Skip to content

chore(deps-dev): bump semantic-release-teams-notify-plugin from 8ebf00a to e9946bc #164

chore(deps-dev): bump semantic-release-teams-notify-plugin from 8ebf00a to e9946bc

chore(deps-dev): bump semantic-release-teams-notify-plugin from 8ebf00a to e9946bc #164

Triggered via pull request September 12, 2025 10:06
Status Failure
Total duration 1m 59s
Artifacts

test.yml

on: pull_request
Matrix: tests / 🧪 Testing
tests  /  ...  /  Auto-merge Dependabot PR
5s
tests / dependabot / Auto-merge Dependabot PR
Fit to window
Zoom out
Zoom in

Annotations

9 errors
tests / 🧪 Testing (3.12)
Process completed with exit code 1.
tests / 🧪 Testing (3.11)
The operation was canceled.
tests / 🧪 Testing (3.11)
The strategy configuration was canceled because "tests.test_matrix._3_12" failed
tests / 🧪 Testing (3.10)
The operation was canceled.
tests / 🧪 Testing (3.10)
The strategy configuration was canceled because "tests.test_matrix._3_12" failed
tests / 🧪 Testing (3.13)
The operation was canceled.
tests / 🧪 Testing (3.13)
The strategy configuration was canceled because "tests.test_matrix._3_12" failed
tests / 🧪 Testing (3.9)
The operation was canceled.
tests / 🧪 Testing (3.9)
The strategy configuration was canceled because "tests.test_matrix._3_12" failed