-
Notifications
You must be signed in to change notification settings - Fork 540
[7.17] (backport #19558) deps: Bump ironbank version to 9.7 #19588
New issue
Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.
By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.
Already on GitHub? Sign in to your account
Conversation
* chore: deps(ironbank): Bump ubi version to 9.7 Made with ❤️️ by updatecli * chore: deps(ironbank): Bump ubi version to 9.7 Made with ❤️️ by updatecli * Apply suggestions from code review --------- Co-authored-by: elastic-observability-automation[bot] <180520183+elastic-observability-automation[bot]@users.noreply.github.com> Co-authored-by: Victor Martinez <[email protected]> (cherry picked from commit 154b806) # Conflicts: # packaging/ironbank/hardening_manifest.yaml
|
Cherry-pick of 154b806 has failed: To fix up this pull request, you can check it out locally. See documentation: https://docs.github.com/en/pull-requests/collaborating-with-pull-requests/reviewing-changes-in-pull-requests/checking-out-pull-requests-locally |
🤖 GitHub commentsJust comment with:
|
|
This pull request has not been merged yet. Could you please review and merge it @? 🙏 |
Merge Queue Status
🚫 The pull request has left the queue (rule: This pull request spent 21 hours 47 minutes 22 seconds in the queue, with no time waiting for CI. Required conditions to merge
ReasonThe pull request #19588 has been manually updated HintIf you want to requeue this pull request, you can post a |
Merge Queue Status
🚫 The pull request has left the queue (rule: This pull request spent 5 hours 9 minutes 31 seconds in the queue, with no time waiting for CI. Required conditions to merge
ReasonThe pull request #19588 has been manually updated HintIf you want to requeue this pull request, you can post a |
Merge Queue Status
✅ The pull request has been merged This pull request spent 3 days 3 hours 10 minutes 6 seconds in the queue, including 14 minutes 27 seconds waiting for CI. Required conditions to merge
|
💚 Build Succeeded
History
|
🟠 The pull request is queued to be mergedBranch 7.17 (0ce50fe) and #19588 are embarked together for merge. Required conditions of queue
Required conditions to stay in the queue:
|
|
#19755 should unblock this PR |
deps: Bump ironbank version
deps(ironbank): Bump ubi version to 9.7
changed lines [7] of file "/tmp/updatecli/github/elastic/apm-server/packaging/ironbank/Dockerfile"
deps(ironbank): Bump ubi version to 9.7
change detected: * key "$.args.BASE_TAG" updated from "\"9.6\"" to "\"9.7\"", in file "packaging/ironbank/hardening_manifest.yaml"
Created automatically by Updatecli
Options:
Most of Updatecli configuration is done via its manifest(s).
Feel free to report any issues at github.com/updatecli/updatecli.
If you find this tool useful, do not hesitate to star our GitHub repository as a sign of appreciation, and/or to tell us directly on our chat!
This is an automatic backport of pull request #19558 done by [Mergify](https://mergify.com).