build: update bazel dependencies (main) #9021
pr.yml
on: pull_request
build
2m 13s
analyze
7s
build-e2e-windows-subset
2m 26s
lint
2m 11s
test
3m 14s
Matrix: e2e-package-managers
Matrix: e2e
Matrix: e2e-snapshots
e2e-windows-subset
5m 0s
Annotations
7 errors
e2e (ubuntu-latest, 22, npm, 2)
The operation was canceled.
|
e2e (ubuntu-latest, 22, npm, 2)
Canceling since a higher priority waiting request for Pull Request-refs/pull/31418/merge exists
|
e2e (ubuntu-latest, 22, npm, 1)
The operation was canceled.
|
e2e (ubuntu-latest, 22, npm, 1)
Canceling since a higher priority waiting request for Pull Request-refs/pull/31418/merge exists
|
e2e (ubuntu-latest, 22, npm, 0)
The operation was canceled.
|
e2e (ubuntu-latest, 22, npm, 0)
Canceling since a higher priority waiting request for Pull Request-refs/pull/31418/merge exists
|
Pull Request
Canceling since a higher priority waiting request for Pull Request-refs/pull/31418/merge exists
|
Artifacts
Produced during runtime
Name | Size | Digest | |
---|---|---|---|
packages
|
3.42 MB |
sha256:5615ef9a787470b8772658a0516123b362584b65b65d7a6bf816da152cd00e9d
|
|
win-e2e-build-artifacts
Expired
|
156 MB |
sha256:002661d0c4b5bb3aba2d33dc46279104dac2a12a771f13444f9dd9b902683c05
|
|