Skip to content

fix(deps): update module gocloud.dev to v0.43.0 #124

fix(deps): update module gocloud.dev to v0.43.0

fix(deps): update module gocloud.dev to v0.43.0 #124

Triggered via pull request June 6, 2025 06:22
Status Failure
Total duration 21s
Artifacts

test.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

9 errors
test (12)
Process completed with exit code 2.
test (11)
Process completed with exit code 2.
test (11)
The strategy configuration was canceled because "test._12" failed
test (13)
Process completed with exit code 2.
test (13)
The strategy configuration was canceled because "test._12" failed
test (15)
The operation was canceled.
test (15)
The strategy configuration was canceled because "test._12" failed
test (14)
The operation was canceled.
test (14)
The strategy configuration was canceled because "test._12" failed