling / Closing
Upstream Prerequisites
Skills that must complete before this skill can execute
Downstream Skills
Skills that consume this skill's outputs
File Path
Relative path to the skill markdown file
Notes
Key design decisions, constraints, or open items
Pack
Name
Skills Built
Skills Planned
Total
Status
01
Organizational Setup
3
0
3
✅ Complete
02
Initiating
2
0
2
✅ Complete
03
Planning
22
0
22
✅ Complete
04
Executing
9
0
9
✅ Complete
05
Monitoring & Controlling
10
0
10
✅ Complete
06
Closing
3
0
3
✅ Complete
07
Adaptive & Hybrid
4
0
4
✅ Complete
08
PMO Governance
5
0
5
✅ Complete
—
TOTAL
58 built
0 planned
58
✅ All built
Pack 01 — Organizational Setup
Pack Purpose: Skills that establish the organizational foundation required before any project can be initiated — governance framework, document and artifact control standards, and repository/tool environment configuration. These skills run once per organizational setup or when a significant structural change occurs. All downstream packs depend on these foundations being in place.
Pack Prerequisites: A business case or authorization trigger (A01) must exist before SKL-01-01 runs. No prior skill prerequisites.
Pack Completion Criteria: A05 Governance section baselined · A05 Document Control Standards baselined · A03 Repository and Tool Configuration Record baselined · Repository folder structure verified and accessible.
SKL-01-01 — Establish PM Governance Framework
Field
Value
Skill ID
SKL-01-01
Skill Name
Establish PM Governance Framework
Pack
01 — Organizational Setup
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A05 — Context Register (Governance section)
Artifacts Updated
A06 — Project Management Plan (governance reference) · A04 — Project Charter (authority thresholds reference)
PMBOK8 Process Anchor
PMBOK8 Standard §3 Principles · Guide §2.1 Project Integration Management · AUTHORITY-ROUTING.md
Performance Domains
Governance · Stakeholders
Focus Area
Organizational Setup
Upstream Prerequisites
A01 — Business Case or equivalent authorization trigger must exist
Downstream Skills
SKL-01-02 · SKL-01-03 · SKL-02-01
File Path
skills/01-organizational-setup/SKL-01-01-establish-pm-governance-framework.md
Notes
Defines authority thresholds, decision rights, governance RACI, escalation path, meeting cadence, and compliance obligations. Must align with AUTHORITY-ROUTING.md. Re-run at program level or for projects with unique governance requirements. 9 tests.
SKL-01-02 — Define Artifact and Document Control Standards
Field
Value
Skill ID
SKL-01-02
Skill Name
Define Artifact and Document Control Standards
Pack
01 — Organizational Setup
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A05 — Context Register (OPA / Document Control Standards section)
Artifacts Updated
A06 — Project Management Plan (document control reference)
PMBOK8 Process Anchor
PMBOK8 Standard §3 Principles · Guide §2.1.6.4 Manage Project Knowledge · Artifacts-V-1.1
Performance Domains
Governance · Delivery
Focus Area
Organizational Setup
Upstream Prerequisites
SKL-01-01 — A05 Governance section must be baselined
Downstream Skills
SKL-01-03 · SKL-02-01 · All artifact-producing skills (Pack 02 through Pack 07)
File Path
skills/01-organizational-setup/SKL-01-02-define-artifact-and-document-control-standards.md
Notes
Defines naming conventions (A##-kebab-case.md), semantic versioning (major/minor/patch), six-status lifecycle, artifact ownership, baseline/change control rules per artifact type, and archiving/retention rules. Artifacts-V-1.1 is the authoritative artifact registry. 9 tests.
SKL-01-03 — Configure Project Repository and Tool Environment
Field
Value
Skill ID
SKL-01-03
Skill Name
Configure Project Repository and Tool Environment
Pack
01 — Organizational Setup
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A03 — Repository and Tool Configuration Record
Artifacts Updated
A05 — Context Register (EEF / tool environment section) · A06 — Project Management Plan (tool environment reference)
PMBOK8 Process Anchor
PMBOK8 Standard §3 Principles · Guide §2.1.6.4 Manage Project Knowledge · Guide §2.6 Resource Management
Performance Domains
Governance · Resources · Delivery
Focus Area
Organizational Setup
Upstream Prerequisites
SKL-01-01 — A05 Governance section must be baselined · SKL-01-02 — A05 Document Control Standards must be baselined
Downstream Skills
SKL-02-01 · All Pack 02 through Pack 07 skills
File Path
skills/01-organizational-setup/SKL-01-03-configure-project-repository-and-tool-environment.md
Notes
Configures canonical folder structure, version control settings (branch naming, commit conventions, branch protection), access controls, tool integrations (CI/CD, MCP server, agent pipelines), and repository readiness checklist. Creates A03 as the single authority for repository and tool configuration. 9 tests.
Pack Purpose: Skills that execute during the Initiating focus area — authorizing the project, establishing governance context, identifying stakeholders, and producing the foundational records that all planning skills depend on.
Pack Prerequisites: A business case or equivalent authorization trigger must exist before any Pack 02 skill runs. Pack 01 (Organizational Setup) must be complete.
Pack Completion Criteria: A04 (Project Charter), A05 (Context Register), and A07 (Stakeholder Register — Identification section) must all be baselined before Pack 03 skills begin.
SKL-02-01 — Initiate Project or Phase
Field
Value
Skill ID
SKL-02-01
Skill Name
Initiate Project or Phase
Pack
02 — Initiating
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A04 — Project Charter
Artifacts Updated
A05 — Context Register · A02 — Benefits and Value Measurement Record
PMBOK8 Process Anchor
Guide §2.1.6.1 Initiate Project or Phase · Figure 2-3
Performance Domains
Governance · Stakeholders
Focus Area
Initiating
Upstream Prerequisites
A01 (Business Case) must exist · Pack 01 complete
Downstream Skills
SKL-02-02 · All Pack 03 skills
File Path
skills/02-initiating/SKL-02-01-initiate-project-or-phase.md
Notes
Charter is the enabling artifact for all downstream work. Includes predictive and adaptive tailoring paths.
SKL-02-02 — Identify Stakeholders
Field
Value
Skill ID
SKL-02-02
Skill Name
Identify Stakeholders
Pack
02 — Initiating
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A07 — Stakeholder Register and Engagement Strategy (Identification section)
Artifacts Updated
A05 — Context Register · A19 — Risk Management Record
PMBOK8 Process Anchor
Guide §2.5.2.1 Identify Stakeholders · Figure 2-33
Performance Domains
Stakeholders · Governance
Focus Area
Initiating
Upstream Prerequisites
SKL-02-01
Downstream Skills
SKL-03-07
File Path
skills/02-initiating/SKL-02-02-identify-stakeholders.md
Notes
Power/Interest Grid + Salience Model core technique. Re-run triggers: phase gates, new stakeholders, major scope/authority changes.
Pack Purpose: Skills that execute during the Planning focus area — translating authorization and context into actionable project management plans, baselines, and subsidiary plans.
