SAJ inverter wiki page

Types of compatible SAJ inverters

H2 Hybrid

  • 3~6K-S2 Ver.
  • 5~10K-S3 Ver.
  • 5~10K-T2 Ver.
  • 15~20K-T2 Ver.

SAJ H2-10K-T2 was the first SAJ inverter to be successfully used with Battery-Emulator

SAJ H2-8K-T2 hybrid inverter also used with Battery Emulator

  • Module Firmware : V1.214 (upgraded by SAJ to allow Modbus)
  • Display Board : V2.231 (upgraded by SAJ to allow AI mode)
  • Control Board : V4.139

Inverter protocol

The SAJ inverter uses the Pylon CAN protocol (Pylon-SC0500)

Settings on the Battery Emulator side

#define PYLON_CAN

For >255Ah batteries, the latest version contains a bugfix for the 732x frames to the inverter

Specific settings are not needed regarding geometry of the battery

For a 72-cell battery 280Ah LFP battery, this works for me

  • TOTAL_CELL_AMOUNT = 72;
  • MODULES_IN_SERIES = 4;
  • CELLS_PER_MODULE = 18;
  • VOLTAGE_LEVEL = 230;
  • AH_CAPACITY = 280;

This is the can_config part for the inverter

  • .inverter = CAN_ADDON_MCP2515,

The battery shows up in the Elekeeper APP with the following parameters as reported by the Battery Emulator

  • Design Capacity
  • Actual Ah Remaining Capacity
  • Actual % Remaining Capacity
  • (Dis)charge Power
  • Temperature
  • Number of Modules

When going deeper into the Elekeeper APP (change battery settings) via BT or cloud

  • Zero voltage displayed for the 4 modules
  • Modules appear as 16 cell instead of declared 18 cell
  • The inverter only looks at low and high SOC% disconnect values implement on inverter side, no effect by changing the battery threshold settings on webinterface of BE

WIP on the mapping of the battery modules towards the Pylon modules.