Skip to content

Conversation

@pull
Copy link

@pull pull bot commented Sep 9, 2025

See Commits and Changes for more details.


Created by pull[bot] (v2.0.0-alpha.3)

Can you help keep this open source service alive? 💖 Please sponsor : )

stylessh and others added 3 commits September 9, 2025 13:48
* Refactor Drawer component and add date-fns dependency

Refactored the Drawer component for improved slot-based structure, updated styles, and added 'use client' directive. Added 'date-fns' as a dependency in design-system, updated tsconfig paths for icons, and marked ToggleGroup as a client component.

* nit: add env for svg path

* fix: instructions

* add-ons design

* chore: new generated llms

* Rebuild the pnpm-lock file.

* fix: update vaul dep in ui for drawer

* chore: update radix dialog deps

* fix: clipPath prop on chart tooltip svg

* fix: update dialog deps

* fix: update hover card deps

* fix: remove legacy next link from nav menu docs

* fix: radio group dep update

* fix: scroll area example key

* fix: sheet form readOnly

* fix: slider dep update

* fix: hide empty toast view

* fix: toggle and toggle group dep update

* Rebuild the lockfile.

* chore: updating branch

* fix: remove unused prop in docs

Removes unused prop on Drawer component inside docs causing type error

* filtering refactor

filter refactor

more

* styling

* use popovers instead

* refactor and fine tune

* remove code

* fix portal popover dismissing

* custom component popover

* tests fix

* fix ts

* rm unrelated changes

* fix type error - remove type cast

* undo previewfilterpanel

* fix type

---------

Co-authored-by: Jonathan Summers-Muir <[email protected]>
Co-authored-by: Danny White <[email protected]>
Co-authored-by: kemal <[email protected]>
Co-authored-by: Ivan Vasilov <[email protected]>
Co-authored-by: Jordi Enric <[email protected]>
@pull pull bot locked and limited conversation to collaborators Sep 9, 2025
@pull pull bot added the ⤵️ pull label Sep 9, 2025
@pull pull bot had a problem deploying to Studio E2E Tests September 9, 2025 22:13 Failure
@pull pull bot merged commit e059ad9 into code:master Sep 9, 2025
@pull pull bot had a problem deploying to Studio E2E Tests September 9, 2025 22:13 Error
Sign up for free to subscribe to this conversation on GitHub. Already have an account? Sign in.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants