Skip to content

fix: properly handle None dependency_graph during merge #708

fix: properly handle None dependency_graph during merge

fix: properly handle None dependency_graph during merge #708

Triggered via pull request January 2, 2026 23:02
Status Failure
Total duration 1m 21s
Artifacts

run_dev_tests.yml

on: pull_request
Matrix: linters
Matrix: tests
Fit to window
Zoom out
Zoom in

Annotations

7 errors
tests (3.11)
Process completed with exit code 1.
tests (3.10)
The strategy configuration was canceled because "tests._3_11" failed
tests (3.10)
Process completed with exit code 1.
tests (3.12)
The strategy configuration was canceled because "tests._3_11" failed
tests (3.12)
The operation was canceled.
tests (3.13)
The strategy configuration was canceled because "tests._3_11" failed
tests (3.13)
The operation was canceled.