Migrate E2E tests from Cypress to Playwright #9743
Triggered via pull request
September 24, 2025 00:28
Status
Cancelled
Total duration
2m 0s
Artifacts
–
codeql-analysis.yml
on: pull_request
stop_previous
5s
Matrix: Analyze
Annotations
3 errors and 2 warnings
|
Analyze (javascript)
The operation was canceled.
|
|
Analyze (javascript)
Canceling since a higher priority waiting request for CodeQL-refs/pull/4383/merge exists
|
|
CodeQL
Canceling since a higher priority waiting request for CodeQL-refs/pull/4383/merge exists
|
|
Analyze (javascript)
Cannot create diff range extension pack for diff-informed queries; reverting to performing full analysis.
|
|
Analyze (javascript)
Cannot retrieve the full diff because there are too many (300) changed files in the pull request.
|