SKILL-REGISTRY.md — Project Management Skills Repository

Version: 1.3.1
Status: Active · Maintained
Authority: PMBOK8 · Artifacts-V-1.1 · Repository Operating Rules
Last Updated: 2026-06-03
File Path: SKILL-REGISTRY.md


Purpose

This registry is the single authoritative index of all skills in the PM Skills Repository. It catalogs every skill by ID, pack, name, status, primary artifact, PMBOK8 anchor, and dependency chain. It does not duplicate skill content — it indexes it.

Use this registry to:

  • Determine which skills exist and their current build status
  • Identify upstream prerequisites before executing a skill
  • Trace which artifact each skill produces or updates
  • Plan the remaining skill build order
  • Confirm pack completeness before declaring a pack ready for use

Registry Schema

Each skill entry contains the following fields:

Field Description
Skill ID Unique identifier — format: SKL-PP-NN where PP = pack number, NN = sequence within pack
Skill Name Full name matching the skill file heading
Pack Lifecycle pack number and name
Status Draft · Untested / Draft · In Review / Reviewed / Approved · Production
Source Type PMI-derived / organization-defined / synthesis
Primary Artifact (Output) The artifact this skill produces or whose primary section it populates
Artifacts Updated Additional artifacts modified as outputs
PMBOK8 Process Anchor The PMBOK8 Guide process or section this skill operationalizes
Performance Domains PMBOK8 performance domains this skill operates within
Focus Area PMBOK8 focus area(s): Initiating / Planning / Executing / Monitoring and Controlling / Closing
Upstream Prerequisites Skills that must complete before this skill can execute
Downstream Skills Skills that consume this skill's outputs
File Path Relative path to the skill markdown file
Notes Key design decisions, constraints, or open items

Pack Index

Pack Name Skills Built Skills Planned Total Status
01 Organizational Setup 3 0 3 ✅ Complete
02 Initiating 2 0 2 ✅ Complete
03 Planning 22 0 22 ✅ Complete
04 Executing 9 0 9 ✅ Complete
05 Monitoring & Controlling 10 0 10 ✅ Complete
06 Closing 3 0 3 ✅ Complete
07 Adaptive & Hybrid 4 0 4 ✅ Complete
08 PMO Governance 5 0 5 ✅ Complete
TOTAL 58 built 0 planned 58 All built

Pack 01 — Organizational Setup

Pack Purpose: Skills that establish the organizational foundation required before any project can be initiated — governance framework, document and artifact control standards, and repository/tool environment configuration. These skills run once per organizational setup or when a significant structural change occurs. All downstream packs depend on these foundations being in place.

Pack Prerequisites: A business case or authorization trigger (A01) must exist before SKL-01-01 runs. No prior skill prerequisites.

Pack Completion Criteria: A05 Governance section baselined · A05 Document Control Standards baselined · A03 Repository and Tool Configuration Record baselined · Repository folder structure verified and accessible.


SKL-01-01 — Establish PM Governance Framework

Field Value
Skill ID SKL-01-01
Skill Name Establish PM Governance Framework
Pack 01 — Organizational Setup
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A05 — Context Register (Governance section)
Artifacts Updated A06 — Project Management Plan (governance reference) · A04 — Project Charter (authority thresholds reference)
PMBOK8 Process Anchor PMBOK8 Standard §3 Principles · Guide §2.1 Project Integration Management · AUTHORITY-ROUTING.md
Performance Domains Governance · Stakeholders
Focus Area Organizational Setup
Upstream Prerequisites A01 — Business Case or equivalent authorization trigger must exist
Downstream Skills SKL-01-02 · SKL-01-03 · SKL-02-01
File Path skills/01-organizational-setup/SKL-01-01-establish-pm-governance-framework.md
Notes Defines authority thresholds, decision rights, governance RACI, escalation path, meeting cadence, and compliance obligations. Must align with AUTHORITY-ROUTING.md. Re-run at program level or for projects with unique governance requirements. 9 tests.

SKL-01-02 — Define Artifact and Document Control Standards

Field Value
Skill ID SKL-01-02
Skill Name Define Artifact and Document Control Standards
Pack 01 — Organizational Setup
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A05 — Context Register (OPA / Document Control Standards section)
Artifacts Updated A06 — Project Management Plan (document control reference)
PMBOK8 Process Anchor PMBOK8 Standard §3 Principles · Guide §2.1.6.4 Manage Project Knowledge · Artifacts-V-1.1
Performance Domains Governance · Delivery
Focus Area Organizational Setup
Upstream Prerequisites SKL-01-01 — A05 Governance section must be baselined
Downstream Skills SKL-01-03 · SKL-02-01 · All artifact-producing skills (Pack 02 through Pack 07)
File Path skills/01-organizational-setup/SKL-01-02-define-artifact-and-document-control-standards.md
Notes Defines naming conventions (A##-kebab-case.md), semantic versioning (major/minor/patch), six-status lifecycle, artifact ownership, baseline/change control rules per artifact type, and archiving/retention rules. Artifacts-V-1.1 is the authoritative artifact registry. 9 tests.

SKL-01-03 — Configure Project Repository and Tool Environment

Field Value
Skill ID SKL-01-03
Skill Name Configure Project Repository and Tool Environment
Pack 01 — Organizational Setup
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A03 — Repository and Tool Configuration Record
Artifacts Updated A05 — Context Register (EEF / tool environment section) · A06 — Project Management Plan (tool environment reference)
PMBOK8 Process Anchor PMBOK8 Standard §3 Principles · Guide §2.1.6.4 Manage Project Knowledge · Guide §2.6 Resource Management
Performance Domains Governance · Resources · Delivery
Focus Area Organizational Setup
Upstream Prerequisites SKL-01-01 — A05 Governance section must be baselined · SKL-01-02 — A05 Document Control Standards must be baselined
Downstream Skills SKL-02-01 · All Pack 02 through Pack 07 skills
File Path skills/01-organizational-setup/SKL-01-03-configure-project-repository-and-tool-environment.md
Notes Configures canonical folder structure, version control settings (branch naming, commit conventions, branch protection), access controls, tool integrations (CI/CD, MCP server, agent pipelines), and repository readiness checklist. Creates A03 as the single authority for repository and tool configuration. 9 tests.

Pack 02 — Initiating

Pack Purpose: Skills that execute during the Initiating focus area — authorizing the project, establishing governance context, identifying stakeholders, and producing the foundational records that all planning skills depend on.

Pack Prerequisites: A business case or equivalent authorization trigger must exist before any Pack 02 skill runs. Pack 01 (Organizational Setup) must be complete.

Pack Completion Criteria: A04 (Project Charter), A05 (Context Register), and A07 (Stakeholder Register — Identification section) must all be baselined before Pack 03 skills begin.


