Skip to content

Bump alcaeus/automatic-merge-up-action from 1.0.0 to 1.0.1 (#1851) #2121

Bump alcaeus/automatic-merge-up-action from 1.0.0 to 1.0.1 (#1851)

Bump alcaeus/automatic-merge-up-action from 1.0.0 to 1.0.1 (#1851) #2121

Triggered via push July 24, 2025 11:10
Status Cancelled
Total duration 6h 3m 21s
Artifacts

tests.yml

on: push
Test PECL package
2m 51s
Test PECL package
System Library Tests
3m 33s
System Library Tests
Matrix: Windows Tests
Matrix: Tests
Fit to window
Zoom out
Zoom in

Annotations

10 errors
Windows Tests (8.1, x64, nts) / Run Tests
The operation was canceled.
Windows Tests (8.1, x64, nts) / Run Tests
The job has exceeded the maximum execution time of 6h0m0s
Windows Tests (8.2, x64, nts) / Run Tests
The operation was canceled.
Windows Tests (8.2, x64, nts) / Run Tests
The job has exceeded the maximum execution time of 6h0m0s
Windows Tests (8.3, x86, ts) / Run Tests
The operation was canceled.
Windows Tests (8.3, x86, ts) / Run Tests
The job has exceeded the maximum execution time of 6h0m0s
Windows Tests (8.2, x86, nts) / Run Tests
The operation was canceled.
Windows Tests (8.2, x86, nts) / Run Tests
The job has exceeded the maximum execution time of 6h0m0s
Windows Tests (8.2, x86, ts) / Run Tests
The operation was canceled.
Windows Tests (8.2, x86, ts) / Run Tests
The job has exceeded the maximum execution time of 6h0m0s