Pack Prerequisites: All Pack 02 skills must complete before Pack 03 begins.
Pack Completion Criteria: A14 (Integrated PM Plan) assembled and baselined before Pack 04 begins.
SKL-03-01 — Integrate and Align Project Plans
Field
Value
Skill ID
SKL-03-01
Skill Name
Integrate and Align Project Plans
Pack
03 — Planning
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A14 — Integrated Project Management Plan
PMBOK8 Process Anchor
Guide §2.1.6.2 · Figure 2-4
Performance Domains
Governance · All domains
Focus Area
Planning
Upstream Prerequisites
All applicable Pack 03 planning skills
Downstream Skills
All Pack 04 skills
File Path
skills/03-planning/SKL-03-01-integrate-align-project-plans.md
Notes
Final Pack 03 skill — assembles all subsidiary plans into A14. Build last.
SKL-03-02 — Plan Scope Management
Field
Value
Skill ID
SKL-03-02
Skill Name
Plan Scope Management
Pack
03 — Planning
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A08 — Scope Management Plan section
PMBOK8 Process Anchor
Guide §2.2.2.1 · Figure 2-14
Performance Domains
Scope · Governance
Focus Area
Planning
Upstream Prerequisites
SKL-02-01 · SKL-02-02
Downstream Skills
SKL-03-03
File Path
skills/03-planning/SKL-03-02-plan-scope-management.md
SKL-03-03 — Elicit and Analyze Requirements
Field
Value
Skill ID
SKL-03-03
Skill Name
Elicit and Analyze Requirements
Pack
03 — Planning
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A08 — Requirements section
PMBOK8 Process Anchor
Guide §2.2.2.2 · Figure 2-15
Performance Domains
Scope · Stakeholders
Focus Area
Planning
Upstream Prerequisites
SKL-03-02 · SKL-02-02
Downstream Skills
SKL-03-04 · SKL-03-08
File Path
skills/03-planning/SKL-03-03-elicit-analyze-requirements.md
Field
Value
Skill ID
SKL-03-04
Skill Name
Define Scope
Pack
03 — Planning
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A08 — Project Scope Statement section
PMBOK8 Process Anchor
Guide §2.2.2.3 · Figure 2-16
Performance Domains
Scope · Governance
Focus Area
Planning
Upstream Prerequisites
SKL-03-03
Downstream Skills
SKL-03-05
File Path
skills/03-planning/SKL-03-04-define-scope.md
SKL-03-05 — Develop Scope Structure
Field
Value
Skill ID
SKL-03-05
Skill Name
Develop Scope Structure
Pack
03 — Planning
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A08 — WBS / Scope Structure section
PMBOK8 Process Anchor
Guide §2.2.2.4 · Figure 2-17
Performance Domains
Scope · Schedule
Focus Area
Planning
Upstream Prerequisites
SKL-03-04
Downstream Skills
SKL-03-06 · SKL-03-13 · SKL-03-16
File Path
skills/03-planning/SKL-03-05-develop-scope-structure.md
SKL-03-06 — Plan Schedule Management
Field
Value
Skill ID
SKL-03-06
Skill Name
Plan Schedule Management
Pack
03 — Planning
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A15 — Schedule Management Plan section
PMBOK8 Process Anchor
Guide §2.3.2.1 · Figure 2-21
Performance Domains
Schedule · Governance
Focus Area
Planning
Upstream Prerequisites
SKL-03-05 · SKL-02-01
Downstream Skills
SKL-03-06b Develop Schedule
File Path
skills/03-planning/SKL-03-06-plan-schedule-management.md
SKL-03-07 — Plan Stakeholder Engagement
Field
Value
Skill ID
SKL-03-07
Skill Name
Plan Stakeholder Engagement
Pack
03 — Planning
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A07 — Engagement Strategy section
Artifacts Updated
A19 — engagement risks · A14 — subsidiary reference
PMBOK8 Process Anchor
Guide §2.5.2.2 · Figure 2-34
Performance Domains
Stakeholders · Governance
Focus Area
Planning
Upstream Prerequisites
SKL-02-02
Downstream Skills
SKL-03-08 · SKL-04-06 · SKL-05-07
File Path
skills/03-planning/SKL-03-07-plan-stakeholder-engagement.md
Notes
SEAM is embedded in A07. Inseparable upstream pair with SKL-03-08.
SKL-03-08 — Plan Communications Management
Field
Value
Skill ID
SKL-03-08
Skill Name
Plan Communications Management
Pack
03 — Planning
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A28 — Communications and Reporting Record
Artifacts Updated
A07 · A15 · A14
PMBOK8 Process Anchor
Guide §2.5.2.3 · Figure 2-35
Performance Domains
Stakeholders · Governance
Focus Area
Planning
Upstream Prerequisites
SKL-03-07
Downstream Skills
SKL-04-07 · SKL-05-09
File Path
skills/03-planning/SKL-03-08-plan-communications-management.md
Notes
A28 = single merged communications record. A07 ↔ A28 consistency enforced.