SKL-02-01 — Initiate Project or Phase

Field Value
Skill ID SKL-02-01
Skill Name Initiate Project or Phase
Pack 02 — Initiating
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A04 — Project Charter
Artifacts Updated A05 — Context Register · A02 — Benefits and Value Measurement Record
PMBOK8 Process Anchor Guide §2.1.6.1 Initiate Project or Phase · Figure 2-3
Performance Domains Governance · Stakeholders
Focus Area Initiating
Upstream Prerequisites A01 (Business Case) must exist · Pack 01 complete
Downstream Skills SKL-02-02 · All Pack 03 skills
File Path skills/02-initiating/SKL-02-01-initiate-project-or-phase.md
Notes Charter is the enabling artifact for all downstream work. Includes predictive and adaptive tailoring paths.

SKL-02-02 — Identify Stakeholders

Field Value
Skill ID SKL-02-02
Skill Name Identify Stakeholders
Pack 02 — Initiating
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A07 — Stakeholder Register and Engagement Strategy (Identification section)
Artifacts Updated A05 — Context Register · A19 — Risk Management Record
PMBOK8 Process Anchor Guide §2.5.2.1 Identify Stakeholders · Figure 2-33
Performance Domains Stakeholders · Governance
Focus Area Initiating
Upstream Prerequisites SKL-02-01
Downstream Skills SKL-03-07
File Path skills/02-initiating/SKL-02-02-identify-stakeholders.md
Notes Power/Interest Grid + Salience Model core technique. Re-run triggers: phase gates, new stakeholders, major scope/authority changes.

Pack 03 — Planning

Pack Purpose: Skills that execute during the Planning focus area — translating authorization and context into actionable project management plans, baselines, and subsidiary plans.

Pack Prerequisites: All Pack 02 skills must complete before Pack 03 begins.

Pack Completion Criteria: A14 (Integrated PM Plan) assembled and baselined before Pack 04 begins.


SKL-03-01 — Integrate and Align Project Plans

Field Value
Skill ID SKL-03-01
Skill Name Integrate and Align Project Plans
Pack 03 — Planning
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A14 — Integrated Project Management Plan
PMBOK8 Process Anchor Guide §2.1.6.2 · Figure 2-4
Performance Domains Governance · All domains
Focus Area Planning
Upstream Prerequisites All applicable Pack 03 planning skills
Downstream Skills All Pack 04 skills
File Path skills/03-planning/SKL-03-01-integrate-align-project-plans.md
Notes Final Pack 03 skill — assembles all subsidiary plans into A14. Build last.

SKL-03-02 — Plan Scope Management

Field Value
Skill ID SKL-03-02
Skill Name Plan Scope Management
Pack 03 — Planning
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A08 — Scope Management Plan section
PMBOK8 Process Anchor Guide §2.2.2.1 · Figure 2-14
Performance Domains Scope · Governance
Focus Area Planning
Upstream Prerequisites SKL-02-01 · SKL-02-02
Downstream Skills SKL-03-03
File Path skills/03-planning/SKL-03-02-plan-scope-management.md

SKL-03-03 — Elicit and Analyze Requirements

Field Value
Skill ID SKL-03-03
Skill Name Elicit and Analyze Requirements
Pack 03 — Planning
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A08 — Requirements section
PMBOK8 Process Anchor Guide §2.2.2.2 · Figure 2-15
Performance Domains Scope · Stakeholders
Focus Area Planning
Upstream Prerequisites SKL-03-02 · SKL-02-02
Downstream Skills SKL-03-04 · SKL-03-08
File Path skills/03-planning/SKL-03-03-elicit-analyze-requirements.md

SKL-03-04 — Define Scope

Field Value
Skill ID SKL-03-04
Skill Name Define Scope
Pack 03 — Planning
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A08 — Project Scope Statement section
PMBOK8 Process Anchor Guide §2.2.2.3 · Figure 2-16
Performance Domains Scope · Governance
Focus Area Planning
Upstream Prerequisites SKL-03-03
Downstream Skills SKL-03-05
File Path skills/03-planning/SKL-03-04-define-scope.md

SKL-03-05 — Develop Scope Structure

Field Value
Skill ID SKL-03-05
Skill Name Develop Scope Structure
Pack 03 — Planning
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A08 — WBS / Scope Structure section
PMBOK8 Process Anchor Guide §2.2.2.4 · Figure 2-17
Performance Domains Scope · Schedule
Focus Area Planning
Upstream Prerequisites SKL-03-04
Downstream Skills SKL-03-06 · SKL-03-13 · SKL-03-16
File Path skills/03-planning/SKL-03-05-develop-scope-structure.md

SKL-03-06 — Plan Schedule Management

Field Value
Skill ID SKL-03-06
Skill Name Plan Schedule Management
Pack 03 — Planning
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A15 — Schedule Management Plan section
PMBOK8 Process Anchor Guide §2.3.2.1 · Figure 2-21
Performance Domains Schedule · Governance
Focus Area Planning
Upstream Prerequisites SKL-03-05 · SKL-02-01
Downstream Skills SKL-03-06b Develop Schedule
File Path skills/03-planning/SKL-03-06-plan-schedule-management.md

SKL-03-07 — Plan Stakeholder Engagement

Field Value
Skill ID SKL-03-07
Skill Name Plan Stakeholder Engagement
Pack 03 — Planning
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A07 — Engagement Strategy section
Artifacts Updated A19 — engagement risks · A14 — subsidiary reference
PMBOK8 Process Anchor Guide §2.5.2.2 · Figure 2-34
Performance Domains Stakeholders · Governance
Focus Area Planning
Upstream Prerequisites SKL-02-02
Downstream Skills SKL-03-08 · SKL-04-06 · SKL-05-07
File Path skills/03-planning/SKL-03-07-plan-stakeholder-engagement.md
Notes SEAM is embedded in A07. Inseparable upstream pair with SKL-03-08.

SKL-03-08 — Plan Communications Management

Field Value
Skill ID SKL-03-08
Skill Name Plan Communications Management
Pack 03 — Planning
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A28 — Communications and Reporting Record
Artifacts Updated A07 · A15 · A14
PMBOK8 Process Anchor Guide §2.5.2.3 · Figure 2-35
Performance Domains Stakeholders · Governance
Focus Area Planning
Upstream Prerequisites SKL-03-07
Downstream Skills SKL-04-07 · SKL-05-09
File Path skills/03-planning/SKL-03-08-plan-communications-management.md
Notes A28 = single merged communications record. A07 ↔ A28 consistency enforced.

