Fix cross compilation TH in devShells #3287
pipeline.yml
on: pull_request
nix-build
4m 7s
unit-tests
12s
runghc
20s
cabal
21s
cabal-doExactConfig
25s
tests-benchmarks
22s
multi-target
22s
shellFor-single-package
1m 12s
shellFor-multiple-package
47s
shellFor-hoogle
19s
shellFor-not-depends
25s
maintainer-scripts
10s
plan-extra-hackages
21s
build-extra-hackages
15s
hix
5m 28s
docs
50m 2s
hydra-ifdLevel-0-and-1
4m 53s
hydra-ifdLevel-2
20m 19s
hydra-ifdLevel-3
30m 18s
closure-size
10s
update-docs
20s
check-materialization-concurrency
26s
check-path-support
14s
haskell-nix-roots-do-not-require-IFDs
19s
hydra-without-remote-builders-ghc967
8s
hydra-without-remote-builders-ghc9102
14s
hix-cabal
17s
check-nix-tools
23s
Annotations
11 errors
runghc
Process completed with exit code 1.
|
multi-target
Process completed with exit code 1.
|
shellFor-single-package
Process completed with exit code 1.
|
shellFor-hoogle
Process completed with exit code 1.
|
shellFor-not-depends
Process completed with exit code 1.
|
hydra-without-remote-builders-ghc9102
Process completed with exit code 1.
|
hydra-without-remote-builders-ghc967
Process completed with exit code 1.
|
hydra-ifdLevel-2
The operation was canceled.
|
hydra-ifdLevel-2
The job has exceeded the maximum execution time of 20m0s
|
hydra-ifdLevel-3
The operation was canceled.
|
hydra-ifdLevel-3
The job has exceeded the maximum execution time of 30m0s
|