SKL-03-09 — Plan Risk Management
Field
Value
Skill ID
SKL-03-09
Skill Name
Plan Risk Management
Pack
03 — Planning
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A19 — Risk Management Plan section
PMBOK8 Process Anchor
Guide §2.7.2.1 · Figure 2-48
Performance Domains
Risk · Governance
Focus Area
Planning
Upstream Prerequisites
SKL-02-01 · SKL-02-02 · SKL-03-07
Downstream Skills
SKL-03-10
File Path
skills/03-planning/SKL-03-09-plan-risk-management.md
SKL-03-10 — Identify Risks
Field
Value
Skill ID
SKL-03-10
Skill Name
Identify Risks
Pack
03 — Planning
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A19 — Risk Register section
PMBOK8 Process Anchor
Guide §2.7.2.2 · Figure 2-49
Performance Domains
Risk · Scope · Schedule
Focus Area
Planning
Upstream Prerequisites
SKL-03-09
Downstream Skills
SKL-03-11
File Path
skills/03-planning/SKL-03-10-identify-risks.md
SKL-03-11 — Perform Risk Analysis
Field
Value
Skill ID
SKL-03-11
Skill Name
Perform Risk Analysis
Pack
03 — Planning
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A19 — Risk Analysis section · A20 (conditional)
PMBOK8 Process Anchor
Guide §2.7.2.3 · Figure 2-50
Performance Domains
Risk · Finance
Focus Area
Planning
Upstream Prerequisites
SKL-03-10
Downstream Skills
SKL-03-12
File Path
skills/03-planning/SKL-03-11-perform-risk-analysis.md
SKL-03-12 — Plan Risk Responses
Field
Value
Skill ID
SKL-03-12
Skill Name
Plan Risk Responses
Pack
03 — Planning
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A19 — Risk Response section
PMBOK8 Process Anchor
Guide §2.7.2.4 · Figure 2-51
Performance Domains
Risk · Finance · Stakeholders
Focus Area
Planning
Upstream Prerequisites
SKL-03-11
Downstream Skills
SKL-04-08 · SKL-05-06
File Path
skills/03-planning/SKL-03-12-plan-risk-responses.md
SKL-03-13 — Plan Financial Management
Field
Value
Skill ID
SKL-03-13
Skill Name
Plan Financial Management
Pack
03 — Planning
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A16 — Financial Management Plan section
PMBOK8 Process Anchor
Guide §2.4.2.1 · Figure 2-27
Performance Domains
Finance · Governance
Focus Area
Planning
Upstream Prerequisites
SKL-02-01 · SKL-03-05
Downstream Skills
SKL-03-14 · SKL-03-15
File Path
skills/03-planning/SKL-03-13-plan-financial-management.md
SKL-03-14 — Estimate Costs
Field
Value
Skill ID
SKL-03-14
Skill Name
Estimate Costs
Pack
03 — Planning
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A16 — Cost Estimates section
PMBOK8 Process Anchor
Guide §2.4.2.2 · Figure 2-28
Performance Domains
Finance · Risk
Focus Area
Planning
Upstream Prerequisites
SKL-03-13 · SKL-03-05
Downstream Skills
SKL-03-15
File Path
skills/03-planning/SKL-03-14-estimate-costs.md
SKL-03-15 — Develop Budget
Field
Value
Skill ID
SKL-03-15
Skill Name
Develop Budget
Pack
03 — Planning
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A16 — Cost Baseline / BAC section
PMBOK8 Process Anchor
Guide §2.4.2.3 · Figure 2-29
Performance Domains
Finance · Governance
Focus Area
Planning
Upstream Prerequisites
SKL-03-14 · SKL-03-11
Downstream Skills
SKL-05-05
File Path
skills/03-planning/SKL-03-15-develop-budget.md
SKL-03-16 — Plan Resource Management
Field
Value
Skill ID
SKL-03-16
Skill Name
Plan Resource Management
Pack
03 — Planning
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A26 — Resource Management Plan section
PMBOK8 Process Anchor
Guide §2.6.2.1 · Figure 2-41
Performance Domains
Resources · Governance
Focus Area
Planning
Upstream Prerequisites
SKL-02-01 · SKL-03-05
Downstream Skills
SKL-03-17 · SKL-04-03
File Path
skills/03-planning/SKL-03-16-plan-resource-management.md
SKL-03-17 — Estimate Resources
Field
Value
Skill ID
SKL-03-17
Skill Name
Estimate Resources
Pack
03 — Planning
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A26 — Resource Estimates section
PMBOK8 Process Anchor
Guide §2.6.2.2 · Figure 2-42
Performance Domains
Resources · Schedule · Finance
Focus Area
Planning
Upstream Prerequisites
SKL-03-16
Downstream Skills
SKL-04-03
File Path
skills/03-planning/SKL-03-17-estimate-resources.md
SKL-03-18 — Integrate Sustainability Into Project Planning
Field
Value
Skill ID
SKL-03-18
Skill Name
Integrate Sustainability Into Project Planning
Pack
03 — Planning
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A-NEW-SUST — Sustainability Register
PMBOK8 Process Anchor
Standard §3.6 · Guide §2.5.2
Performance Domains
Scope · Resources · Risk
Focus Area
Planning
Upstream Prerequisites
SKL-02-01 · SKL-02-02 · SKL-03-02
Downstream Skills
SKL-03-14 · SKL-04-09 · SKL-05-01
File Path
skills/03-planning/SKL-03-18-integrate-sustainability-into-project-planning.md
SKL-03-06b — Develop and Baseline Schedule (Detailed)
Field
Value
Skill ID
SKL-03-06b
Skill Name
Develop and Baseline Schedule (Detailed)
Pack
03 — Planning
Status
Active · Tested
Source Type
PMI-derived
Primary Artifact (Output)
A15 — Schedule Model and Baseline Record
Artifacts Updated
A14 (Integrated PM Plan)
PMBOK8 Process Anchor
Guide §2.3.2.2 Develop Schedule · Guide §2.3 Schedule Domain
Performance Domains
Schedule
Focus Area
Planning
Upstream Prerequisites
SKL-03-06 · SKL-03-05
Downstream Skills
SKL-03-15 · SKL-05-04
File Path
skills/03-planning/SKL-03-06b-develop-schedule.md
SKL-03-19 — Plan Quality Management
Field
Value
Skill ID
SKL-03-19
Skill Name
Plan Quality Management
Pack
03 — Planning
Status
Active · Tested
Source Type
PMI-derived
Primary Artifact (Output)
A06 — Project Management Plan (Quality Management section)
Artifacts Updated
A14 (Integrated PM Plan)
PMBOK8 Process Anchor
Guide §2.2.2.6 · Guide §2.1.6.5 Manage Quality Assurance · Standard §3.5 Embed Quality
Performance Domains
Scope · Governance
Focus Area
Planning
Upstream Prerequisites
SKL-03-03 · SKL-03-04
Downstream Skills
SKL-04-01 · SKL-05-09
File Path
skills/03-planning/SKL-03-19-plan-quality-management.md
SKL-03-20 — Plan Procurement Management
Field
Value
Skill ID
SKL-03-20
Skill Name
Plan Procurement Management
Pack
03 — Planning
Status
Active · Tested
Source Type
PMI-derived
Primary Artifact (Output)
A06 — Project Management Plan (Procurement Management section)
Artifacts Updated
A31 — Procurement and Supplier Management Record
PMBOK8 Process Anchor
Guide §2.1.6.3 Plan Sourcing Strategy · Guide §2.1 Governance Domain
Performance Domains
Governance
Focus Area
Planning
Upstream Prerequisites
SKL-03-01 · SKL-03-03
Downstream Skills
SKL-04-09 · SKL-05-08
File Path
skills/03-planning/SKL-03-20-plan-procurement-management.md
SKL-03-21 — Develop Requirements Traceability Matrix
Field
Value
Skill ID
SKL-03-21
Skill Name
Develop Requirements Traceability Matrix
Pack
03 — Planning
Status
Active · Tested
Source Type
PMI-derived
Primary Artifact (Output)
A08 — Scope and Requirements Decision Record (RTM section)
Artifacts Updated
A14 (Integrated PM Plan)
PMBOK8 Process Anchor
Guide §2.2.2.2 Elicit and Analyze Requirements · Guide §2.2 Scope Domain
Performance Domains
Scope
Focus Area
Planning
Upstream Prerequisites
SKL-03-03 · SKL-03-04
Downstream Skills
SKL-05-03 · SKL-05-09
File Path
skills/03-planning/SKL-03-21-develop-requirements-traceability-matrix.md
Pack Purpose: Skills that execute during the Executing focus area — directing and managing work, acquiring and developing resources, managing stakeholder and team engagement, managing communications, procurements, knowledge, and implementing risk responses.
Pack Prerequisites: A14 (Integrated PM Plan) must be baselined. All applicable Pack 03 skills must be complete.
Pack Completion Criteria: All deliverables under execution; issue log (A18), risk response log (A19), and communications delivery log (A28) are actively maintained.