SKL-03-09 — Plan Risk Management

Field Value
Skill ID SKL-03-09
Skill Name Plan Risk Management
Pack 03 — Planning
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A19 — Risk Management Plan section
PMBOK8 Process Anchor Guide §2.7.2.1 · Figure 2-48
Performance Domains Risk · Governance
Focus Area Planning
Upstream Prerequisites SKL-02-01 · SKL-02-02 · SKL-03-07
Downstream Skills SKL-03-10
File Path skills/03-planning/SKL-03-09-plan-risk-management.md

SKL-03-10 — Identify Risks

Field Value
Skill ID SKL-03-10
Skill Name Identify Risks
Pack 03 — Planning
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A19 — Risk Register section
PMBOK8 Process Anchor Guide §2.7.2.2 · Figure 2-49
Performance Domains Risk · Scope · Schedule
Focus Area Planning
Upstream Prerequisites SKL-03-09
Downstream Skills SKL-03-11
File Path skills/03-planning/SKL-03-10-identify-risks.md

SKL-03-11 — Perform Risk Analysis

Field Value
Skill ID SKL-03-11
Skill Name Perform Risk Analysis
Pack 03 — Planning
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A19 — Risk Analysis section · A20 (conditional)
PMBOK8 Process Anchor Guide §2.7.2.3 · Figure 2-50
Performance Domains Risk · Finance
Focus Area Planning
Upstream Prerequisites SKL-03-10
Downstream Skills SKL-03-12
File Path skills/03-planning/SKL-03-11-perform-risk-analysis.md

SKL-03-12 — Plan Risk Responses

Field Value
Skill ID SKL-03-12
Skill Name Plan Risk Responses
Pack 03 — Planning
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A19 — Risk Response section
PMBOK8 Process Anchor Guide §2.7.2.4 · Figure 2-51
Performance Domains Risk · Finance · Stakeholders
Focus Area Planning
Upstream Prerequisites SKL-03-11
Downstream Skills SKL-04-08 · SKL-05-06
File Path skills/03-planning/SKL-03-12-plan-risk-responses.md

SKL-03-13 — Plan Financial Management

Field Value
Skill ID SKL-03-13
Skill Name Plan Financial Management
Pack 03 — Planning
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A16 — Financial Management Plan section
PMBOK8 Process Anchor Guide §2.4.2.1 · Figure 2-27
Performance Domains Finance · Governance
Focus Area Planning
Upstream Prerequisites SKL-02-01 · SKL-03-05
Downstream Skills SKL-03-14 · SKL-03-15
File Path skills/03-planning/SKL-03-13-plan-financial-management.md

SKL-03-14 — Estimate Costs

Field Value
Skill ID SKL-03-14
Skill Name Estimate Costs
Pack 03 — Planning
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A16 — Cost Estimates section
PMBOK8 Process Anchor Guide §2.4.2.2 · Figure 2-28
Performance Domains Finance · Risk
Focus Area Planning
Upstream Prerequisites SKL-03-13 · SKL-03-05
Downstream Skills SKL-03-15
File Path skills/03-planning/SKL-03-14-estimate-costs.md

SKL-03-15 — Develop Budget

Field Value
Skill ID SKL-03-15
Skill Name Develop Budget
Pack 03 — Planning
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A16 — Cost Baseline / BAC section
PMBOK8 Process Anchor Guide §2.4.2.3 · Figure 2-29
Performance Domains Finance · Governance
Focus Area Planning
Upstream Prerequisites SKL-03-14 · SKL-03-11
Downstream Skills SKL-05-05
File Path skills/03-planning/SKL-03-15-develop-budget.md

SKL-03-16 — Plan Resource Management

Field Value
Skill ID SKL-03-16
Skill Name Plan Resource Management
Pack 03 — Planning
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A26 — Resource Management Plan section
PMBOK8 Process Anchor Guide §2.6.2.1 · Figure 2-41
Performance Domains Resources · Governance
Focus Area Planning
Upstream Prerequisites SKL-02-01 · SKL-03-05
Downstream Skills SKL-03-17 · SKL-04-03
File Path skills/03-planning/SKL-03-16-plan-resource-management.md

SKL-03-17 — Estimate Resources

Field Value
Skill ID SKL-03-17
Skill Name Estimate Resources
Pack 03 — Planning
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A26 — Resource Estimates section
PMBOK8 Process Anchor Guide §2.6.2.2 · Figure 2-42
Performance Domains Resources · Schedule · Finance
Focus Area Planning
Upstream Prerequisites SKL-03-16
Downstream Skills SKL-04-03
File Path skills/03-planning/SKL-03-17-estimate-resources.md

SKL-03-18 — Integrate Sustainability Into Project Planning

Field Value
Skill ID SKL-03-18
Skill Name Integrate Sustainability Into Project Planning
Pack 03 — Planning
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A-NEW-SUST — Sustainability Register
PMBOK8 Process Anchor Standard §3.6 · Guide §2.5.2
Performance Domains Scope · Resources · Risk
Focus Area Planning
Upstream Prerequisites SKL-02-01 · SKL-02-02 · SKL-03-02
Downstream Skills SKL-03-14 · SKL-04-09 · SKL-05-01
File Path skills/03-planning/SKL-03-18-integrate-sustainability-into-project-planning.md

SKL-03-06b — Develop and Baseline Schedule (Detailed)

Field Value
Skill ID SKL-03-06b
Skill Name Develop and Baseline Schedule (Detailed)
Pack 03 — Planning
Status Active · Tested
Source Type PMI-derived
Primary Artifact (Output) A15 — Schedule Model and Baseline Record
Artifacts Updated A14 (Integrated PM Plan)
PMBOK8 Process Anchor Guide §2.3.2.2 Develop Schedule · Guide §2.3 Schedule Domain
Performance Domains Schedule
Focus Area Planning
Upstream Prerequisites SKL-03-06 · SKL-03-05
Downstream Skills SKL-03-15 · SKL-05-04
File Path skills/03-planning/SKL-03-06b-develop-schedule.md

SKL-03-19 — Plan Quality Management

Field Value
Skill ID SKL-03-19
Skill Name Plan Quality Management
Pack 03 — Planning
Status Active · Tested
Source Type PMI-derived
Primary Artifact (Output) A06 — Project Management Plan (Quality Management section)
Artifacts Updated A14 (Integrated PM Plan)
PMBOK8 Process Anchor Guide §2.2.2.6 · Guide §2.1.6.5 Manage Quality Assurance · Standard §3.5 Embed Quality
Performance Domains Scope · Governance
Focus Area Planning
Upstream Prerequisites SKL-03-03 · SKL-03-04
Downstream Skills SKL-04-01 · SKL-05-09
File Path skills/03-planning/SKL-03-19-plan-quality-management.md

SKL-03-20 — Plan Procurement Management

Field Value
Skill ID SKL-03-20
Skill Name Plan Procurement Management
Pack 03 — Planning
Status Active · Tested
Source Type PMI-derived
Primary Artifact (Output) A06 — Project Management Plan (Procurement Management section)
Artifacts Updated A31 — Procurement and Supplier Management Record
PMBOK8 Process Anchor Guide §2.1.6.3 Plan Sourcing Strategy · Guide §2.1 Governance Domain
Performance Domains Governance
Focus Area Planning
Upstream Prerequisites SKL-03-01 · SKL-03-03
Downstream Skills SKL-04-09 · SKL-05-08
File Path skills/03-planning/SKL-03-20-plan-procurement-management.md

SKL-03-21 — Develop Requirements Traceability Matrix

Field Value
Skill ID SKL-03-21
Skill Name Develop Requirements Traceability Matrix
Pack 03 — Planning
Status Active · Tested
Source Type PMI-derived
Primary Artifact (Output) A08 — Scope and Requirements Decision Record (RTM section)
Artifacts Updated A14 (Integrated PM Plan)
PMBOK8 Process Anchor Guide §2.2.2.2 Elicit and Analyze Requirements · Guide §2.2 Scope Domain
Performance Domains Scope
Focus Area Planning
Upstream Prerequisites SKL-03-03 · SKL-03-04
Downstream Skills SKL-05-03 · SKL-05-09
File Path skills/03-planning/SKL-03-21-develop-requirements-traceability-matrix.md

Pack 04 — Executing

Pack Purpose: Skills that execute during the Executing focus area — directing and managing work, acquiring and developing resources, managing stakeholder and team engagement, managing communications, procurements, knowledge, and implementing risk responses.

