build: update bazel dependencies (20.3.x) #9019
pr.yml
on: pull_request
build
2m 32s
analyze
6s
build-e2e-windows-subset
2m 40s
lint
2m 13s
test
3m 18s
Matrix: e2e-package-managers
Matrix: e2e
Matrix: e2e-snapshots
e2e-windows-subset
4m 14s
Annotations
7 errors
e2e (ubuntu-latest, 22, npm, 2)
The operation was canceled.
|
e2e (ubuntu-latest, 22, npm, 2)
Canceling since a higher priority waiting request for Pull Request-refs/pull/31420/merge exists
|
e2e (ubuntu-latest, 22, npm, 0)
The operation was canceled.
|
e2e (ubuntu-latest, 22, npm, 0)
Canceling since a higher priority waiting request for Pull Request-refs/pull/31420/merge exists
|
e2e (ubuntu-latest, 22, npm, 5)
The operation was canceled.
|
e2e (ubuntu-latest, 22, npm, 5)
Canceling since a higher priority waiting request for Pull Request-refs/pull/31420/merge exists
|
Pull Request
Canceling since a higher priority waiting request for Pull Request-refs/pull/31420/merge exists
|
Artifacts
Produced during runtime
Name | Size | Digest | |
---|---|---|---|
packages
|
2.89 MB |
sha256:c95a6765ef5bbd69e5f0f5547c6bd1613d285205bd75b90c53a2ed637e15d39e
|
|
win-e2e-build-artifacts
Expired
|
156 MB |
sha256:b19d8430b16525aa66f10a094fcc3e455558659e97bead064dcc11be85079598
|
|