Skip to content

Conversation

angular-robot
Copy link
Collaborator

This PR contains the following updates:

Update Change
lockFileMaintenance All locks refreshed

🔧 This Pull Request updates lock files to use the latest dependency versions.


Configuration

📅 Schedule: Branch creation - "before 4am on monday" in timezone America/Tijuana, Automerge - At any time (no schedule defined).

🚦 Automerge: Disabled by config. Please merge this manually once you are satisfied.

Rebasing: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox.

👻 Immortal: This PR will be recreated if closed unmerged. Get config help if that's undesired.


  • If you want to rebase/retry this PR, check this box

This PR has been generated by Renovate Bot.

@angular-robot angular-robot added action: merge The PR is ready for merge by the caretaker target: minor This PR is targeted for the next minor release labels Nov 25, 2024
@angular-robot angular-robot bot added the area: build & ci Related the build and CI infrastructure of the project label Nov 25, 2024
@alan-agius4 alan-agius4 added the merge: caretaker note Alert the caretaker performing the merge to check the PR for an out of normal action needed or note label Nov 25, 2024
@alan-agius4
Copy link
Collaborator

carataker note: the lint failure can be ignored as it's due to the combination of licenses both of which are valid.

  yarn.lock » [email protected] – License: ISC AND MIT

@clydin clydin merged commit bccdf77 into angular:main Nov 25, 2024
33 of 34 checks passed
@angular-automatic-lock-bot
Copy link

This issue has been automatically locked due to inactivity.
Please file a new issue if you are encountering a similar or related problem.

Read more about our automatic conversation locking policy.

This action has been performed automatically by a bot.

@angular-automatic-lock-bot angular-automatic-lock-bot bot locked and limited conversation to collaborators Dec 26, 2024
Sign up for free to subscribe to this conversation on GitHub. Already have an account? Sign in.

Labels

action: merge The PR is ready for merge by the caretaker area: build & ci Related the build and CI infrastructure of the project merge: caretaker note Alert the caretaker performing the merge to check the PR for an out of normal action needed or note target: minor This PR is targeted for the next minor release

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants