Skip to content

Conversation

@johan-hultberg-work
Copy link
Contributor

Sync from staging

isak-jakobsson and others added 5 commits January 17, 2025 12:37
Change-Id: I44f6162f56d4a42be086cfa8430c5261db9c7934
Co-authored-by: Corallo <[email protected]>
Co-authored-by: GHakansson <[email protected]>
Co-authored-by: Patrik Åkesson <[email protected]>
Co-authored-by: pataxis <[email protected]>
Co-authored-by: Stiv Abdullwahed <[email protected]>
Co-authored-by: Isak Jakobsson <[email protected]>
Note, the dummy file is needed for lint resons as well. Actual test of Artpec 9 is run by Artpec 8 file.
Co-authored-by: github-axiscommunications-ecosystem <[email protected]>
@johan-hultberg-work johan-hultberg-work requested a review from a team as a code owner January 20, 2025 06:15
@johan-hultberg-work
Copy link
Contributor Author

Closing PR to create multiple sync branches instead, so that changes can be easier tracked in PR branches.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Development

Successfully merging this pull request may close these issues.

5 participants