Skip to content

ci: optimize ci setup #10217

ci: optimize ci setup

ci: optimize ci setup #10217

Triggered via pull request August 22, 2025 16:31
@fubhyfubhy
synchronize #6124
optimize-ci
Status Cancelled
Total duration 6m 18s
Artifacts

ci.yml

on: pull_request
Run unit tests
6m 10s
Run unit tests
Subgraph Runner integration tests
4m 33s
Subgraph Runner integration tests
Run integration tests
4m 57s
Run integration tests
Check rustfmt style
16s
Check rustfmt style
Build in release mode
1m 12s
Build in release mode
Fit to window
Zoom out
Zoom in

Annotations

3 errors and 5 warnings
Run unit tests
The operation was canceled.
Run unit tests
Canceling since a higher priority waiting request for Continuous Integration-refs/pull/6124/merge exists
Continuous Integration
Canceling since a higher priority waiting request for Continuous Integration-refs/pull/6124/merge exists
Subgraph Runner integration tests
Failed to save: Unable to reserve cache with key cargo-install-cargo-nextest-0.9.102-2b6427d903bf9aef397c3020, another job may be creating this cache.
Subgraph Runner integration tests
Cache not found for keys: v0-rust-runner-tests-Linux-x64-11389504-b94d3553, v0-rust-runner-tests-Linux-x64-11389504
Run integration tests
Failed to save: Unable to reserve cache with key cargo-install-cargo-nextest-0.9.102-2b6427d903bf9aef397c3020, another job may be creating this cache.
Run integration tests
Cache not found for keys: v0-rust-integration-tests-Linux-x64-53edfe6a-b94d3553, v0-rust-integration-tests-Linux-x64-53edfe6a
Run unit tests
Cache not found for keys: v0-rust-unit-tests-Linux-x64-53edfe6a-b94d3553, v0-rust-unit-tests-Linux-x64-53edfe6a