Skip to content

[20.2.x] build: move from using WORKSPACE to MODULE.bazel #7571

[20.2.x] build: move from using WORKSPACE to MODULE.bazel

[20.2.x] build: move from using WORKSPACE to MODULE.bazel #7571

Triggered via pull request August 19, 2025 14:40
Status Cancelled
Total duration 1m 37s
Artifacts

pr.yml

on: pull_request
test
0s
test
e2e-windows-subset
0s
e2e-windows-subset
Matrix: e2e-package-managers
Matrix: e2e
Matrix: e2e-snapshots
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build
The operation was canceled.
build
Canceling since a higher priority waiting request for Pull Request-refs/pull/30958/merge exists
lint
The operation was canceled.
lint
Canceling since a higher priority waiting request for Pull Request-refs/pull/30958/merge exists
Pull Request
Canceling since a higher priority waiting request for Pull Request-refs/pull/30958/merge exists