This repository was archived by the owner on Feb 9, 2026. It is now read-only.
-
Notifications
You must be signed in to change notification settings - Fork 0
release template
CengizBilalSari edited this page Dec 15, 2025
·
1 revision
| Requirement Number | Description |
|---|---|
| 1.1.1.3 | Registered users shall be able to reset their passwords. |
| 1.1.3.2 | Registered users shall be able to earn points for logging recycling. |
| 1.1.4.3 | Moderator shall be able to see reports that are sent by users about a post. |
| 1.1.4.4 | Moderator shall be able to delete a post if it includes inappropriate words... |
| 1.1.5.1 | Registered users shall be able to view the available badge that they receive... |
| 1.1.5.2 | Registered users shall be able to take badges from the forum activities automatically. |
| 1.1.5.3 | Users shall submit feedback, suggest improvements... |
| 1.2.3.2 | The system shall assign achievement badges when users reach predefined milestones... |
| 1.2.3.3 | The system shall provide a badge catalog where each badge is described. |
| 1.2.3.4 | The system shall assign achievement badges when users are in the first three places... |
| 1.2.4.2 | The system shall send a notification to people for the update of the leaderboard situation. |
| 1.2.5.2 | The system shall include tagging and categorization features... |
| 2.4.3 | The platform shall support at least one screen reader... |
| 2.4.4 | The platform shall support text resizing up to 200%... |
| 2.5.1 | The platform shall prioritize hosting providers with certified renewable energy usage... |
The deployed URL: https://waste-less.alibartukonca.org
Build instructions are here

WasteLess App
- Customer Milestone 1 Report of CMPE 451 Fall 2025
- Customer Milestone 2 Report of CMPE 451 Fall 2025
- Customer Milestone 3 Report of CMPE 451 Fall 2025
- Meeting 1 (Lab-1) - (23.09.2025)
- Meeting 2 (Zoom) - (25.09.2025)
- Meeting 3 (Lab-2) - (30.09.2025)
- Meeting 4 (Zoom) - (02.10.2025)
- Customer Meeting 1 - (06.10.2025)
- Meeting 5 (Lab-3) - (07.10.2025)
- Meeting 6 (Zoom) - (09.10.2025)
- Meeting 7 (Lab-4) - (14.10.2025)
- Meeting 8 (Zoom) - (16.10.2025)
- Meeting 9 (Zoom) - (22.10.2025)
- Meeting 10 (Zoom) - (30.10.2025)
- Meeting 11 (Lab-5) - (05.11.2025)
- Meeting 12 (Zoom) - (6.11.2025)
- Meeting 13 (Lab-6) - (11.11.2025)
- Meeting 14 (Zoom) - (13.11.2025)
- Meeting 15 (Lab-7) - (18.11.2025)
- Meeting 16 (Zoom) - (20.11.2025)
- Meeting 17 (Zoom) - (26.11.2025)
- Meeting 19 (Zoom) - (11.12.2025)
- Meeting 20 (Zoom) - (17.12.2025)
🛠️ Backend Meeting Notes
💻 Frontend Meeting Notes
📱 Mobile Meeting Notes
- Lab 1 Report
- Lab 2 Report
- Lab 3 Report
- Lab 4 Report
- Lab 5 Report
- Lab 5 MVP Report
- Lab 6 Report
- Lab 7 Report
- Lab 7 M2 Demo Preparation Report
- Lab 8 Report
- Lab 8 Requirements Review & Acceptance Planning
- Lab 9 Report
- Lab 9 M3 Demo Preparation Report
- Requirements
- Elicitation Questions
- Use Case Diagrams
- Class UML Diagram
- Sequence Diagrams
- Demo Scenario - MS1
- Demo Sceanrio - MVP
- Demo Sceanrio - MS3
Abdurrahman Arslan
Abdülkerim Kasar
Ali Bartu Konca
Arda Yalçındağ
Cengiz Bilal Sarı
Emre Kılıç
Osman Yusuf Tosun
Serdar Bahar
Yusuf Onur Öksüz
Yüksel Eren Şen
⌛ 352 Sidebar
🏠 Home
📌 Team Members and Contributions
- Meeting 1 - (14.02.2025)
- Meeting 2 - (20.02.2025)
- Meeting 3 - (27.02.2025)
- Customer Meeting 1 - (03.03.2025)
- Meeting 5 - (06.03.2025)
- Meeting 6 - (11.03.2025)
- Meeting 7 - (13.03.2025)
- Meeting 8 - (16.03.2025)
- Meeting 9 - (20.03.2025)
- Meeting 10 - (24.03.2025)
- Meeting 11 - (10.04.2025)
- Meeting 12 - (16.04.2025)
- Meeting 13 - (22.04.2025)
- Meeting 14 - (28.04.2025)
- Meeting 15 - (03.05.2025)
- Meeting 16 - (05.05.2025)
- Meeting 17 - (09.05.2025)
- Meeting 18 - (11.05.2025)