Skip to content

Get ready for release 9.0.0 #206

Get ready for release 9.0.0

Get ready for release 9.0.0 #206

Triggered via pull request August 30, 2025 10:34
@rockyrocky
synchronize #34
release-9.0
Status Failure
Total duration 36s
Artifacts

ubuntu.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build (3.12)
Process completed with exit code 1.
build (3.11)
The operation was canceled.
build (3.11)
The strategy configuration was canceled because "build._3_12" failed
build (3.10)
The operation was canceled.
build (3.10)
The strategy configuration was canceled because "build._3_12" failed
build (3.13)
The operation was canceled.
build (3.13)
The strategy configuration was canceled because "build._3_12" failed