Skip to content

build: update bazel dependencies (20.3.x) #9019

build: update bazel dependencies (20.3.x)

build: update bazel dependencies (20.3.x) #9019

Triggered via pull request October 9, 2025 10:39
Status Cancelled
Total duration 12m 53s
Artifacts 2

pr.yml

on: pull_request
Matrix: e2e-package-managers
Matrix: e2e
Matrix: e2e-snapshots
e2e-windows-subset
4m 14s
e2e-windows-subset
Fit to window
Zoom out
Zoom in

Annotations

7 errors
e2e (ubuntu-latest, 22, npm, 2)
The operation was canceled.
e2e (ubuntu-latest, 22, npm, 2)
Canceling since a higher priority waiting request for Pull Request-refs/pull/31420/merge exists
e2e (ubuntu-latest, 22, npm, 0)
The operation was canceled.
e2e (ubuntu-latest, 22, npm, 0)
Canceling since a higher priority waiting request for Pull Request-refs/pull/31420/merge exists
e2e (ubuntu-latest, 22, npm, 5)
The operation was canceled.
e2e (ubuntu-latest, 22, npm, 5)
Canceling since a higher priority waiting request for Pull Request-refs/pull/31420/merge exists
Pull Request
Canceling since a higher priority waiting request for Pull Request-refs/pull/31420/merge exists

Artifacts

Produced during runtime
Name Size Digest
packages
2.89 MB
sha256:c95a6765ef5bbd69e5f0f5547c6bd1613d285205bd75b90c53a2ed637e15d39e
win-e2e-build-artifacts Expired
156 MB
sha256:b19d8430b16525aa66f10a094fcc3e455558659e97bead064dcc11be85079598