SKL-04-01 — Direct and Manage Project Work
Field
Value
Skill ID
SKL-04-01
Skill Name
Direct and Manage Project Work
Pack
04 — Executing
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A18 — Issue Log
Artifacts Updated
A14 · A15 · A16 · A19
PMBOK8 Process Anchor
Guide §2.1.6.3 Direct and Manage Project Work · Figure 2-5
Performance Domains
Delivery · Governance
Focus Area
Executing
Upstream Prerequisites
SKL-03-01 (A14 baselined)
Downstream Skills
SKL-05-01 · SKL-04-02
File Path
skills/04-executing/SKL-04-01-direct-and-manage-project-work.md
SKL-04-02 — Manage Project Knowledge
Field
Value
Skill ID
SKL-04-02
Skill Name
Manage Project Knowledge
Pack
04 — Executing
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A21 — Lessons Learned Register
Artifacts Updated
A05 — OPA
PMBOK8 Process Anchor
Guide §2.1.6.4 Manage Project Knowledge · Figure 2-6
Performance Domains
Governance · Team
Focus Area
Executing
Upstream Prerequisites
SKL-04-01
Downstream Skills
SKL-06-03
File Path
skills/04-executing/SKL-04-02-manage-project-knowledge.md
SKL-04-03 — Acquire Resources
Field
Value
Skill ID
SKL-04-03
Skill Name
Acquire Resources
Pack
04 — Executing
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A26 — Resource Capacity and Acquisition Record
PMBOK8 Process Anchor
Guide §2.6.2.3 Acquire Resources · Figure 2-43
Performance Domains
Resources · Governance
Focus Area
Executing
Upstream Prerequisites
SKL-03-17
Downstream Skills
SKL-04-04 · SKL-05-08
File Path
skills/04-executing/SKL-04-03-acquire-resources.md
Field
Value
Skill ID
SKL-04-04
Skill Name
Develop Team
Pack
04 — Executing
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A26 — Team Development section
PMBOK8 Process Anchor
Guide §2.6.2.4 Develop Team · Figure 2-44
Performance Domains
Resources · Team
Focus Area
Executing
Upstream Prerequisites
SKL-04-03
Downstream Skills
SKL-04-05
File Path
skills/04-executing/SKL-04-04-develop-team.md
Field
Value
Skill ID
SKL-04-05
Skill Name
Manage Team
Pack
04 — Executing
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A26 — Performance / Conflict Log section
PMBOK8 Process Anchor
Guide §2.6.2.5 Lead the Team · Figure 2-44
Performance Domains
Resources · Team
Focus Area
Executing
Upstream Prerequisites
SKL-04-04
Downstream Skills
SKL-05-08
File Path
skills/04-executing/SKL-04-05-manage-team.md
SKL-04-06 — Manage Stakeholder Engagement
Field
Value
Skill ID
SKL-04-06
Skill Name
Manage Stakeholder Engagement
Pack
04 — Executing
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A07 — SEAM (Execution updates)
PMBOK8 Process Anchor
Guide §2.5.2.4 Manage Stakeholder Engagement · Figure 2-36
Performance Domains
Stakeholders · Governance
Focus Area
Executing
Upstream Prerequisites
SKL-03-07
Downstream Skills
SKL-05-07
File Path
skills/04-executing/SKL-04-06-manage-stakeholder-engagement.md
SKL-04-07 — Manage Communications
Field
Value
Skill ID
SKL-04-07
Skill Name
Manage Communications
Pack
04 — Executing
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A28 — Delivery Log section
PMBOK8 Process Anchor
Guide §2.5.2.5 Manage Communications · Figure 2-37
Performance Domains
Stakeholders · Delivery
Focus Area
Executing
Upstream Prerequisites
SKL-03-08
Downstream Skills
SKL-05-09
File Path
skills/04-executing/SKL-04-07-manage-communications.md
SKL-04-08 — Implement Risk Responses
Field
Value
Skill ID
SKL-04-08
Skill Name
Implement Risk Responses
Pack
04 — Executing
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A19 — Response Log section
PMBOK8 Process Anchor
Guide §2.7.2.5 Implement Risk Responses · Figure 2-52
Performance Domains
Risk · Delivery
Focus Area
Executing
Upstream Prerequisites
SKL-03-12
Downstream Skills
SKL-05-06
File Path
skills/04-executing/SKL-04-08-implement-risk-responses.md
SKL-04-09 — Conduct Procurements
Field
Value
Skill ID
SKL-04-09
Skill Name
Conduct Procurements
Pack
04 — Executing
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A31 — Contract and Procurement Log
PMBOK8 Process Anchor
Guide §2.8.2.2 Conduct Procurements · Figure 2-55
Performance Domains
Governance · Delivery
Focus Area
Executing
Upstream Prerequisites
SKL-03-01
Downstream Skills
SKL-05-01
File Path
skills/04-executing/SKL-04-09-conduct-procurements.md
Pack 05 — Monitoring & Controlling
Pack Purpose: Skills that execute during the Monitoring and Controlling focus area — tracking performance against baselines, controlling scope/schedule/cost/risk/resources/communications/stakeholders, and managing change.
Pack Prerequisites: Pack 04 skills active; A14 baselined; baselines set for A08, A15, A16, A19.
Pack Completion Criteria: All baselines remain valid or have been formally re-baselined through change control; performance reports current.
