Skip to content

HTTP-155 add all java versions and up parent pom level #24

HTTP-155 add all java versions and up parent pom level

HTTP-155 add all java versions and up parent pom level #24

Triggered via push August 28, 2025 17:07
Status Failure
Total duration 9m 22s
Artifacts

push_pr.yml

on: push
Matrix: compile_and_test
Fit to window
Zoom out
Zoom in

Annotations

7 errors and 3 warnings
compile_and_test (1.20.1, 21) / compile_and_test (21)
Process completed with exit code 1.
compile_and_test (1.20.1, 17) / compile_and_test (17)
The operation was canceled.
compile_and_test (1.20.1, 17) / compile_and_test (17)
The strategy configuration was canceled because "compile_and_test._1_20_1_21" failed
Flink Connector HTTP CI
The strategy configuration was canceled because "compile_and_test._1_20_1_21" failed
Flink Connector HTTP CI
The strategy configuration was canceled because "compile_and_test._1_20_1_21" failed
compile_and_test (1.20.1, 11) / compile_and_test (11)
The operation was canceled.
compile_and_test (1.20.1, 11) / compile_and_test (11)
The strategy configuration was canceled because "compile_and_test._1_20_1_21" failed
compile_and_test (1.20.1, 21) / compile_and_test (21)
Cache save failed.
compile_and_test (1.20.1, 17) / compile_and_test (17)
Cache save failed.
compile_and_test (1.20.1, 11) / compile_and_test (11)
Cache save failed.