Bump test/test_helper/bats-assert from b93143a to 035e99c
#378
acceptance-testing-e2e.yml
on: pull_request
build
6m 42s
Matrix: test-full-e2e
Matrix: test-sensor-e2e
Annotations
24 errors and 1 warning
|
test-full-e2e (ubuntu-latest, golang)
Process completed with exit code 2.
|
|
test-full-e2e (ubuntu-latest, ruby)
The operation was canceled.
|
|
test-full-e2e (ubuntu-latest, ruby)
The strategy configuration was canceled because "test-full-e2e.ubuntu-latest_golang" failed
|
|
test-full-e2e (ubuntu-latest, dotnet)
The operation was canceled.
|
|
test-full-e2e (ubuntu-latest, dotnet)
The strategy configuration was canceled because "test-full-e2e.ubuntu-latest_golang" failed
|
|
test-full-e2e (ubuntu-latest, distroless)
The operation was canceled.
|
|
test-full-e2e (ubuntu-latest, distroless)
The strategy configuration was canceled because "test-full-e2e.ubuntu-latest_golang" failed
|
|
test-full-e2e (ubuntu-latest, haskell)
The operation was canceled.
|
|
test-full-e2e (ubuntu-latest, haskell)
The strategy configuration was canceled because "test-full-e2e.ubuntu-latest_golang" failed
|
|
test-full-e2e (ubuntu-latest, image-edit)
The operation was canceled.
|
|
test-full-e2e (ubuntu-latest, image-edit)
The strategy configuration was canceled because "test-full-e2e.ubuntu-latest_golang" failed
|
|
test-full-e2e (ubuntu-latest, compose)
The operation was canceled.
|
|
test-full-e2e (ubuntu-latest, compose)
The strategy configuration was canceled because "test-full-e2e.ubuntu-latest_golang" failed
|
|
test-full-e2e (ubuntu-latest, python)
The operation was canceled.
|
|
test-full-e2e (ubuntu-latest, python)
The strategy configuration was canceled because "test-full-e2e.ubuntu-latest_golang" failed
|
|
test-full-e2e (ubuntu-latest, php)
The operation was canceled.
|
|
test-full-e2e (ubuntu-latest, php)
The strategy configuration was canceled because "test-full-e2e.ubuntu-latest_golang" failed
|
|
test-full-e2e (ubuntu-latest, http-probe)
The operation was canceled.
|
|
test-full-e2e (ubuntu-latest, http-probe)
The strategy configuration was canceled because "test-full-e2e.ubuntu-latest_golang" failed
|
|
test-full-e2e (ubuntu-latest, java)
The operation was canceled.
|
|
test-full-e2e (ubuntu-latest, java)
The strategy configuration was canceled because "test-full-e2e.ubuntu-latest_golang" failed
|
|
test-full-e2e (ubuntu-latest, node)
The operation was canceled.
|
|
test-full-e2e (ubuntu-latest, node)
The strategy configuration was canceled because "test-full-e2e.ubuntu-latest_golang" failed
|
|
test-sensor-e2e (ubuntu-latest)
Process completed with exit code 2.
|
|
test-sensor-e2e (ubuntu-latest)
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
|
Artifacts
Produced during runtime
| Name | Size | Digest | |
|---|---|---|---|
|
dist_linux
Expired
|
69.9 MB |
sha256:330d2eac445b6662a63d5fcac861dedfd367e5f48238407174434358bcff30c2
|
|
|
dist_linux_arm
Expired
|
65.4 MB |
sha256:d9e6d052a25bdfa716fb251cf07079783b64368f94524186a71eb5f0a6e6ed37
|
|
|
dist_linux_arm64
Expired
|
64 MB |
sha256:60504907248e258e734e1a90be184865fb4b1fd24f9e34f6b13fcbe3547501af
|
|
|
dist_mac
Expired
|
68.8 MB |
sha256:0d4dd1e185eadf518226457310d0b05d304c4e56df30aec4c6b9ada9e3a9a3e2
|
|