Add stable-ghc-9.14 #3352

Add stable-ghc-9.14

Add stable-ghc-9.14 #3352

Triggered via pull request September 1, 2025 01:48
Status Failure
Total duration 34m 37s
Artifacts

pipeline.yml

on: pull_request
nix-build
19m 34s
nix-build
unit-tests
13s
unit-tests
runghc
15s
runghc
cabal
1m 42s
cabal
cabal-doExactConfig
1m 43s
cabal-doExactConfig
tests-benchmarks
1m 37s
tests-benchmarks
multi-target
3m 21s
multi-target
shellFor-single-package
3m 59s
shellFor-single-package
shellFor-multiple-package
2m 17s
shellFor-multiple-package
shellFor-hoogle
2m 54s
shellFor-hoogle
shellFor-not-depends
1m 32s
shellFor-not-depends
maintainer-scripts
14s
maintainer-scripts
plan-extra-hackages
1m 5s
plan-extra-hackages
build-extra-hackages
16s
build-extra-hackages
hix
1m 0s
hix
docs
4m 30s
docs
hydra-ifdLevel-0-and-1
7m 39s
hydra-ifdLevel-0-and-1
hydra-ifdLevel-2
20m 18s
hydra-ifdLevel-2
hydra-ifdLevel-3
30m 17s
hydra-ifdLevel-3
closure-size
10s
closure-size
update-docs
11s
update-docs
check-materialization-concurrency
24s
check-materialization-concurrency
check-path-support
24s
check-path-support
haskell-nix-roots-do-not-require-IFDs
40s
haskell-nix-roots-do-not-require-IFDs
hydra-without-remote-builders-ghc967
7m 46s
hydra-without-remote-builders-ghc967
hydra-without-remote-builders-ghc9102
8m 22s
hydra-without-remote-builders-ghc9102
hix-cabal
1m 42s
hix-cabal
check-nix-tools
2m 1s
check-nix-tools
Fit to window
Zoom out
Zoom in

Annotations

5 errors
hydra-ifdLevel-0-and-1
Process completed with exit code 1.
hydra-ifdLevel-2
The operation was canceled.
hydra-ifdLevel-2
The job has exceeded the maximum execution time of 20m0s
hydra-ifdLevel-3
The operation was canceled.
hydra-ifdLevel-3