Pack Prerequisites: A14 (Integrated PM Plan) must be baselined. All applicable Pack 03 skills must be complete.

Pack Completion Criteria: All deliverables under execution; issue log (A18), risk response log (A19), and communications delivery log (A28) are actively maintained.


SKL-04-01 — Direct and Manage Project Work

Field Value
Skill ID SKL-04-01
Skill Name Direct and Manage Project Work
Pack 04 — Executing
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A18 — Issue Log
Artifacts Updated A14 · A15 · A16 · A19
PMBOK8 Process Anchor Guide §2.1.6.3 Direct and Manage Project Work · Figure 2-5
Performance Domains Delivery · Governance
Focus Area Executing
Upstream Prerequisites SKL-03-01 (A14 baselined)
Downstream Skills SKL-05-01 · SKL-04-02
File Path skills/04-executing/SKL-04-01-direct-and-manage-project-work.md

SKL-04-02 — Manage Project Knowledge

Field Value
Skill ID SKL-04-02
Skill Name Manage Project Knowledge
Pack 04 — Executing
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A21 — Lessons Learned Register
Artifacts Updated A05 — OPA
PMBOK8 Process Anchor Guide §2.1.6.4 Manage Project Knowledge · Figure 2-6
Performance Domains Governance · Team
Focus Area Executing
Upstream Prerequisites SKL-04-01
Downstream Skills SKL-06-03
File Path skills/04-executing/SKL-04-02-manage-project-knowledge.md

SKL-04-03 — Acquire Resources

Field Value
Skill ID SKL-04-03
Skill Name Acquire Resources
Pack 04 — Executing
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A26 — Resource Capacity and Acquisition Record
PMBOK8 Process Anchor Guide §2.6.2.3 Acquire Resources · Figure 2-43
Performance Domains Resources · Governance
Focus Area Executing
Upstream Prerequisites SKL-03-17
Downstream Skills SKL-04-04 · SKL-05-08
File Path skills/04-executing/SKL-04-03-acquire-resources.md

SKL-04-04 — Develop Team

Field Value
Skill ID SKL-04-04
Skill Name Develop Team
Pack 04 — Executing
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A26 — Team Development section
PMBOK8 Process Anchor Guide §2.6.2.4 Develop Team · Figure 2-44
Performance Domains Resources · Team
Focus Area Executing
Upstream Prerequisites SKL-04-03
Downstream Skills SKL-04-05
File Path skills/04-executing/SKL-04-04-develop-team.md

SKL-04-05 — Manage Team

Field Value
Skill ID SKL-04-05
Skill Name Manage Team
Pack 04 — Executing
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A26 — Performance / Conflict Log section
PMBOK8 Process Anchor Guide §2.6.2.5 Lead the Team · Figure 2-44
Performance Domains Resources · Team
Focus Area Executing
Upstream Prerequisites SKL-04-04
Downstream Skills SKL-05-08
File Path skills/04-executing/SKL-04-05-manage-team.md

SKL-04-06 — Manage Stakeholder Engagement

Field Value
Skill ID SKL-04-06
Skill Name Manage Stakeholder Engagement
Pack 04 — Executing
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A07 — SEAM (Execution updates)
PMBOK8 Process Anchor Guide §2.5.2.4 Manage Stakeholder Engagement · Figure 2-36
Performance Domains Stakeholders · Governance
Focus Area Executing
Upstream Prerequisites SKL-03-07
Downstream Skills SKL-05-07
File Path skills/04-executing/SKL-04-06-manage-stakeholder-engagement.md

SKL-04-07 — Manage Communications

Field Value
Skill ID SKL-04-07
Skill Name Manage Communications
Pack 04 — Executing
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A28 — Delivery Log section
PMBOK8 Process Anchor Guide §2.5.2.5 Manage Communications · Figure 2-37
Performance Domains Stakeholders · Delivery
Focus Area Executing
Upstream Prerequisites SKL-03-08
Downstream Skills SKL-05-09
File Path skills/04-executing/SKL-04-07-manage-communications.md

SKL-04-08 — Implement Risk Responses

Field Value
Skill ID SKL-04-08
Skill Name Implement Risk Responses
Pack 04 — Executing
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A19 — Response Log section
PMBOK8 Process Anchor Guide §2.7.2.5 Implement Risk Responses · Figure 2-52
Performance Domains Risk · Delivery
Focus Area Executing
Upstream Prerequisites SKL-03-12
Downstream Skills SKL-05-06
File Path skills/04-executing/SKL-04-08-implement-risk-responses.md

SKL-04-09 — Conduct Procurements

Field Value
Skill ID SKL-04-09
Skill Name Conduct Procurements
Pack 04 — Executing
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A31 — Contract and Procurement Log
PMBOK8 Process Anchor Guide §2.8.2.2 Conduct Procurements · Figure 2-55
Performance Domains Governance · Delivery
Focus Area Executing
Upstream Prerequisites SKL-03-01
Downstream Skills SKL-05-01
File Path skills/04-executing/SKL-04-09-conduct-procurements.md

Pack 05 — Monitoring & Controlling

Pack Purpose: Skills that execute during the Monitoring and Controlling focus area — tracking performance against baselines, controlling scope/schedule/cost/risk/resources/communications/stakeholders, and managing change.

Pack Prerequisites: Pack 04 skills active; A14 baselined; baselines set for A08, A15, A16, A19.

Pack Completion Criteria: All baselines remain valid or have been formally re-baselined through change control; performance reports current.


SKL-05-01 — Monitor and Control Project Work

Field Value
Skill ID SKL-05-01
Skill Name Monitor and Control Project Work
Pack 05 — Monitoring & Controlling
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A17 — Performance Report
Artifacts Updated A14 · A18 · A19
PMBOK8 Process Anchor Guide §2.1.6.5 Monitor and Control Project Work · Figure 2-7
Performance Domains Measurement · Governance
Focus Area Monitoring and Controlling
Upstream Prerequisites SKL-04-01
Downstream Skills SKL-05-02 · SKL-06-01
File Path skills/05-monitoring-controlling/SKL-05-01-monitor-and-control-project-work.md

SKL-05-02 — Perform Integrated Change Control

Field Value
Skill ID SKL-05-02
Skill Name Perform Integrated Change Control
Pack 05 — Monitoring & Controlling
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A12 — Change Log
Artifacts Updated A14 · A08 · A15 · A16 · A19
PMBOK8 Process Anchor Guide §2.1.6.6 Assess and Implement Changes · Figure 2-8
Performance Domains Governance · Measurement
Focus Area Monitoring and Controlling
Upstream Prerequisites SKL-05-01
Downstream Skills All baseline-holding skills
File Path skills/05-monitoring-controlling/SKL-05-02-perform-integrated-change-control.md

