build: update bazel dependencies (main) #9017
pr.yml
on: pull_request
build
2m 9s
analyze
7s
build-e2e-windows-subset
2m 20s
lint
2m 2s
test
6m 30s
Matrix: e2e-package-managers
Matrix: e2e
Matrix: e2e-snapshots
e2e-windows-subset
4m 29s
Annotations
5 errors
e2e (ubuntu-latest, 22, npm, 0)
The operation was canceled.
|
e2e (ubuntu-latest, 22, npm, 0)
Canceling since a higher priority waiting request for Pull Request-refs/pull/31418/merge exists
|
Pull Request
Canceling since a higher priority waiting request for Pull Request-refs/pull/31418/merge exists
|
e2e (ubuntu-latest, 22, npm, 1)
The operation was canceled.
|
e2e (ubuntu-latest, 22, npm, 1)
Canceling since a higher priority waiting request for Pull Request-refs/pull/31418/merge exists
|
Artifacts
Produced during runtime
Name | Size | Digest | |
---|---|---|---|
packages
|
3.42 MB |
sha256:9e486ee458704c9a8a8230bc06e4206b091d8ee4ca331960b4fcc26701baa8ca
|
|
win-e2e-build-artifacts
Expired
|
156 MB |
sha256:e253e887d8372972e1001117cbd5cf2f6fb6900ea9fb78b554a7f77bb77bc9e2
|
|