feat(github-actions): add inactivity bot phase 2 (stale PR detection) #989
DCO-2 / DCO
succeeded
Dec 8, 2025 in 1s
Check passed!
All commits are signed off, the check passed.
Summary
| Sha | Message | Pass or fail reason | |
|---|---|---|---|
| 🟢 | 7d15228 | chore: test PR for inactivity phase 2 | Valid sign-off found |
| 🟢 | 5912895 | Set DAYS to 0 for unassigning stale PRs | Valid sign-off found |
| 🟢 | 9c921c7 | Change DAYS from 21 to 0 in unassign workflow | Valid sign-off found |
| 🟢 | 1e2d911 | feat: add inactivity bot phase 2 (stale PR detecti... | Valid sign-off found |
| 🟢 | 2964a1a | Delete test-phase2.txt | Valid sign-off found |
| 🟢 | 59af4a3 | Merge branch 'main' into phase2-final | Skipped: sign-off not required in merge commit |
| 🟢 | 121dc2f | Merge branch 'main' into phase2-final | Skipped: sign-off not required in merge commit |
| 🟢 | 2261c14 | Merge branch 'main' into phase2-final | Skipped: sign-off not required in merge commit |
| 🟢 | 3f03d19 | fix: improve latest commit detection via timestamp... | Valid sign-off found |
| 🟢 | 8f593fd | fix: align Phase 2 inactivity bot with paginated l... | Valid sign-off found |
| 🟢 | eec3f26 | Merge branch 'main' into phase2-final | Skipped: sign-off not required in merge commit |
| 🟢 | e4daf9f | Update CHANGELOG.md | Valid sign-off found |
| 🟢 | 6933b02 | Update CHANGELOG with recent changes and additions | Valid sign-off found |
| 🟢 | cbc5691 | chore: remove duplicate Phase 2 workflow | Valid sign-off found |
| 🟢 | c4632e2 | Merge branch 'main' into phase2-final | Skipped: sign-off not required in merge commit |
Loading