Skip to content

Trim trailing whitespace parsing cabal.project (#2254) #2651

Trim trailing whitespace parsing cabal.project (#2254)

Trim trailing whitespace parsing cabal.project (#2254) #2651

Triggered via push October 6, 2024 23:51
Status Failure
Total duration 40m 54s
Artifacts
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

pipeline.yml

on: push
nix-build
19m 12s
nix-build
unit-tests
18s
unit-tests
runghc
2m 12s
runghc
cabal
29s
cabal
cabal-doExactConfig
2m 26s
cabal-doExactConfig
tests-benchmarks
12s
tests-benchmarks
multi-target
1m 20s
multi-target
shellFor-single-package
39s
shellFor-single-package
shellFor-multiple-package
13s
shellFor-multiple-package
shellFor-hoogle
7s
shellFor-hoogle
shellFor-not-depends
11s
shellFor-not-depends
maintainer-scripts
7s
maintainer-scripts
plan-extra-hackages
6s
plan-extra-hackages
build-extra-hackages
37s
build-extra-hackages
hix
39s
hix
docs
1m 56s
docs
hydra-ifdLevel-0-and-1
4m 17s
hydra-ifdLevel-0-and-1
hydra-ifdLevel-2
6m 47s
hydra-ifdLevel-2
hydra-ifdLevel-3
30m 10s
hydra-ifdLevel-3
closure-size
3s
closure-size
update-docs
4s
update-docs
check-materialization-concurrency
23s
check-materialization-concurrency
check-path-support
17s
check-path-support
haskell-nix-roots-do-not-require-IFDs
12s
haskell-nix-roots-do-not-require-IFDs
hydra-without-remote-builders-ghc8107
3m 2s
hydra-without-remote-builders-ghc8107
hydra-without-remote-builders-ghc9101
2m 18s
hydra-without-remote-builders-ghc9101
hix-cabal
15s
hix-cabal
nix-tools
13s
nix-tools
Fit to window
Zoom out
Zoom in

Annotations

2 errors
hydra-ifdLevel-3
The job running on runner linux-7-1 has exceeded the maximum execution time of 30 minutes.
hydra-ifdLevel-3
The operation was canceled.