Skip to content

Fix broken pipe during test and gracefully exit the server #13612

Fix broken pipe during test and gracefully exit the server

Fix broken pipe during test and gracefully exit the server #13612

Status Cancelled
Total duration 1m 7s
Artifacts

nix.yml

on: pull_request
pre_job
8s
pre_job
Matrix: develop
nix_post_job
3s
nix_post_job
Fit to window
Zoom out
Zoom in

Annotations

4 errors
develop (ubuntu-latest)
The operation was canceled.
develop (ubuntu-latest)
Canceling since a higher priority waiting request for 1875-tests-randomly-fail-with-exception-fd111-hputbuf-resource-vanished-broken-pipe---test-option-j1-workaround-Nix exists
nix_post_job
Process completed with exit code 1.
Nix
Canceling since a higher priority waiting request for 1875-tests-randomly-fail-with-exception-fd111-hputbuf-resource-vanished-broken-pipe---test-option-j1-workaround-Nix exists