Skip to content

init

init #1

Triggered via push November 9, 2025 09:00
Status Cancelled
Total duration 29s
Artifacts

run-tests.yml

on: push
Matrix: ci
Fit to window
Zoom out
Zoom in

Annotations

13 errors
Node 22 - macos-latest
Process completed with exit code 2.
Node 22 - macos-latest: vitest.config.ts#L5
No overload matches this call.
Node 20 - ubuntu-latest
Process completed with exit code 2.
Node 20 - ubuntu-latest: vitest.config.ts#L5
No overload matches this call.
Node 22 - ubuntu-latest
Process completed with exit code 2.
Node 22 - ubuntu-latest: vitest.config.ts#L5
No overload matches this call.
Node 20 - macos-latest
Process completed with exit code 2.
Node 20 - macos-latest: vitest.config.ts#L5
No overload matches this call.
Node 22 - windows-latest
Canceling since a higher priority waiting request for Test & Build-refs/heads/main exists
Node 22 - windows-latest
The operation was canceled.
Node 20 - windows-latest
Canceling since a higher priority waiting request for Test & Build-refs/heads/main exists
Node 20 - windows-latest
The operation was canceled.
Test & Build
Canceling since a higher priority waiting request for Test & Build-refs/heads/main exists