Remove overlay/ghc.nix (#2340) #3012
pipeline.yml
on: push
nix-build
2m 39s
unit-tests
4s
runghc
52s
cabal
9s
cabal-doExactConfig
54s
tests-benchmarks
10s
multi-target
1m 23s
shellFor-single-package
19s
shellFor-multiple-package
44s
shellFor-hoogle
55s
shellFor-not-depends
17s
maintainer-scripts
7s
plan-extra-hackages
55s
build-extra-hackages
6s
hix
26s
docs
37m 57s
hydra-ifdLevel-0-and-1
4m 27s
hydra-ifdLevel-2
11m 55s
hydra-ifdLevel-3
30m 8s
closure-size
2s
update-docs
5s
check-materialization-concurrency
20s
check-path-support
10s
haskell-nix-roots-do-not-require-IFDs
1m 9s
hydra-without-remote-builders-ghc966
1m 3s
hydra-without-remote-builders-ghc9101
3m 47s
hix-cabal
12s
nix-tools
2m 52s
Annotations
3 errors and 1 warning
|
nix-tools
Process completed with exit code 1.
|
|
hydra-ifdLevel-3
The job running on runner linux-7-1 has exceeded the maximum execution time of 30 minutes.
|
|
hydra-ifdLevel-3
The operation was canceled.
|
|
nix-tools
This job failure may be caused by using an out of date self-hosted runner. You are currently using runner version 2.322.0. Please update to the latest version 2.323.0
|