SKL-05-01 — Monitor and Control Project Work
Field
Value
Skill ID
SKL-05-01
Skill Name
Monitor and Control Project Work
Pack
05 — Monitoring & Controlling
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A17 — Performance Report
Artifacts Updated
A14 · A18 · A19
PMBOK8 Process Anchor
Guide §2.1.6.5 Monitor and Control Project Work · Figure 2-7
Performance Domains
Measurement · Governance
Focus Area
Monitoring and Controlling
Upstream Prerequisites
SKL-04-01
Downstream Skills
SKL-05-02 · SKL-06-01
File Path
skills/05-monitoring-controlling/SKL-05-01-monitor-and-control-project-work.md
SKL-05-02 — Perform Integrated Change Control
Field
Value
Skill ID
SKL-05-02
Skill Name
Perform Integrated Change Control
Pack
05 — Monitoring & Controlling
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A12 — Change Log
Artifacts Updated
A14 · A08 · A15 · A16 · A19
PMBOK8 Process Anchor
Guide §2.1.6.6 Assess and Implement Changes · Figure 2-8
Performance Domains
Governance · Measurement
Focus Area
Monitoring and Controlling
Upstream Prerequisites
SKL-05-01
Downstream Skills
All baseline-holding skills
File Path
skills/05-monitoring-controlling/SKL-05-02-perform-integrated-change-control.md
SKL-05-03 — Control Scope
Field
Value
Skill ID
SKL-05-03
Skill Name
Control Scope
Pack
05 — Monitoring & Controlling
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A08 — Scope Control Log
PMBOK8 Process Anchor
Guide §2.2.2.5 Control Scope · Figure 2-18
Performance Domains
Scope · Measurement
Focus Area
Monitoring and Controlling
Upstream Prerequisites
SKL-03-05 · SKL-05-02
Downstream Skills
SKL-05-02 (triggers change requests)
File Path
skills/05-monitoring-controlling/SKL-05-03-control-scope.md
SKL-05-04 — Control Schedule
Field
Value
Skill ID
SKL-05-04
Skill Name
Control Schedule
Pack
05 — Monitoring & Controlling
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A15 — EVM/SPI section
PMBOK8 Process Anchor
Guide §2.3.2.5 Control Schedule · Figure 2-24
Performance Domains
Schedule · Measurement
Focus Area
Monitoring and Controlling
Upstream Prerequisites
SKL-03-06 · SKL-05-02
Downstream Skills
SKL-05-01 · SKL-05-02
File Path
skills/05-monitoring-controlling/SKL-05-04-control-schedule.md
SKL-05-05 — Control Costs
Field
Value
Skill ID
SKL-05-05
Skill Name
Control Costs
Pack
05 — Monitoring & Controlling
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A16 — EVM / CPI / EAC section
PMBOK8 Process Anchor
Guide §2.4.2.4 Control Finances · Figure 2-30
Performance Domains
Finance · Measurement
Focus Area
Monitoring and Controlling
Upstream Prerequisites
SKL-03-15 · SKL-05-02
Downstream Skills
SKL-05-01 · SKL-06-02
File Path
skills/05-monitoring-controlling/SKL-05-05-control-costs.md
SKL-05-06 — Monitor Risks
Field
Value
Skill ID
SKL-05-06
Skill Name
Monitor Risks
Pack
05 — Monitoring & Controlling
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A19 — Risk Monitoring Log section
PMBOK8 Process Anchor
Guide §2.7.2.6 Monitor Risks · Figure 2-53
Performance Domains
Risk · Measurement
Focus Area
Monitoring and Controlling
Upstream Prerequisites
SKL-04-08
Downstream Skills
SKL-05-02 · SKL-06-01
File Path
skills/05-monitoring-controlling/SKL-05-06-monitor-risks.md
SKL-05-07 — Monitor Stakeholder Engagement
Field
Value
Skill ID
SKL-05-07
Skill Name
Monitor Stakeholder Engagement
Pack
05 — Monitoring & Controlling
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A07 — SEAM Monitoring section
PMBOK8 Process Anchor
Guide §2.5.2.6 Monitor Stakeholder Engagement · Figure 2-38
Performance Domains
Stakeholders · Measurement
Focus Area
Monitoring and Controlling
Upstream Prerequisites
SKL-04-06
Downstream Skills
SKL-04-06 (re-engagement trigger)
File Path
skills/05-monitoring-controlling/SKL-05-07-monitor-stakeholder-engagement.md
SKL-05-08 — Control Resources
Field
Value
Skill ID
SKL-05-08
Skill Name
Control Resources
Pack
05 — Monitoring & Controlling
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A26 — Resource Control Log
PMBOK8 Process Anchor
Guide §2.6.2.6 Control Resources · Figure 2-45
Performance Domains
Resources · Measurement
Focus Area
Monitoring and Controlling
Upstream Prerequisites
SKL-04-03 · SKL-04-05
Downstream Skills
SKL-05-02 · SKL-06-01
File Path
skills/05-monitoring-controlling/SKL-05-08-control-resources.md
SKL-05-09 — Monitor Communications
Field
Value
Skill ID
SKL-05-09
Skill Name
Monitor Communications
Pack
05 — Monitoring & Controlling
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A28 — Communications Monitoring section
PMBOK8 Process Anchor
Guide §2.5.2.7 Monitor Communications · Figure 2-39
Performance Domains
Stakeholders · Measurement
Focus Area
Monitoring and Controlling
Upstream Prerequisites
SKL-04-07
Downstream Skills
SKL-04-07 (re-plan trigger) · SKL-05-07
File Path
skills/05-monitoring-controlling/SKL-05-09-monitor-communications.md
SKL-05-13 — Perform Earned Value Analysis
Field
Value
Skill ID
SKL-05-13
Skill Name
Perform Earned Value Analysis
Pack
05 — Monitoring & Controlling
Status
Active · Tested
Source Type
PMI-derived
Primary Artifact (Output)
A17 — Work Performance Information (EVM section)
Artifacts Updated
A16 (Financial Record) · A12 (Change Log)
PMBOK8 Process Anchor
Guide §2.4.2.4 Monitor and Control Finances · Practice Standard for EVM
Performance Domains
Finance · Governance
Focus Area
Monitoring and Controlling
Upstream Prerequisites
SKL-05-05
Downstream Skills
SKL-05-02
File Path
skills/05-monitoring-controlling/SKL-05-13-perform-earned-value-analysis.md
Pack Purpose: Skills that execute during the Closing focus area — formally closing the project or phase, conducting a final performance review, and capturing and archiving lessons learned and OPA updates.
Pack Prerequisites: All deliverables accepted or disposition documented. Final performance data available.
Pack Completion Criteria: A27 (Closure Record) signed. A21 (Lessons Learned) archived. OPA updated.
SKL-06-01 — Close Project or Phase
Field
Value
Skill ID
SKL-06-01
Skill Name
Close Project or Phase
Pack
06 — Closing
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A27 — Project Closure Record
Artifacts Updated
A14 · A05 · A21
PMBOK8 Process Anchor
Guide §2.1.6.7 Close Project or Phase · Figure 2-9
Performance Domains
Governance · Delivery
Focus Area
Closing
Upstream Prerequisites
SKL-05-01 · SKL-05-06 · All deliverables accepted
Downstream Skills
SKL-06-02 · SKL-06-03
File Path
skills/06-closing/SKL-06-01-close-project-or-phase.md
SKL-06-02 — Final Performance Review
Field
Value
Skill ID
SKL-06-02
Skill Name
Final Performance Review
Pack
06 — Closing
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A17 — Final Performance Report
Artifacts Updated
A27 — Closure Record (performance summary section)
PMBOK8 Process Anchor
Guide §2.4.2 · §2.3.2 · §2.7.2 (closing performance synthesis)
Performance Domains
Measurement · Governance
Focus Area
Closing
Upstream Prerequisites
SKL-06-01
Downstream Skills
SKL-06-03
File Path
skills/06-closing/SKL-06-02-final-performance-review.md
SKL-06-03 — Capture and Archive Lessons Learned
Field
Value
Skill ID
SKL-06-03
Skill Name
Capture and Archive Lessons Learned
Pack
06 — Closing
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A21 — Lessons Learned Register (Final version)
Artifacts Updated
A05 — OPA
PMBOK8 Process Anchor
Guide §2.1.6.4 Manage Project Knowledge (closing activation)
Performance Domains
Governance · Team
Focus Area
Closing
Upstream Prerequisites
SKL-06-01 · SKL-06-02 · SKL-07-03 (retrospective inputs, if applicable)
Downstream Skills
None — terminal skill
File Path
skills/06-closing/SKL-06-03-capture-and-archive-lessons-learned.md
Pack 07 — Adaptive & Hybrid
Pack Purpose: Skills that govern lifecycle approach selection, adaptive delivery mechanics (backlog management, iteration execution), continuous improvement (retrospectives), and hybrid project planning and delivery.