SKL-05-03 — Control Scope

Field Value
Skill ID SKL-05-03
Skill Name Control Scope
Pack 05 — Monitoring & Controlling
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A08 — Scope Control Log
PMBOK8 Process Anchor Guide §2.2.2.5 Control Scope · Figure 2-18
Performance Domains Scope · Measurement
Focus Area Monitoring and Controlling
Upstream Prerequisites SKL-03-05 · SKL-05-02
Downstream Skills SKL-05-02 (triggers change requests)
File Path skills/05-monitoring-controlling/SKL-05-03-control-scope.md

SKL-05-04 — Control Schedule

Field Value
Skill ID SKL-05-04
Skill Name Control Schedule
Pack 05 — Monitoring & Controlling
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A15 — EVM/SPI section
PMBOK8 Process Anchor Guide §2.3.2.5 Control Schedule · Figure 2-24
Performance Domains Schedule · Measurement
Focus Area Monitoring and Controlling
Upstream Prerequisites SKL-03-06 · SKL-05-02
Downstream Skills SKL-05-01 · SKL-05-02
File Path skills/05-monitoring-controlling/SKL-05-04-control-schedule.md

SKL-05-05 — Control Costs

Field Value
Skill ID SKL-05-05
Skill Name Control Costs
Pack 05 — Monitoring & Controlling
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A16 — EVM / CPI / EAC section
PMBOK8 Process Anchor Guide §2.4.2.4 Control Finances · Figure 2-30
Performance Domains Finance · Measurement
Focus Area Monitoring and Controlling
Upstream Prerequisites SKL-03-15 · SKL-05-02
Downstream Skills SKL-05-01 · SKL-06-02
File Path skills/05-monitoring-controlling/SKL-05-05-control-costs.md

SKL-05-06 — Monitor Risks

Field Value
Skill ID SKL-05-06
Skill Name Monitor Risks
Pack 05 — Monitoring & Controlling
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A19 — Risk Monitoring Log section
PMBOK8 Process Anchor Guide §2.7.2.6 Monitor Risks · Figure 2-53
Performance Domains Risk · Measurement
Focus Area Monitoring and Controlling
Upstream Prerequisites SKL-04-08
Downstream Skills SKL-05-02 · SKL-06-01
File Path skills/05-monitoring-controlling/SKL-05-06-monitor-risks.md

SKL-05-07 — Monitor Stakeholder Engagement

Field Value
Skill ID SKL-05-07
Skill Name Monitor Stakeholder Engagement
Pack 05 — Monitoring & Controlling
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A07 — SEAM Monitoring section
PMBOK8 Process Anchor Guide §2.5.2.6 Monitor Stakeholder Engagement · Figure 2-38
Performance Domains Stakeholders · Measurement
Focus Area Monitoring and Controlling
Upstream Prerequisites SKL-04-06
Downstream Skills SKL-04-06 (re-engagement trigger)
File Path skills/05-monitoring-controlling/SKL-05-07-monitor-stakeholder-engagement.md

SKL-05-08 — Control Resources

Field Value
Skill ID SKL-05-08
Skill Name Control Resources
Pack 05 — Monitoring & Controlling
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A26 — Resource Control Log
PMBOK8 Process Anchor Guide §2.6.2.6 Control Resources · Figure 2-45
Performance Domains Resources · Measurement
Focus Area Monitoring and Controlling
Upstream Prerequisites SKL-04-03 · SKL-04-05
Downstream Skills SKL-05-02 · SKL-06-01
File Path skills/05-monitoring-controlling/SKL-05-08-control-resources.md

SKL-05-09 — Monitor Communications

Field Value
Skill ID SKL-05-09
Skill Name Monitor Communications
Pack 05 — Monitoring & Controlling
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A28 — Communications Monitoring section
PMBOK8 Process Anchor Guide §2.5.2.7 Monitor Communications · Figure 2-39
Performance Domains Stakeholders · Measurement
Focus Area Monitoring and Controlling
Upstream Prerequisites SKL-04-07
Downstream Skills SKL-04-07 (re-plan trigger) · SKL-05-07
File Path skills/05-monitoring-controlling/SKL-05-09-monitor-communications.md

SKL-05-13 — Perform Earned Value Analysis

Field Value
Skill ID SKL-05-13
Skill Name Perform Earned Value Analysis
Pack 05 — Monitoring & Controlling
Status Active · Tested
Source Type PMI-derived
Primary Artifact (Output) A17 — Work Performance Information (EVM section)
Artifacts Updated A16 (Financial Record) · A12 (Change Log)
PMBOK8 Process Anchor Guide §2.4.2.4 Monitor and Control Finances · Practice Standard for EVM
Performance Domains Finance · Governance
Focus Area Monitoring and Controlling
Upstream Prerequisites SKL-05-05
Downstream Skills SKL-05-02
File Path skills/05-monitoring-controlling/SKL-05-13-perform-earned-value-analysis.md

Pack 06 — Closing

Pack Purpose: Skills that execute during the Closing focus area — formally closing the project or phase, conducting a final performance review, and capturing and archiving lessons learned and OPA updates.

Pack Prerequisites: All deliverables accepted or disposition documented. Final performance data available.

Pack Completion Criteria: A27 (Closure Record) signed. A21 (Lessons Learned) archived. OPA updated.


SKL-06-01 — Close Project or Phase

Field Value
Skill ID SKL-06-01
Skill Name Close Project or Phase
Pack 06 — Closing
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A27 — Project Closure Record
Artifacts Updated A14 · A05 · A21
PMBOK8 Process Anchor Guide §2.1.6.7 Close Project or Phase · Figure 2-9
Performance Domains Governance · Delivery
Focus Area Closing
Upstream Prerequisites SKL-05-01 · SKL-05-06 · All deliverables accepted
Downstream Skills SKL-06-02 · SKL-06-03
File Path skills/06-closing/SKL-06-01-close-project-or-phase.md

SKL-06-02 — Final Performance Review

Field Value
Skill ID SKL-06-02
Skill Name Final Performance Review
Pack 06 — Closing
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A17 — Final Performance Report
Artifacts Updated A27 — Closure Record (performance summary section)
PMBOK8 Process Anchor Guide §2.4.2 · §2.3.2 · §2.7.2 (closing performance synthesis)
Performance Domains Measurement · Governance
Focus Area Closing
Upstream Prerequisites SKL-06-01
Downstream Skills SKL-06-03
File Path skills/06-closing/SKL-06-02-final-performance-review.md

SKL-06-03 — Capture and Archive Lessons Learned

Field Value
Skill ID SKL-06-03
Skill Name Capture and Archive Lessons Learned
Pack 06 — Closing
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A21 — Lessons Learned Register (Final version)
Artifacts Updated A05 — OPA
PMBOK8 Process Anchor Guide §2.1.6.4 Manage Project Knowledge (closing activation)
Performance Domains Governance · Team
Focus Area Closing
Upstream Prerequisites SKL-06-01 · SKL-06-02 · SKL-07-03 (retrospective inputs, if applicable)
Downstream Skills None — terminal skill
File Path skills/06-closing/SKL-06-03-capture-and-archive-lessons-learned.md

Pack 07 — Adaptive & Hybrid

Pack Purpose: Skills that govern lifecycle approach selection, adaptive delivery mechanics (backlog management, iteration execution), continuous improvement (retrospectives), and hybrid project planning and delivery.

