PYTHON-4324 CSOT avoid connection churn when operations timeout #7163
test-python.yml
on: pull_request
Install from SDist and Test
41s
Annotations
12 errors
Typing Tests (3.9)
Process completed with exit code 1.
|
Typing Tests (3.11)
The job was canceled because "_3_9" failed.
|
Typing Tests (3.11)
Process completed with exit code 1.
|
static
Process completed with exit code 1.
|
CPython 3.13t-ubuntu-latest
Canceling since a higher priority waiting request for 'tests-refs/pull/2269/merge' exists
|
CPython 3.13t-ubuntu-latest
The operation was canceled.
|
CPython 3.9-ubuntu-latest
Canceling since a higher priority waiting request for 'tests-refs/pull/2269/merge' exists
|
CPython 3.9-ubuntu-latest
The operation was canceled.
|
CPython pypy-3.10-ubuntu-latest
Canceling since a higher priority waiting request for 'tests-refs/pull/2269/merge' exists
|
CPython pypy-3.10-ubuntu-latest
The operation was canceled.
|
CPython 3.13-ubuntu-latest
Canceling since a higher priority waiting request for 'tests-refs/pull/2269/merge' exists
|
CPython 3.13-ubuntu-latest
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | Digest | |
---|---|---|---|
sdist
Expired
|
2.06 MB |
sha256:31b984a7579e9d5319b0ab067e29c015c2cecb7a158419fa5c3123f6f0c77ddb
|
|