Pack Prerequisites: SKL-02-01 (Charter) must exist. Pack 07 skills activate based on lifecycle approach selected in SKL-07-01. Pack 07 skills operate in parallel with Pack 04, 05, and 06 for adaptive/hybrid projects.
Pack Completion Criteria: Lifecycle approach documented in A06 §2. Backlog maintained through execution. Retrospectives held each cycle. Hybrid structure documented if applicable.
SKL-07-01 — Select and Tailor Lifecycle Approach
Field
Value
Skill ID
SKL-07-01
Skill Name
Select and Tailor Lifecycle Approach
Pack
07 — Adaptive & Hybrid
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A06 §2 — Development Approach section
Artifacts Updated
Tailoring Decision Log
PMBOK8 Process Anchor
PMBOK8 Standard §4.2–4.3 · Guide §2.3 (Development Approach and Life Cycle)
Performance Domains
Development Approach and Life Cycle · Governance · Planning
Focus Area
Initiating · Planning
Upstream Prerequisites
SKL-02-01
Downstream Skills
SKL-07-02 · SKL-07-04 · SKL-03-01 (A06 input)
File Path
skills/07-adaptive-hybrid/SKL-07-01-select-and-tailor-lifecycle-approach.md
Notes
Covers PMBOK8 4-step tailoring framework; suitability filters across 3 dimensions; DA Hybrid Levels 1–3; 4 hybrid patterns (P1–P4). Re-run at each phase gate or major change.
SKL-07-02 — Manage Backlog and Iterations
Field
Value
Skill ID
SKL-07-02
Skill Name
Manage Backlog and Iterations
Pack
07 — Adaptive & Hybrid
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A08 — Backlog section
Artifacts Updated
A15 (velocity / release forecast) · A07 (sprint review feedback)
PMBOK8 Process Anchor
APG §5 · PMBOK8 Guide §2.3
Performance Domains
Development Approach and Life Cycle · Planning · Delivery · Measurement
Focus Area
Planning · Executing
Upstream Prerequisites
SKL-07-01
Downstream Skills
SKL-07-03 · SKL-04-06 · SKL-05-03
File Path
skills/07-adaptive-hybrid/SKL-07-02-manage-backlog-and-iterations.md
Notes
Covers iteration-based (Scrum-like) and flow-based (Kanban) patterns; DoR/DoD gates; velocity forecasting; sprint cadence table.
SKL-07-03 — Facilitate Retrospectives and Continuous Improvement
Field
Value
Skill ID
SKL-07-03
Skill Name
Facilitate Retrospectives and Continuous Improvement
Pack
07 — Adaptive & Hybrid
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A21 — Retrospective section
Artifacts Updated
Tailoring Changelog · A06
PMBOK8 Process Anchor
PMBOK8 Standard Principle 12 · APG §5 · APG §3.3 Table 3-2
Performance Domains
Team · Measurement · Development Approach and Life Cycle
Focus Area
Executing
Upstream Prerequisites
SKL-07-02
Downstream Skills
SKL-07-01 (re-tailoring trigger) · SKL-06-03
File Path
skills/07-adaptive-hybrid/SKL-07-03-facilitate-retrospectives-and-continuous-improvement.md
Notes
Covers Start/Stop/Continue, 4Ls, Mad/Sad/Glad formats; Prime Directive; improvement backlog; A21 feed.
SKL-07-04 — Plan and Deliver Hybrid Projects
Field
Value
Skill ID
SKL-07-04
Skill Name
Plan and Deliver Hybrid Projects
Pack
07 — Adaptive & Hybrid
Status
Draft · Untested
Source Type
PMI-derived
Primary Artifact (Output)
A06 §2 — Hybrid Structure extension
Artifacts Updated
A15 (master schedule) · A19 (cross-stream risks) · A17 (hybrid dashboard)
PMBOK8 Process Anchor
PMBOK8 Standard §4.2.3 · APG §3.1.6–3.1.11 · DA Hybrid Levels 1–3
Performance Domains
Development Approach and Life Cycle · Planning · Delivery · Governance
Focus Area
Planning · Executing · Monitoring and Controlling
Upstream Prerequisites
SKL-07-01
Downstream Skills
SKL-07-02 · SKL-05-02 · SKL-05-01
File Path
skills/07-adaptive-hybrid/SKL-07-04-plan-and-deliver-hybrid-projects.md
Notes
Covers 4 hybrid patterns (P1–P4); stream mapping; integration point management; dual governance model; hybrid anti-patterns; combined EVM + velocity reporting.
Pack Purpose: Skills that execute at the PMO / Organizational level — running steering committee/governance board sessions, establishing status reporting templates/KPIs, performing PMO capability health audits, enforcing escalation protocols, and compiling portfolio-level status summaries.
Pack Prerequisites: Governance structure defined in A35; core reporting standards defined in A05.
Pack Completion Criteria: PMO service catalog established, portfolio dashboard active, compliance registry populated, escalation protocols active.
