Skip to content

chore(deps): lock file maintenance #2613

chore(deps): lock file maintenance

chore(deps): lock file maintenance #2613

Triggered via pull request August 19, 2025 15:36
Status Failure
Total duration 1m 17s
Artifacts

ci.yml

on: pull_request
Matrix: node
Fit to window
Zoom out
Zoom in

Annotations

5 errors
node v22
Process completed with exit code 1.
node v18
The operation was canceled.
node v18
The strategy configuration was canceled because "node._22" failed
node v20
The operation was canceled.
node v20
The strategy configuration was canceled because "node._22" failed