Skip to content

Add GHC 9.12.2 (#2331) #2995

Add GHC 9.12.2 (#2331)

Add GHC 9.12.2 (#2331) #2995

Triggered via push March 17, 2025 23:38
Status Failure
Total duration 31m 44s
Artifacts

pipeline.yml

on: push
nix-build
35s
nix-build
unit-tests
58s
unit-tests
runghc
11s
runghc
cabal
5m 15s
cabal
cabal-doExactConfig
12s
cabal-doExactConfig
tests-benchmarks
7s
tests-benchmarks
multi-target
34s
multi-target
shellFor-single-package
6m 22s
shellFor-single-package
shellFor-multiple-package
18s
shellFor-multiple-package
shellFor-hoogle
13s
shellFor-hoogle
shellFor-not-depends
14s
shellFor-not-depends
maintainer-scripts
7s
maintainer-scripts
plan-extra-hackages
5s
plan-extra-hackages
build-extra-hackages
1m 26s
build-extra-hackages
hix
28s
hix
docs
16m 54s
docs
hydra-ifdLevel-0-and-1
10m 58s
hydra-ifdLevel-0-and-1
hydra-ifdLevel-2
17m 11s
hydra-ifdLevel-2
hydra-ifdLevel-3
30m 15s
hydra-ifdLevel-3
closure-size
3s
closure-size
update-docs
10s
update-docs
check-materialization-concurrency
18s
check-materialization-concurrency
check-path-support
6s
check-path-support
haskell-nix-roots-do-not-require-IFDs
14s
haskell-nix-roots-do-not-require-IFDs
hydra-without-remote-builders-ghc966
10s
hydra-without-remote-builders-ghc966
hydra-without-remote-builders-ghc9101
6m 16s
hydra-without-remote-builders-ghc9101
hix-cabal
7m 16s
hix-cabal
nix-tools
32s
nix-tools
Fit to window
Zoom out
Zoom in

Annotations

2 errors
hydra-ifdLevel-3
The job running on runner linux-5-3 has exceeded the maximum execution time of 30 minutes.
hydra-ifdLevel-3
The operation was canceled.