Pack Prerequisites: SKL-02-01 (Charter) must exist. Pack 07 skills activate based on lifecycle approach selected in SKL-07-01. Pack 07 skills operate in parallel with Pack 04, 05, and 06 for adaptive/hybrid projects.

Pack Completion Criteria: Lifecycle approach documented in A06 §2. Backlog maintained through execution. Retrospectives held each cycle. Hybrid structure documented if applicable.


SKL-07-01 — Select and Tailor Lifecycle Approach

Field Value
Skill ID SKL-07-01
Skill Name Select and Tailor Lifecycle Approach
Pack 07 — Adaptive & Hybrid
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A06 §2 — Development Approach section
Artifacts Updated Tailoring Decision Log
PMBOK8 Process Anchor PMBOK8 Standard §4.2–4.3 · Guide §2.3 (Development Approach and Life Cycle)
Performance Domains Development Approach and Life Cycle · Governance · Planning
Focus Area Initiating · Planning
Upstream Prerequisites SKL-02-01
Downstream Skills SKL-07-02 · SKL-07-04 · SKL-03-01 (A06 input)
File Path skills/07-adaptive-hybrid/SKL-07-01-select-and-tailor-lifecycle-approach.md
Notes Covers PMBOK8 4-step tailoring framework; suitability filters across 3 dimensions; DA Hybrid Levels 1–3; 4 hybrid patterns (P1–P4). Re-run at each phase gate or major change.

SKL-07-02 — Manage Backlog and Iterations

Field Value
Skill ID SKL-07-02
Skill Name Manage Backlog and Iterations
Pack 07 — Adaptive & Hybrid
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A08 — Backlog section
Artifacts Updated A15 (velocity / release forecast) · A07 (sprint review feedback)
PMBOK8 Process Anchor APG §5 · PMBOK8 Guide §2.3
Performance Domains Development Approach and Life Cycle · Planning · Delivery · Measurement
Focus Area Planning · Executing
Upstream Prerequisites SKL-07-01
Downstream Skills SKL-07-03 · SKL-04-06 · SKL-05-03
File Path skills/07-adaptive-hybrid/SKL-07-02-manage-backlog-and-iterations.md
Notes Covers iteration-based (Scrum-like) and flow-based (Kanban) patterns; DoR/DoD gates; velocity forecasting; sprint cadence table.

SKL-07-03 — Facilitate Retrospectives and Continuous Improvement

Field Value
Skill ID SKL-07-03
Skill Name Facilitate Retrospectives and Continuous Improvement
Pack 07 — Adaptive & Hybrid
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A21 — Retrospective section
Artifacts Updated Tailoring Changelog · A06
PMBOK8 Process Anchor PMBOK8 Standard Principle 12 · APG §5 · APG §3.3 Table 3-2
Performance Domains Team · Measurement · Development Approach and Life Cycle
Focus Area Executing
Upstream Prerequisites SKL-07-02
Downstream Skills SKL-07-01 (re-tailoring trigger) · SKL-06-03
File Path skills/07-adaptive-hybrid/SKL-07-03-facilitate-retrospectives-and-continuous-improvement.md
Notes Covers Start/Stop/Continue, 4Ls, Mad/Sad/Glad formats; Prime Directive; improvement backlog; A21 feed.

SKL-07-04 — Plan and Deliver Hybrid Projects

Field Value
Skill ID SKL-07-04
Skill Name Plan and Deliver Hybrid Projects
Pack 07 — Adaptive & Hybrid
Status Draft · Untested
Source Type PMI-derived
Primary Artifact (Output) A06 §2 — Hybrid Structure extension
Artifacts Updated A15 (master schedule) · A19 (cross-stream risks) · A17 (hybrid dashboard)
PMBOK8 Process Anchor PMBOK8 Standard §4.2.3 · APG §3.1.6–3.1.11 · DA Hybrid Levels 1–3
Performance Domains Development Approach and Life Cycle · Planning · Delivery · Governance
Focus Area Planning · Executing · Monitoring and Controlling
Upstream Prerequisites SKL-07-01
Downstream Skills SKL-07-02 · SKL-05-02 · SKL-05-01
File Path skills/07-adaptive-hybrid/SKL-07-04-plan-and-deliver-hybrid-projects.md
Notes Covers 4 hybrid patterns (P1–P4); stream mapping; integration point management; dual governance model; hybrid anti-patterns; combined EVM + velocity reporting.

Pack 08 — PMO Governance

Pack Purpose: Skills that execute at the PMO / Organizational level — running steering committee/governance board sessions, establishing status reporting templates/KPIs, performing PMO capability health audits, enforcing escalation protocols, and compiling portfolio-level status summaries.

Pack Prerequisites: Governance structure defined in A35; core reporting standards defined in A05.

Pack Completion Criteria: PMO service catalog established, portfolio dashboard active, compliance registry populated, escalation protocols active.


SKL-08-01 — Run Governance Board Packet

Field Value
Skill ID SKL-08-01
Skill Name Run Governance Board Packet
Pack 08 — PMO Governance
Status Active · Tested
Source Type PMI-derived
Primary Artifact (Output) A35 - Governance and Decision Authority Record (Board section)
Artifacts Updated A17 — Work Performance Information
PMBOK8 Process Anchor Guide §2.1 Governance Domain · PMO-Guide — §Building/Running PMO
Performance Domains Governance
Focus Area Executing
Upstream Prerequisites SKL-01-01
Downstream Skills SKL-08-05
File Path skills/08-pmo-governance/SKL-08-01-run-governance-board-packet.md

SKL-08-02 — Standardize Status Reporting

Field Value
Skill ID SKL-08-02
Skill Name Standardize Status Reporting
Pack 08 — PMO Governance
Status Active · Tested
Source Type PMI-derived
Primary Artifact (Output) A05 — Context Register (Status Reporting Standards section)
Artifacts Updated A17 — Work Performance Information (reporting template)
PMBOK8 Process Anchor Guide §2.1 Governance Domain · PMO-Guide — §Methodology & Standards
Performance Domains Governance
Focus Area Executing
Upstream Prerequisites SKL-01-01
Downstream Skills SKL-08-05
File Path skills/08-pmo-governance/SKL-08-02-standardize-status-reporting.md

SKL-08-03 — Perform PMO Health Check

Field Value
Skill ID SKL-08-03
Skill Name Perform PMO Health Check
Pack 08 — PMO Governance
Status Active · Tested
Source Type PMI-derived
Primary Artifact (Output) A05 — Context Register (PMO Maturity section)
Artifacts Updated A21 — Lessons Learned Register
PMBOK8 Process Anchor Guide §2.1 Governance Domain · PMO-Guide — §PMO Value & Maturity Assessment
Performance Domains Governance
Focus Area Closing
Upstream Prerequisites SKL-08-02
Downstream Skills SKL-08-05
File Path skills/08-pmo-governance/SKL-08-03-perform-pmo-health-check.md

