Skip to content

[PR #10096/a042721c backport][stable-8] pipx/pipx_info: fix scheduled tests#10098

Merged
felixfontein merged 1 commit intostable-8from
patchback/backports/stable-8/a042721c821a873d80abf3abbe8d3fed8aeab1c2/pr-10096
May 4, 2025
Merged

[PR #10096/a042721c backport][stable-8] pipx/pipx_info: fix scheduled tests#10098
felixfontein merged 1 commit intostable-8from
patchback/backports/stable-8/a042721c821a873d80abf3abbe8d3fed8aeab1c2/pr-10096

Conversation

@patchback
Copy link

@patchback patchback bot commented May 4, 2025

This is a backport of PR #10096 as merged into main (a042721).

SUMMARY

Fix the failing scheduled tests.

ISSUE TYPE
  • Test Pull Request
COMPONENT NAME

pipx
pipx_info

@ansibullbot ansibullbot added backport integration tests/integration new_contributor Help guide this first time contributor tests tests labels May 4, 2025
@felixfontein felixfontein merged commit cec5b11 into stable-8 May 4, 2025
126 checks passed
@felixfontein felixfontein deleted the patchback/backports/stable-8/a042721c821a873d80abf3abbe8d3fed8aeab1c2/pr-10096 branch May 4, 2025 12:02
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

backport integration tests/integration new_contributor Help guide this first time contributor tests tests

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants