Skip to content
This repository was archived by the owner on Oct 3, 2025. It is now read-only.

Rust CI

Rust CI #269

Triggered via schedule September 29, 2024 01:19
Status Success
Total duration 7m 28s
Artifacts 1
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

test.yaml

on: schedule
Matrix: run-tests
Fit to window
Zoom out
Zoom in

Annotations

4 warnings
Run tests on Linux x86 (nightly)
Failed to download action 'https://api.github.com/repos/actions-rust-lang/setup-rust-toolchain/tarball/4d1965c9142484e48d40c19de54b5cba84953a06'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
Run tests on Linux x86 (nightly)
Back off 11.347 seconds before retry.
Run tests on Linux x86 (nightly)
Failed to download action 'https://api.github.com/repos/actions-rust-lang/setup-rust-toolchain/tarball/4d1965c9142484e48d40c19de54b5cba84953a06'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
Run tests on Linux x86 (nightly)
Back off 14.543 seconds before retry.

Artifacts

Produced during runtime
Name Size Digest
wasm Expired
968 KB
sha256:b85b33aa5d2e2fe71e116f2ff1531b662a5148f00f85eea51e2e7866f4a6a5e7