Skip to content

Fix broken pipe during test and gracefully exit the server #7531

Fix broken pipe during test and gracefully exit the server

Fix broken pipe during test and gracefully exit the server #7531

Status Failure
Total duration 1m 10s
Artifacts

flags.yml

on: pull_request
pre_job
9s
pre_job
Matrix: flags
flags_post_job
3s
flags_post_job
Fit to window
Zoom out
Zoom in

Annotations

8 errors
flags (9.10, ubuntu-latest)
Process completed with exit code 1.
flags (9.8, ubuntu-latest)
The operation was canceled.
flags (9.8, ubuntu-latest)
The strategy configuration was canceled because "flags._9_10_ubuntu-latest" failed
flags (9.6, ubuntu-latest)
The operation was canceled.
flags (9.6, ubuntu-latest)
The strategy configuration was canceled because "flags._9_10_ubuntu-latest" failed
flags (9.12, ubuntu-latest)
The operation was canceled.
flags (9.12, ubuntu-latest)
The strategy configuration was canceled because "flags._9_10_ubuntu-latest" failed
flags_post_job
Process completed with exit code 1.