name sprint-review
model standard
description Generate a sprint review summary from completed work, metrics, and retrospective signals
usage /sprint-review [--days <N>] [--save] [--team]

/sprint-review

Generate a comprehensive sprint review report from git history, completed TODOs, roadmap progress, and retrospective signals — covering a full sprint period.

Usage

/sprint-review [--days <N>] [--save] [--team]

Arguments:

  • --days (optional) — Sprint duration in days. Defaults to 14 (two-week sprint).
  • --save (optional) — Save the review to docs/sprints/sprint-YYYY-MM-DD.md in addition to terminal output.
  • --team (optional) — Include per-author breakdowns in commits and metrics sections.

Examples

/sprint-review                                # Two-week sprint review (default)
/sprint-review --days 7                       # One-week sprint review
/sprint-review --days 21                      # Three-week sprint
/sprint-review --days 14 --save               # Default sprint, save to file
/sprint-review --days 14 --team               # Include per-author breakdown
/sprint-review --days 14 --save --team        # Full report saved with team stats

What It Does

  1. Resolves the sprint window from --days argument (defaults to 14 days back from today)
  2. Parses git log for all commits within the sprint window, grouped by day and author
  3. Scans TODO.md for items completed during the sprint
  4. Reads docs/planning/roadmap.md to determine roadmap phase progress
  5. Collects demo-worthy items — features, UI changes, and user-facing improvements
  6. Computes sprint metrics — velocity, throughput, completion rate, and trends
  7. Extracts retrospective signals — what went well, what was painful, recurring patterns
  8. Identifies carryover items — work planned but not completed during the sprint
  9. Formats the sprint review using the output template
  10. Outputs the review to the terminal and optionally saves to file

Implementation Steps

Use TodoWrite to track progress through each phase.

Phase 1: Resolve Sprint Window

Determine the sprint boundaries from the --days argument.

Parameter Resolution
--days 14 (default) 14 calendar days before today at midnight → today at current time
--days 7 7 calendar days before today at midnight → today
--days N N calendar days before today at midnight → today

Store as SPRINT_START and SPRINT_END. All subsequent phases use this window.

Phase 2: Parse Git History

Run git commands to collect the full commit history for the sprint:

# All commits in the sprint, chronological order
git log --since="$SPRINT_START" --until="$SPRINT_END" --format="%H|%h|%s|%an|%ai" --reverse

# Commits per day
git log --since="$SPRINT_START" --until="$SPRINT_END" --format="%ad" --date=short | sort | uniq -c

# File change stats
git log --since="$SPRINT_START" --until="$SPRINT_END" --format="" --numstat

# Per-author commit counts (if --team)
git log --since="$SPRINT_START" --until="$SPRINT_END" --format="%an" | sort | uniq -c | sort -rn

Group commits into logical categories by scanning commit message prefixes and keywords:

Category Keyword Signals
Features feat:, add, implement, introduce, new, create
Bug Fixes fix:, bug, patch, resolve, correct
Refactoring refactor:, clean, restructure, simplify, extract
Infrastructure ci:, build:, deploy, docker, config, deps
Documentation docs:, readme, comment, guide
Tests test:, spec, coverage, assert

Phase 3: Scan Completed Work

Read planning files to identify work completed during the sprint:

File What to Extract
TODO.md Items marked [x] with matching commit activity in the sprint window
docs/planning/roadmap.md Phase items completed, phases that transitioned to "Done"
task_plan.md Acceptance criteria checked off during the sprint
docs/sessions/*.md Session summaries from within the sprint window (if they exist)
CHANGELOG.md Entries added during the sprint window

Cross-reference completed TODOs against git history to validate they were truly completed within the sprint, not before.