SKL-08-04 — Manage Escalation Protocols

Field Value
Skill ID SKL-08-04
Skill Name Manage Escalation Protocols
Pack 08 — PMO Governance
Status Active · Tested
Source Type PMI-derived
Primary Artifact (Output) A35 — Governance and Decision Authority Record (Escalation section)
Artifacts Updated A18 — Issue, Impediment, and Action Log
PMBOK8 Process Anchor Guide §2.1 Governance Domain · AUTHORITY-ROUTING.md
Performance Domains Governance
Focus Area Executing
Upstream Prerequisites SKL-01-01
Downstream Skills SKL-08-01
File Path skills/08-pmo-governance/SKL-08-04-manage-escalation-protocols.md

SKL-08-05 — Manage PMO Portfolio Reporting

Field Value
Skill ID SKL-08-05
Skill Name Manage PMO Portfolio Reporting
Pack 08 — PMO Governance
Status Active · Tested
Source Type PMI-derived
Primary Artifact (Output) A05 — Context Register (Portfolio Report section)
Artifacts Updated A17 — Work Performance Information (Portfolio view)
PMBOK8 Process Anchor Guide §2.1 Governance Domain · PMO-Guide — §Portfolio Reporting
Performance Domains Governance
Focus Area Monitoring and Controlling
Upstream Prerequisites SKL-08-02
Downstream Skills SKL-08-03
File Path skills/08-pmo-governance/SKL-08-05-manage-pmo-portfolio-reporting.md

Dependency Chain Diagram

PACK 01 — ORGANIZATIONAL SETUP ✅
══════════════════════════════════════════════════════
[A01 Authorization trigger]
    └──▶ SKL-01-01 (Establish PM Governance Framework)
              └──▶ SKL-01-02 (Define Artifact and Document Control Standards)
                        └──▶ SKL-01-03 (Configure Repository and Tool Environment)
                                  └──▶ [Pack 02 Initiating begins]

PACK 02 — INITIATING ✅
══════════════════════════════════════════════════════
SKL-02-01 (Initiate Project or Phase)
    └──▶ SKL-02-02 (Identify Stakeholders)
              └──▶ [Pack 03 Planning begins]
              └──▶ SKL-07-01 (Lifecycle selection — may run in parallel)

PACK 03 — PLANNING (Stakeholder/Comms) ✅
══════════════════════════════════════════════════════
SKL-02-02 ──▶ SKL-03-07 (Plan Stakeholder Engagement)
                   └──▶ SKL-03-08 (Plan Communications Management)

PACK 03 — PLANNING (Scope/Schedule/Finance/Resource) ✅
══════════════════════════════════════════════════════
SKL-02-02 ──▶ SKL-03-02 ──▶ SKL-03-03 ──▶ SKL-03-04 ──▶ SKL-03-05
                                                              ├──▶ SKL-03-06
                                                              ├──▶ SKL-03-13 ──▶ SKL-03-14 ──▶ SKL-03-15
                                                              └──▶ SKL-03-16 ──▶ SKL-03-17

PACK 03 — PLANNING (Risk) ✅
══════════════════════════════════════════════════════
SKL-03-07 + SKL-03-02 ──▶ SKL-03-09 ──▶ SKL-03-10 ──▶ SKL-03-11 ──▶ SKL-03-12

PACK 03 — PLANNING (Integration) ✅
══════════════════════════════════════════════════════
All Pack 03 skills ──▶ SKL-03-01 (A14 Integrated PM Plan)
                              └──▶ [Pack 04 Executing begins]

PACK 04 — EXECUTING ✅
══════════════════════════════════════════════════════
SKL-03-01 ──▶ SKL-04-01 (Direct & Manage Work)
 SKL-03-17 ──▶ SKL-04-03 ──▶ SKL-04-04 ──▶ SKL-04-05
 SKL-03-07 ──▶ SKL-04-06
 SKL-03-08 ──▶ SKL-04-07
 SKL-03-12 ──▶ SKL-04-08
 SKL-03-01 ──▶ SKL-04-09
 SKL-04-01 ──▶ SKL-04-02

PACK 05 — MONITORING & CONTROLLING ✅
══════════════════════════════════════════════════════
SKL-04-01 ──▶ SKL-05-01 ──▶ SKL-05-02
SKL-03-05 + SKL-05-02 ──▶ SKL-05-03
SKL-03-06 + SKL-05-02 ──▶ SKL-05-04
SKL-03-15 + SKL-05-02 ──▶ SKL-05-05
SKL-04-08 ──▶ SKL-05-06
SKL-04-06 ──▶ SKL-05-07
SKL-04-03 + SKL-04-05 ──▶ SKL-05-08
SKL-04-07 ──▶ SKL-05-09

PACK 06 — CLOSING ✅
══════════════════════════════════════════════════════
SKL-05-01 + deliverables accepted ──▶ SKL-06-01
SKL-06-01 ──▶ SKL-06-02
SKL-06-02 + SKL-07-03 ──▶ SKL-06-03  [terminal]

PACK 07 — ADAPTIVE & HYBRID ✅
══════════════════════════════════════════════════════
SKL-02-01 ──▶ SKL-07-01 (Select Lifecycle Approach)
                   ├──▶ SKL-07-02 (Backlog & Iterations)  ──▶ SKL-07-03 (Retrospectives)
                   └──▶ SKL-07-04 (Hybrid Planning & Delivery)
               SKL-07-03 ──▶ SKL-07-01 (re-tailoring feedback loop)
               SKL-07-03 ──▶ SKL-06-03

