Skip to content

Pull requests: cert-manager/istio-csr

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Assigned to nobody Loading
Sort

Pull requests list

Bump the all group across 1 directory with 12 updates dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. dependencies Pull requests that update a dependency file go Pull requests that update Go code needs-ok-to-test Indicates a PR that requires an org member to verify it is safe to test. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#583 opened Aug 7, 2025 by dependabot bot Loading…
fix: make handling of additionalAnnotations more robust dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. needs-ok-to-test Indicates a PR that requires an org member to verify it is safe to test. size/XS Denotes a PR that changes 0-9 lines, ignoring generated files.
#537 opened Apr 24, 2025 by jrhoward Loading…
Add PodDisruptionBudget to helm chart dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. needs-ok-to-test Indicates a PR that requires an org member to verify it is safe to test. size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#517 opened Mar 13, 2025 by frauniki Loading…
Add app.server.certificateDuration dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. needs-ok-to-test Indicates a PR that requires an org member to verify it is safe to test. size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#469 opened Dec 20, 2024 by volkorny Loading…
ProTip! Filter pull requests by the default branch with base:main.