Phase 4: Identify Demo-Worthy Items

From the completed work, extract items suitable for a sprint demo — user-visible changes that stakeholders would care about:

Signal Demo Candidate
New API endpoint or route Yes — demonstrate with example request/response
UI component added or changed Yes — screenshot or describe the visual change
Performance improvement Yes — include before/after metrics if available
New CLI command or tool Yes — show example usage
Internal refactor only No — mention in metrics, not demo
CI/CD pipeline change No — unless it enables a new workflow
Dependency update No — unless it fixes a user-facing issue

Present demo items as a numbered list with a one-line description and the evidence (commit hash, file, or TODO reference).

Phase 5: Compute Sprint Metrics

Calculate quantitative metrics for the sprint:

Metric Calculation
Tasks completed Count of [x] items in TODO.md with sprint-window commits
Tasks planned Count of items that were [ ] at sprint start (infer from git history of TODO.md)
Completion rate tasks_completed / tasks_planned * 100
Total commits Count of commits in the sprint window
Files changed Unique files modified across all commits
Lines added Sum of insertions from --numstat
Lines removed Sum of deletions from --numstat
Commits/day total_commits / days
Tasks/day tasks_completed / days
Velocity trend Compare first-half vs second-half commit rates
Focus ratio feature_commits / total_commits * 100 — higher means more feature work vs maintenance

If --team is passed, compute per-author breakdowns for commits, lines changed, and top files modified.

Phase 6: Extract Retrospective Signals

Automatically detect retrospective-worthy patterns from the sprint data:

What went well (detect from):

  • High completion rate (>80%)
  • Velocity trend upward (▲)
  • Zero blockers or blockers quickly resolved
  • Clean commit history (few reverts, few "fix fix" commits)
  • Tests added alongside features

What needs improvement (detect from):

  • Low completion rate (<60%)
  • Velocity trend downward (▼)
  • Persistent blockers (tagged [blocked] for >3 days)
  • High churn files (same file modified in 5+ commits)
  • "Fix" commits that reference the same area repeatedly
  • Missing tests for new features
  • Revert commits

Patterns to flag:

  • Commits concentrated in the last 2 days of the sprint ("sprint cramming")
  • Large commits (>200 lines changed) vs many small commits
  • Ratio of bug fixes to features (>50% bug fixes suggests tech debt)

Phase 7: Identify Carryover Items

Find work that was planned for this sprint but not completed:

  1. Read TODO.md for items still marked [ ] that have partial commit activity in the sprint
  2. Check task_plan.md for unchecked acceptance criteria
  3. Check roadmap active phase for incomplete items
  4. Flag items that were in-progress ([/]) but not completed

Classify carryover by reason:

Reason Detection
Not started [ ] with zero commit activity
Partially done [ ] or [/] with some commit activity
Blocked Tagged [blocked] or [waiting]
Descoped Tagged [-] or [cancelled] during the sprint

Phase 8: Format and Output

Assemble the full sprint review using the output template. If --save is passed:

  1. Create docs/sprints/ directory if it does not exist
  2. Write the review to docs/sprints/sprint-YYYY-MM-DD.md (date = sprint end date)
  3. If the file already exists, overwrite with the latest data

Output

The terminal output and saved file follow this structure:

Sprint Review — YYYY-MM-DD to YYYY-MM-DD
=========================================

Sprint Duration: N days
Generated: YYYY-MM-DD HH:MM

## Completed Work

### Features
- [x] User dashboard with real-time charts (a1b2c3d, d4e5f6a)
- [x] Rate limiting on /api/auth endpoints (b7c8d9e)
- [x] CSV export for reports (f0a1b2c)

### Bug Fixes
- [x] Token refresh race condition (c3d4e5f)
- [x] Pagination offset error on search results (e6f7a8b)

### Infrastructure
- [x] Upgrade Node.js to v20 LTS (d9e0f1a)
- [x] Add GitHub Actions caching for CI (a2b3c4d)

### Documentation
- [x] API rate limiting guide (f5a6b7c)

## Demo Items
1. User dashboard — real-time charts with WebSocket updates (src/components/Dashboard.tsx)
2. CSV export — one-click download from any report page (src/features/reports/export.ts)
3. Rate limiting — returns 429 with Retry-After header (src/middleware/rate-limit.ts)