SKL-08-01 — Run Governance Board Packet
Field
Value
Skill ID
SKL-08-01
Skill Name
Run Governance Board Packet
Pack
08 — PMO Governance
Status
Active · Tested
Source Type
PMI-derived
Primary Artifact (Output)
A35 - Governance and Decision Authority Record (Board section)
Artifacts Updated
A17 — Work Performance Information
PMBOK8 Process Anchor
Guide §2.1 Governance Domain · PMO-Guide — §Building/Running PMO
Performance Domains
Governance
Focus Area
Executing
Upstream Prerequisites
SKL-01-01
Downstream Skills
SKL-08-05
File Path
skills/08-pmo-governance/SKL-08-01-run-governance-board-packet.md
SKL-08-02 — Standardize Status Reporting
Field
Value
Skill ID
SKL-08-02
Skill Name
Standardize Status Reporting
Pack
08 — PMO Governance
Status
Active · Tested
Source Type
PMI-derived
Primary Artifact (Output)
A05 — Context Register (Status Reporting Standards section)
Artifacts Updated
A17 — Work Performance Information (reporting template)
PMBOK8 Process Anchor
Guide §2.1 Governance Domain · PMO-Guide — §Methodology & Standards
Performance Domains
Governance
Focus Area
Executing
Upstream Prerequisites
SKL-01-01
Downstream Skills
SKL-08-05
File Path
skills/08-pmo-governance/SKL-08-02-standardize-status-reporting.md
SKL-08-03 — Perform PMO Health Check
Field
Value
Skill ID
SKL-08-03
Skill Name
Perform PMO Health Check
Pack
08 — PMO Governance
Status
Active · Tested
Source Type
PMI-derived
Primary Artifact (Output)
A05 — Context Register (PMO Maturity section)
Artifacts Updated
A21 — Lessons Learned Register
PMBOK8 Process Anchor
Guide §2.1 Governance Domain · PMO-Guide — §PMO Value & Maturity Assessment
Performance Domains
Governance
Focus Area
Closing
Upstream Prerequisites
SKL-08-02
Downstream Skills
SKL-08-05
File Path
skills/08-pmo-governance/SKL-08-03-perform-pmo-health-check.md
SKL-08-04 — Manage Escalation Protocols
Field
Value
Skill ID
SKL-08-04
Skill Name
Manage Escalation Protocols
Pack
08 — PMO Governance
Status
Active · Tested
Source Type
PMI-derived
Primary Artifact (Output)
A35 — Governance and Decision Authority Record (Escalation section)
Artifacts Updated
A18 — Issue, Impediment, and Action Log
PMBOK8 Process Anchor
Guide §2.1 Governance Domain · AUTHORITY-ROUTING.md
Performance Domains
Governance
Focus Area
Executing
Upstream Prerequisites
SKL-01-01
Downstream Skills
SKL-08-01
File Path
skills/08-pmo-governance/SKL-08-04-manage-escalation-protocols.md
SKL-08-05 — Manage PMO Portfolio Reporting
Field
Value
Skill ID
SKL-08-05
Skill Name
Manage PMO Portfolio Reporting
Pack
08 — PMO Governance
Status
Active · Tested
Source Type
PMI-derived
Primary Artifact (Output)
A05 — Context Register (Portfolio Report section)
Artifacts Updated
A17 — Work Performance Information (Portfolio view)
PMBOK8 Process Anchor
Guide §2.1 Governance Domain · PMO-Guide — §Portfolio Reporting
Performance Domains
Governance
Focus Area
Monitoring and Controlling
Upstream Prerequisites
SKL-08-02
Downstream Skills
SKL-08-03
File Path
skills/08-pmo-governance/SKL-08-05-manage-pmo-portfolio-reporting.md
PACK 01 — ORGANIZATIONAL SETUP ✅
══════════════════════════════════════════════════════
[A01 Authorization trigger]
└──▶ SKL-01-01 (Establish PM Governance Framework)
└──▶ SKL-01-02 (Define Artifact and Document Control Standards)
└──▶ SKL-01-03 (Configure Repository and Tool Environment)
└──▶ [Pack 02 Initiating begins]
PACK 02 — INITIATING ✅
══════════════════════════════════════════════════════
SKL-02-01 (Initiate Project or Phase)
└──▶ SKL-02-02 (Identify Stakeholders)
└──▶ [Pack 03 Planning begins]
└──▶ SKL-07-01 (Lifecycle selection — may run in parallel)
PACK 03 — PLANNING (Stakeholder/Comms) ✅
══════════════════════════════════════════════════════
SKL-02-02 ──▶ SKL-03-07 (Plan Stakeholder Engagement)
└──▶ SKL-03-08 (Plan Communications Management)
PACK 03 — PLANNING (Scope/Schedule/Finance/Resource) ✅
══════════════════════════════════════════════════════
SKL-02-02 ──▶ SKL-03-02 ──▶ SKL-03-03 ──▶ SKL-03-04 ──▶ SKL-03-05
├──▶ SKL-03-06
├──▶ SKL-03-13 ──▶ SKL-03-14 ──▶ SKL-03-15
└──▶ SKL-03-16 ──▶ SKL-03-17
PACK 03 — PLANNING (Risk) ✅
══════════════════════════════════════════════════════
SKL-03-07 + SKL-03-02 ──▶ SKL-03-09 ──▶ SKL-03-10 ──▶ SKL-03-11 ──▶ SKL-03-12
PACK 03 — PLANNING (Integration) ✅
══════════════════════════════════════════════════════
All Pack 03 skills ──▶ SKL-03-01 (A14 Integrated PM Plan)
└──▶ [Pack 04 Executing begins]
PACK 04 — EXECUTING ✅
══════════════════════════════════════════════════════
SKL-03-01 ──▶ SKL-04-01 (Direct & Manage Work)
SKL-03-17 ──▶ SKL-04-03 ──▶ SKL-04-04 ──▶ SKL-04-05
SKL-03-07 ──▶ SKL-04-06
SKL-03-08 ──▶ SKL-04-07
SKL-03-12 ──▶ SKL-04-08
SKL-03-01 ──▶ SKL-04-09
SKL-04-01 ──▶ SKL-04-02
PACK 05 — MONITORING & CONTROLLING ✅
══════════════════════════════════════════════════════
SKL-04-01 ──▶ SKL-05-01 ──▶ SKL-05-02
SKL-03-05 + SKL-05-02 ──▶ SKL-05-03
SKL-03-06 + SKL-05-02 ──▶ SKL-05-04
SKL-03-15 + SKL-05-02 ──▶ SKL-05-05
SKL-04-08 ──▶ SKL-05-06
SKL-04-06 ──▶ SKL-05-07
SKL-04-03 + SKL-04-05 ──▶ SKL-05-08
SKL-04-07 ──▶ SKL-05-09
PACK 06 — CLOSING ✅
══════════════════════════════════════════════════════
SKL-05-01 + deliverables accepted ──▶ SKL-06-01
SKL-06-01 ──▶ SKL-06-02
SKL-06-02 + SKL-07-03 ──▶ SKL-06-03 [terminal]
PACK 07 — ADAPTIVE & HYBRID ✅
══════════════════════════════════════════════════════
SKL-02-01 ──▶ SKL-07-01 (Select Lifecycle Approach)
├──▶ SKL-07-02 (Backlog & Iterations) ──▶ SKL-07-03 (Retrospectives)
└──▶ SKL-07-04 (Hybrid Planning & Delivery)
SKL-07-03 ──▶ SKL-07-01 (re-tailoring feedback loop)
SKL-07-03 ──▶ SKL-06-03
Pack
Skill ID
Skill Name
Status
01
SKL-01-01
Establish PM Governance Framework
✅ Active · Tested
01
SKL-01-02
Define Artifact and Document Control Standards
✅ Active · Tested
01
SKL-01-03
Configure Project Repository and Tool Environment
✅ Active · Tested
02
SKL-02-01
Initiate Project or Phase
✅ Active · Tested
02
SKL-02-02
Identify Stakeholders
✅ Active · Tested
03
SKL-03-01
Integrate and Align Project Plans
✅ Active · Tested
03
SKL-03-02
Plan Scope Management
