Skip to content

StreamableHttp - client refactoring and resumability support #729

StreamableHttp - client refactoring and resumability support

StreamableHttp - client refactoring and resumability support #729

Triggered via pull request May 2, 2025 08:36
Status Failure
Total duration 6h 0m 22s
Artifacts

pull-request-checks.yml

on: pull_request
Matrix: checks / test
Fit to window
Zoom out
Zoom in

Annotations

10 errors and 6 warnings
checks / format
Process completed with exit code 1.
checks / typecheck
Process completed with exit code 1.
checks / test (3.12)
The operation was canceled.
checks / test (3.12)
The job has exceeded the maximum execution time of 6h0m0s
checks / test (3.11)
The operation was canceled.
checks / test (3.11)
The job has exceeded the maximum execution time of 6h0m0s
checks / test (3.10)
The operation was canceled.
checks / test (3.10)
The job has exceeded the maximum execution time of 6h0m0s
checks / test (3.13)
The operation was canceled.
checks / test (3.13)
The job has exceeded the maximum execution time of 6h0m0s
checks / format
Failed to restore: Cache service responded with 422
checks / typecheck
Failed to restore: Cache service responded with 422
checks / test (3.12)
Failed to restore: Cache service responded with 422
checks / test (3.11)
Failed to restore: Cache service responded with 422
checks / test (3.10)
Failed to restore: Cache service responded with 422
checks / test (3.13)
Failed to restore: Cache service responded with 422