## Sprint Metrics

| Metric           | Value         |
|------------------|---------------|
| Tasks completed  | 8             |
| Tasks planned    | 10            |
| Completion rate  | 80%           |
| Total commits    | 34            |
| Files changed    | 28            |
| Lines added      | +1,240        |
| Lines removed    | -380          |
| Commits/day      | 2.4           |
| Tasks/day        | 0.6           |
| Velocity trend   | ▲ +12%        |
| Focus ratio      | 65% features  |

## Carryover Items
| Item                            | Status          | Reason          |
|---------------------------------|-----------------|-----------------|
| WebSocket reconnection logic    | [/] In-progress | Partially done  |
| Admin role permissions          | [ ] Pending     | Not started     |

## Retrospective Signals

### What Went Well
- 80% completion rate — strong sprint execution
- Tests added for all new features (12 test files)
- Velocity trending upward (+12%) vs previous period
- Zero revert commits

### Needs Improvement
- 60% of commits landed in the last 3 days (sprint cramming detected)
- src/auth/token.ts modified in 7 commits — high churn suggests unclear requirements
- 2 carryover items — consider smaller scope for next sprint

### Patterns
- Bug fix ratio: 25% — healthy balance of feature vs maintenance work
- Average commit size: 47 lines — good granularity

## Next Sprint Candidates
1. [/] WebSocket reconnection logic (carryover — partially done)
2. [ ] Admin role permissions (carryover — not started)
3. [ ] E2E test suite for auth flows
4. [ ] Performance audit for dashboard queries
5. [ ] API versioning strategy decision

NEVER Do

  • Never fabricate completed work. Only report items verified through git log and TODO.md state within the sprint window.
  • Never modify source files. This command is strictly read-only. Do not update TODO.md, roadmap, or any planning files.
  • Never invent retrospective signals. Only flag patterns detectable from commit history, TODO state, and file change data.
  • Never include commits from outside the sprint window. Respect the --days boundary strictly.
  • Never present carryover as failure. Frame it neutrally — carryover is normal and helps inform next sprint planning.
  • Never skip the metrics section. Quantitative data is essential for sprint reviews — always compute and display it.
  • Never report velocity trend without sufficient data. If the sprint has fewer than 4 commits, note that trend data is unreliable.
  • Never save without the --save flag. Terminal-only output is the default behavior.
  • Never list more than 7 next sprint candidates. Keep the next sprint focused and realistic.
  • Never attribute individual performance judgments. The --team flag shows contribution distribution, not performance ratings.

Error Handling

  • If no commits exist in the sprint window, report "No commits in the last N days" and suggest adjusting --days. Proceed with TODO-only analysis.
  • If TODO.md does not exist, skip task completion scanning and note: "No TODO.md found — task completion metrics unavailable."
  • If docs/planning/roadmap.md does not exist, skip roadmap phase analysis and note: "No roadmap found — phase progress unavailable."
  • If task_plan.md does not exist, skip acceptance criteria analysis and proceed.
  • If the project is not a git repository, abort with: "Not a git repository. Run this command from within a git project."
  • If --days is less than 1 or greater than 90, abort with: "Invalid --days value. Use a value between 1 and 90. For daily summaries, use /daily-standup."
  • If docs/sprints/ cannot be created when --save is used, fall back to saving in the project root and warn the user.
  • If --team is used but all commits have the same author, skip the per-author breakdown and note: "Single contributor detected — team breakdown skipped."
  • If session summary files exist in docs/sessions/ for the sprint window, incorporate them. If not, proceed without them.

Related

  • Command: /daily-standup (daily granularity vs sprint-level review)
  • Command: /progress (real-time progress dashboard with velocity metrics)
  • Command: /session-summary (single-session detail for use during a sprint)
  • Command: /start-task (creates task plans referenced in the sprint review)
  • Agent: ai/agents/development/