Skip to content

chore(deps): lock file maintenance #2572

chore(deps): lock file maintenance

chore(deps): lock file maintenance #2572

Triggered via pull request August 7, 2025 00:50
Status Failure
Total duration 1m 10s
Artifacts

ci.yml

on: pull_request
Matrix: node
Fit to window
Zoom out
Zoom in

Annotations

5 errors
node v22
Process completed with exit code 1.
node v20
The operation was canceled.
node v20
The strategy configuration was canceled because "node._22" failed
node v18
The operation was canceled.
node v18
The strategy configuration was canceled because "node._22" failed