Skip to content

Build hadrian with ghc 9.6.6 if available. (#2342) #3031

Build hadrian with ghc 9.6.6 if available. (#2342)

Build hadrian with ghc 9.6.6 if available. (#2342) #3031

Triggered via push March 31, 2025 00:21
Status Failure
Total duration 31m 14s
Artifacts

pipeline.yml

on: push
nix-build
5m 16s
nix-build
unit-tests
9s
unit-tests
runghc
9s
runghc
cabal
43s
cabal
cabal-doExactConfig
44s
cabal-doExactConfig
tests-benchmarks
38s
tests-benchmarks
multi-target
1m 10s
multi-target
shellFor-single-package
3m 3s
shellFor-single-package
shellFor-multiple-package
23s
shellFor-multiple-package
shellFor-hoogle
49s
shellFor-hoogle
shellFor-not-depends
57s
shellFor-not-depends
maintainer-scripts
9s
maintainer-scripts
plan-extra-hackages
29s
plan-extra-hackages
build-extra-hackages
46s
build-extra-hackages
hix
4m 0s
hix
docs
10m 41s
docs
hydra-ifdLevel-0-and-1
7m 54s
hydra-ifdLevel-0-and-1
hydra-ifdLevel-2
20m 15s
hydra-ifdLevel-2
hydra-ifdLevel-3
30m 15s
hydra-ifdLevel-3
closure-size
6s
closure-size
update-docs
5s
update-docs
check-materialization-concurrency
20s
check-materialization-concurrency
check-path-support
36s
check-path-support
haskell-nix-roots-do-not-require-IFDs
1m 48s
haskell-nix-roots-do-not-require-IFDs
hydra-without-remote-builders-ghc966
3m 4s
hydra-without-remote-builders-ghc966
hydra-without-remote-builders-ghc9101
3m 55s
hydra-without-remote-builders-ghc9101
hix-cabal
4m 57s
hix-cabal
nix-tools
1m 45s
nix-tools
Fit to window
Zoom out
Zoom in

Annotations

4 errors
hydra-ifdLevel-2
The job running on runner linux-5-4 has exceeded the maximum execution time of 20 minutes.
hydra-ifdLevel-2
The operation was canceled.
hydra-ifdLevel-3
The job running on runner linux-7-3 has exceeded the maximum execution time of 30 minutes.
hydra-ifdLevel-3
The operation was canceled.