Fix GHC 9.6 mingwW64 cross compile #3237
pipeline.yml
on: pull_request
nix-build
1m 38s
unit-tests
29s
runghc
58s
cabal
58s
cabal-doExactConfig
53s
tests-benchmarks
18s
multi-target
53s
shellFor-single-package
1m 5s
shellFor-multiple-package
12s
shellFor-hoogle
13s
shellFor-not-depends
14s
maintainer-scripts
12s
plan-extra-hackages
13s
build-extra-hackages
1m 8s
hix
1m 38s
docs
15m 56s
hydra-ifdLevel-0-and-1
6m 52s
hydra-ifdLevel-2
20m 19s
hydra-ifdLevel-3
30m 17s
closure-size
7s
update-docs
9s
check-materialization-concurrency
24s
check-path-support
16s
haskell-nix-roots-do-not-require-IFDs
1m 2s
hydra-without-remote-builders-ghc967
53s
hydra-without-remote-builders-ghc9102
40s
hix-cabal
3m 5s
check-nix-tools
2m 58s
Annotations
15 errors
multi-target
Process completed with exit code 1.
|
cabal-doExactConfig
Process completed with exit code 1.
|
cabal
Process completed with exit code 1.
|
runghc
Process completed with exit code 1.
|
shellFor-single-package
Process completed with exit code 1.
|
shellFor-multiple-package
Process completed with exit code 1.
|
shellFor-hoogle
Process completed with exit code 1.
|
shellFor-not-depends
Process completed with exit code 1.
|
nix-build
Process completed with exit code 1.
|
hydra-without-remote-builders-ghc9102
Process completed with exit code 1.
|
hydra-without-remote-builders-ghc967
Process completed with exit code 1.
|
hydra-ifdLevel-2
The operation was canceled.
|
hydra-ifdLevel-2
The job has exceeded the maximum execution time of 20m0s
|
hydra-ifdLevel-3
The operation was canceled.
|
hydra-ifdLevel-3
The job has exceeded the maximum execution time of 30m0s
|