Skip to content
Merged
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
15 changes: 13 additions & 2 deletions docs/advanced-entity-analytics/entity-risk-scoring.asciidoc
Original file line number Diff line number Diff line change
Expand Up @@ -32,9 +32,9 @@ NOTE: Entities without any alerts, or with only `Closed` alerts, are not assigne

[discrete]
[[how-is-risk-score-calculated]]
== How is risk score calculated?
== How are risk scores calculated?

. The risk scoring engine runs hourly to aggregate `Open` and `Acknowledged` alerts from the last 30 days. For each entity, the engine processes up to 10,000 alerts.
. The risk scoring engine runs hourly to aggregate `Open` and `Acknowledged` alerts from the last 30 days, including <<building-block-rule, building block alerts>>. For each entity, the engine processes up to 10,000 alerts.
+
NOTE: When <<turn-on-risk-engine, turning on the risk engine>>, you can choose to also include `Closed` alerts in risk scoring calculations.

Expand Down Expand Up @@ -71,6 +71,17 @@ NOTE: Asset criticality levels and default risk weights are subject to change.

The risk score is updated every hour based on the configured date and time range, which defaults to 30 days. Each update generates a new score, calculated independently of any previous scores.

[discrete]
[[residual-risk]]
=== Residual risk score

In some cases, entities can retain a residual risk score:

* If all alerts for an entity are closed
* If all of the entity's open alerts fall outside of the configured date and time range

In these situations, the entity retains its last computed risk score until a new alert causes the score to be recalculated.

.Click for a risk score calculation example
[%collapsible]
====
Expand Down