Skip to content

Conversation

@Zettat123
Copy link
Contributor

Fix #34472

Add integration tests for actions schedule update.

@GiteaBot GiteaBot added the lgtm/need 2 This PR needs two approvals by maintainers to be considered for merging. label Oct 29, 2025
@github-actions github-actions bot added the modifies/go Pull requests that update Go code label Oct 29, 2025
@GiteaBot GiteaBot added lgtm/need 1 This PR needs approval from one additional maintainer to be merged. and removed lgtm/need 2 This PR needs two approvals by maintainers to be considered for merging. labels Oct 29, 2025
@GiteaBot GiteaBot added lgtm/done This PR has enough approvals to get merged. There are no important open reservations anymore. and removed lgtm/need 1 This PR needs approval from one additional maintainer to be merged. labels Oct 29, 2025
@wxiaoguang wxiaoguang enabled auto-merge (squash) October 29, 2025 15:35
@wxiaoguang wxiaoguang merged commit 8aa1179 into go-gitea:main Oct 29, 2025
26 checks passed
@GiteaBot GiteaBot added this to the 1.26.0 milestone Oct 29, 2025
GiteaBot pushed a commit to GiteaBot/gitea that referenced this pull request Oct 29, 2025
Fix go-gitea#34472

Add integration tests for actions schedule update.
@GiteaBot GiteaBot added the backport/done All backports for this PR have been created label Oct 29, 2025
silverwind pushed a commit that referenced this pull request Oct 29, 2025
Backport #35767 by @Zettat123

Fix #34472

Add integration tests for actions schedule update.

---------

Co-authored-by: Zettat123 <[email protected]>
Co-authored-by: wxiaoguang <[email protected]>
mithileshgupta12 pushed a commit to mithileshgupta12/gitea that referenced this pull request Oct 30, 2025
Fix go-gitea#34472

Add integration tests for actions schedule update.
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

backport/done All backports for this PR have been created backport/v1.25 lgtm/done This PR has enough approvals to get merged. There are no important open reservations anymore. modifies/go Pull requests that update Go code type/bug

Projects

None yet

Development

Successfully merging this pull request may close these issues.

Action schedule

5 participants