Build Progress Summary

Pack Skill ID Skill Name Status
01 SKL-01-01 Establish PM Governance Framework ✅ Active · Tested
01 SKL-01-02 Define Artifact and Document Control Standards ✅ Active · Tested
01 SKL-01-03 Configure Project Repository and Tool Environment ✅ Active · Tested
02 SKL-02-01 Initiate Project or Phase ✅ Active · Tested
02 SKL-02-02 Identify Stakeholders ✅ Active · Tested
03 SKL-03-01 Integrate and Align Project Plans ✅ Active · Tested
03 SKL-03-02 Plan Scope Management ✅ Active · Tested
03 SKL-03-03 Elicit and Analyze Requirements ✅ Active · Tested
03 SKL-03-04 Define Scope ✅ Active · Tested
03 SKL-03-05 Develop Scope Structure ✅ Active · Tested
03 SKL-03-06 Plan Schedule Management ✅ Active · Tested
03 SKL-03-06b Develop and Baseline Schedule (Detailed) ✅ Active · Tested
03 SKL-03-07 Plan Stakeholder Engagement ✅ Active · Tested
03 SKL-03-08 Plan Communications Management ✅ Active · Tested
03 SKL-03-09 Plan Risk Management ✅ Active · Tested
03 SKL-03-10 Identify Risks ✅ Active · Tested
03 SKL-03-11 Perform Risk Analysis ✅ Active · Tested
03 SKL-03-12 Plan Risk Responses ✅ Active · Tested
03 SKL-03-13 Plan Financial Management ✅ Active · Tested
03 SKL-03-14 Estimate Costs ✅ Active · Tested
03 SKL-03-15 Develop Budget ✅ Active · Tested
03 SKL-03-16 Plan Resource Management ✅ Active · Tested
03 SKL-03-17 Estimate Resources ✅ Active · Tested
03 SKL-03-18 Integrate Sustainability Into Project Planning ✅ Active · Tested
03 SKL-03-19 Plan Quality Management ✅ Active · Tested
03 SKL-03-20 Plan Procurement Management ✅ Active · Tested
03 SKL-03-21 Develop Requirements Traceability Matrix ✅ Active · Tested
04 SKL-04-01 Direct and Manage Project Work ✅ Active · Tested
04 SKL-04-02 Manage Project Knowledge ✅ Active · Tested
04 SKL-04-03 Acquire Resources ✅ Active · Tested
04 SKL-04-04 Develop Team ✅ Active · Tested
04 SKL-04-05 Manage Team ✅ Active · Tested
04 SKL-04-06 Manage Stakeholder Engagement ✅ Active · Tested
04 SKL-04-07 Manage Communications ✅ Active · Tested
04 SKL-04-08 Implement Risk Responses ✅ Active · Tested
04 SKL-04-09 Conduct Procurements ✅ Active · Tested
05 SKL-05-01 Monitor and Control Project Work ✅ Active · Tested
05 SKL-05-02 Perform Integrated Change Control ✅ Active · Tested
05 SKL-05-03 Control Scope ✅ Active · Tested
05 SKL-05-04 Control Schedule ✅ Active · Tested
05 SKL-05-05 Control Costs ✅ Active · Tested
05 SKL-05-06 Monitor Risks ✅ Active · Tested
05 SKL-05-07 Monitor Stakeholder Engagement ✅ Active · Tested
05 SKL-05-08 Control Resources ✅ Active · Tested
05 SKL-05-09 Monitor Communications ✅ Active · Tested
05 SKL-05-13 Perform Earned Value Analysis ✅ Active · Tested
06 SKL-06-01 Close Project or Phase ✅ Active · Tested
06 SKL-06-02 Final Performance Review ✅ Active · Tested
06 SKL-06-03 Capture and Archive Lessons Learned ✅ Active · Tested
07 SKL-07-01 Select and Tailor Lifecycle Approach ✅ Active · Tested
07 SKL-07-02 Manage Backlog and Iterations ✅ Active · Tested
07 SKL-07-03 Facilitate Retrospectives and Continuous Improvement ✅ Active · Tested
07 SKL-07-04 Plan and Deliver Hybrid Projects ✅ Active · Tested
08 SKL-08-01 Run Governance Board Packet ✅ Active · Tested
08 SKL-08-02 Standardize Status Reporting ✅ Active · Tested
08 SKL-08-03 Perform PMO Health Check ✅ Active · Tested
08 SKL-08-04 Manage Escalation Protocols ✅ Active · Tested
08 SKL-08-05 Manage PMO Portfolio Reporting ✅ Active · Tested

Built: 58 skills ✅
Planned: 0
Total indexed: 58 skills — All packs complete (Pack 01–08)


Artifact Cross-Reference

Artifact Created By Extended / Updated By
A03 — Repository and Tool Configuration Record SKL-01-03 SKL-01-03 (re-run on major environment change)
A04 — Project Charter SKL-02-01
A05 — Context Register / OPA SKL-01-01 (Governance) · SKL-01-02 (Doc Control) · SKL-01-03 (Tool Environment) SKL-02-01 · SKL-02-02 · SKL-04-02 · SKL-06-03
A06 — Project Management Plan (lifecycle/tailoring sections) SKL-07-01 SKL-07-04 · SKL-07-03 (tailoring changelog) · SKL-01-01 (governance ref) · SKL-01-02 (doc control ref) · SKL-01-03 (tool env ref)
A07 — Stakeholder Register and Engagement Strategy SKL-02-02 SKL-03-07 · SKL-03-08 · SKL-04-06 · SKL-05-07
A08 — Scope and Requirements / Backlog SKL-03-02 SKL-03-03 · SKL-03-04 · SKL-03-05 · SKL-05-03 · SKL-07-02
A12 — Change Log SKL-05-02 SKL-05-02 (ongoing)
A14 — Integrated PM Plan SKL-03-01 All planning skills (subsidiary references) · SKL-05-02
A15 — Schedule Model SKL-03-06 SKL-03-08 · SKL-04-01 · SKL-05-04 · SKL-07-02 · SKL-07-04
A16 — Financial Management / Cost Baseline SKL-03-13 SKL-03-14 · SKL-03-15 · SKL-05-05
A17 — Performance Report SKL-05-01 SKL-06-02 · SKL-07-04 (hybrid dashboard)
A18 — Issue Log SKL-04-01 SKL-04-01 (ongoing)
A19 — Risk Management Record SKL-03-09 SKL-02-02 · SKL-03-07 · SKL-03-10–12 · SKL-04-08 · SKL-05-06 · SKL-07-04
A21 — Lessons Learned Register SKL-04-02 SKL-07-03 · SKL-06-03
A26 — Resource Capacity and Acquisition Record SKL-03-16 SKL-03-17 · SKL-04-03 · SKL-04-04 · SKL-04-05 · SKL-05-08
A27 — Project Closure Record SKL-06-01 SKL-06-02
A28 — Communications and Reporting Record SKL-03-08 SKL-04-07 · SKL-05-09
A31 — Contract and Procurement Log SKL-04-09 SKL-04-09 (ongoing)
A-NEW-SUST — Sustainability Register SKL-03-18 SKL-05-01

Naming and ID Conventions

Convention Rule
Skill ID format SKL-PP-NN — PP = 2-digit pack number; NN = 2-digit sequence within pack
File naming SKL-PP-NN-kebab-case-skill-name.md
Pack folder skills/PP-packname/ (e.g., skills/01-organizational-setup/)
Status values Draft · UntestedDraft · In ReviewReviewedApproved · Production
Source type PMI-derived / synthesis / organization-defined
PMBOK8 anchor Always cite Guide section number + Figure number

Registry Maintenance Rules

  1. Add a shell entry for every planned skill before it is built — the registry must always show the full planned build scope.
  2. Update status immediately when a skill file is created, reviewed, or approved.
  3. Update the Artifact Cross-Reference table whenever a skill adds a new artifact write target.
  4. Update the Dependency Chain Diagram when a new skill's position in the chain is non-obvious.
  5. Never remove a skill entry — deprecated skills are marked Deprecated · Replaced by SKL-XX-XX.
  6. This registry is not a skill file — it does not contain instructions, tests, or step-by-step guidance.

Authority: PMBOK8 · Artifacts-V-1.1 · Repository Operating Rules §3.2 Consolidation Rule
Owner: Repository Maintainer
Version: 1.3.1 — Updated 2026-06-03 — Wave 1 audit fixes applied (F-23); total built = 48/48; all packs complete