✅ Active · Tested
03
SKL-03-03
Elicit and Analyze Requirements
✅ Active · Tested
03
SKL-03-04
Define Scope
✅ Active · Tested
03
SKL-03-05
Develop Scope Structure
✅ Active · Tested
03
SKL-03-06
Plan Schedule Management
✅ Active · Tested
03
SKL-03-06b
Develop and Baseline Schedule (Detailed)
✅ Active · Tested
03
SKL-03-07
Plan Stakeholder Engagement
✅ Active · Tested
03
SKL-03-08
Plan Communications Management
✅ Active · Tested
03
SKL-03-09
Plan Risk Management
✅ Active · Tested
03
SKL-03-10
Identify Risks
✅ Active · Tested
03
SKL-03-11
Perform Risk Analysis
✅ Active · Tested
03
SKL-03-12
Plan Risk Responses
✅ Active · Tested
03
SKL-03-13
Plan Financial Management
✅ Active · Tested
03
SKL-03-14
Estimate Costs
✅ Active · Tested
03
SKL-03-15
Develop Budget
✅ Active · Tested
03
SKL-03-16
Plan Resource Management
✅ Active · Tested
03
SKL-03-17
Estimate Resources
✅ Active · Tested
03
SKL-03-18
Integrate Sustainability Into Project Planning
✅ Active · Tested
03
SKL-03-19
Plan Quality Management
✅ Active · Tested
03
SKL-03-20
Plan Procurement Management
✅ Active · Tested
03
SKL-03-21
Develop Requirements Traceability Matrix
✅ Active · Tested
04
SKL-04-01
Direct and Manage Project Work
✅ Active · Tested
04
SKL-04-02
Manage Project Knowledge
✅ Active · Tested
04
SKL-04-03
Acquire Resources
✅ Active · Tested
04
SKL-04-04
Develop Team
✅ Active · Tested
04
SKL-04-05
Manage Team
✅ Active · Tested
04
SKL-04-06
Manage Stakeholder Engagement
✅ Active · Tested
04
SKL-04-07
Manage Communications
✅ Active · Tested
04
SKL-04-08
Implement Risk Responses
✅ Active · Tested
04
SKL-04-09
Conduct Procurements
✅ Active · Tested
05
SKL-05-01
Monitor and Control Project Work
✅ Active · Tested
05
SKL-05-02
Perform Integrated Change Control
✅ Active · Tested
05
SKL-05-03
Control Scope
✅ Active · Tested
05
SKL-05-04
Control Schedule
✅ Active · Tested
05
SKL-05-05
Control Costs
✅ Active · Tested
05
SKL-05-06
Monitor Risks
✅ Active · Tested
05
SKL-05-07
Monitor Stakeholder Engagement
✅ Active · Tested
05
SKL-05-08
Control Resources
✅ Active · Tested
05
SKL-05-09
Monitor Communications
✅ Active · Tested
05
SKL-05-13
Perform Earned Value Analysis
✅ Active · Tested
06
SKL-06-01
Close Project or Phase
✅ Active · Tested
06
SKL-06-02
Final Performance Review
✅ Active · Tested
06
SKL-06-03
Capture and Archive Lessons Learned
✅ Active · Tested
07
SKL-07-01
Select and Tailor Lifecycle Approach
✅ Active · Tested
07
SKL-07-02
Manage Backlog and Iterations
✅ Active · Tested
07
SKL-07-03
Facilitate Retrospectives and Continuous Improvement
✅ Active · Tested
07
SKL-07-04
Plan and Deliver Hybrid Projects
✅ Active · Tested
08
SKL-08-01
Run Governance Board Packet
✅ Active · Tested
08
SKL-08-02
Standardize Status Reporting
✅ Active · Tested
08
SKL-08-03
Perform PMO Health Check
✅ Active · Tested
08
SKL-08-04
Manage Escalation Protocols
✅ Active · Tested
08
SKL-08-05
Manage PMO Portfolio Reporting
✅ Active · Tested
Built: 58 skills ✅
Planned: 0
Total indexed: 58 skills — All packs complete (Pack 01–08)
Artifact
Created By
Extended / Updated By
A03 — Repository and Tool Configuration Record
SKL-01-03
SKL-01-03 (re-run on major environment change)
A04 — Project Charter
SKL-02-01
—
A05 — Context Register / OPA
SKL-01-01 (Governance) · SKL-01-02 (Doc Control) · SKL-01-03 (Tool Environment)
SKL-02-01 · SKL-02-02 · SKL-04-02 · SKL-06-03
A06 — Project Management Plan (lifecycle/tailoring sections)
SKL-07-01
SKL-07-04 · SKL-07-03 (tailoring changelog) · SKL-01-01 (governance ref) · SKL-01-02 (doc control ref) · SKL-01-03 (tool env ref)
A07 — Stakeholder Register and Engagement Strategy
SKL-02-02
SKL-03-07 · SKL-03-08 · SKL-04-06 · SKL-05-07
A08 — Scope and Requirements / Backlog
SKL-03-02
SKL-03-03 · SKL-03-04 · SKL-03-05 · SKL-05-03 · SKL-07-02
A12 — Change Log
SKL-05-02
SKL-05-02 (ongoing)
A14 — Integrated PM Plan
SKL-03-01
All planning skills (subsidiary references) · SKL-05-02
A15 — Schedule Model
SKL-03-06
SKL-03-08 · SKL-04-01 · SKL-05-04 · SKL-07-02 · SKL-07-04
A16 — Financial Management / Cost Baseline
SKL-03-13
SKL-03-14 · SKL-03-15 · SKL-05-05
A17 — Performance Report
SKL-05-01
SKL-06-02 · SKL-07-04 (hybrid dashboard)
A18 — Issue Log
SKL-04-01
SKL-04-01 (ongoing)
A19 — Risk Management Record
SKL-03-09
SKL-02-02 · SKL-03-07 · SKL-03-10–12 · SKL-04-08 · SKL-05-06 · SKL-07-04
A21 — Lessons Learned Register
SKL-04-02
SKL-07-03 · SKL-06-03
A26 — Resource Capacity and Acquisition Record
SKL-03-16
SKL-03-17 · SKL-04-03 · SKL-04-04 · SKL-04-05 · SKL-05-08
A27 — Project Closure Record
SKL-06-01
SKL-06-02
A28 — Communications and Reporting Record
SKL-03-08
SKL-04-07 · SKL-05-09
A31 — Contract and Procurement Log
SKL-04-09
SKL-04-09 (ongoing)
A-NEW-SUST — Sustainability Register
SKL-03-18
SKL-05-01
Naming and ID Conventions
Convention
Rule
Skill ID format
SKL-PP-NN — PP = 2-digit pack number; NN = 2-digit sequence within pack
File naming
SKL-PP-NN-kebab-case-skill-name.md
Pack folder
skills/PP-packname/ (e.g., skills/01-organizational-setup/)
Status values
Draft · Untested → Draft · In Review → Reviewed → Approved · Production
Source type
PMI-derived / synthesis / organization-defined
PMBOK8 anchor
Always cite Guide section number + Figure number
Registry Maintenance Rules
Add a shell entry for every planned skill before it is built — the registry must always show the full planned build scope.
Update status immediately when a skill file is created, reviewed, or approved.
Update the Artifact Cross-Reference table whenever a skill adds a new artifact write target.
Update the Dependency Chain Diagram when a new skill's position in the chain is non-obvious.
Never remove a skill entry — deprecated skills are marked Deprecated · Replaced by SKL-XX-XX.
This registry is not a skill file — it does not contain instructions, tests, or step-by-step guidance.
Authority: PMBOK8 · Artifacts-V-1.1 · Repository Operating Rules §3.2 Consolidation Rule
Owner: Repository Maintainer
Version: 1.3.1 — Updated 2026-06-03 — Wave 1 audit fixes applied (F-23); total built = 48/48; all packs complete