V2.4.0 #254
Merged
V2.4.0 #254
Jenkins - GLSP / CI Jenkins Build
succeeded
Apr 6, 2025 in 4m 21s
Success
Details
- Declarative: Checkout SCM (5.2 sec)
- Declarative: Tool Install (1.1 sec)
- Build: Eclipse-based (P2) (1 min 59 sec)
- Build: Plain Maven (M2) (46 sec)
- Build: fatjar (32 sec)
- Checkstyle (11 sec)
- Tests (26 sec)
- Deploy (master only) (5.5 sec)
- Deploy P2 (1 sec)
- Deploy M2 (0.66 sec)
- Trigger Java21 build (0.73 sec)
- Declarative: Post Actions (8.9 sec)
- Declarative: Tool Install (1.1 sec)
Loading