Skip to content

Conversation

@jacobo-dominguez-wgu
Copy link
Contributor

@jacobo-dominguez-wgu jacobo-dominguez-wgu commented Oct 24, 2025

Description

Adding the course enrollment summary section.
Splitted the code in different components in order to enhance reusability, testability and readbility of the code.
I have used copilot to generate the unit tests, and I have supervised them to be correct and useful.

Note

There is a TODO pending to complete and it will be handled once the backend endpoint is ready
Also there is pending the point 4 of the acceptance criteria: to handle the permission rules

It closes #25
Figma design: https://www.figma.com/design/RnkfsNvyutLkSDXEhEOkEY/Instructor-Experience?node-id=18471-191211&t=ISjOGICChS4uRnek-11

Screenshot

Captura de pantalla 2025-10-24 a la(s) 11 45 43 a m

How to test it

@openedx-webhooks openedx-webhooks added the open-source-contribution PR author is not from Axim or 2U label Oct 24, 2025
@openedx-webhooks
Copy link

Thanks for the pull request, @jacobo-dominguez-wgu!

This repository is currently maintained by @openedx/committers-frontend-app-instruct.

Once you've gone through the following steps feel free to tag them in a comment and let them know that your changes are ready for engineering review.

🔘 Get product approval

If you haven't already, check this list to see if your contribution needs to go through the product review process.

  • If it does, you'll need to submit a product proposal for your contribution, and have it reviewed by the Product Working Group.
    • This process (including the steps you'll need to take) is documented here.
  • If it doesn't, simply proceed with the next step.
🔘 Provide context

To help your reviewers and other members of the community understand the purpose and larger context of your changes, feel free to add as much of the following information to the PR description as you can:

  • Dependencies

    This PR must be merged before / after / at the same time as ...

  • Blockers

    This PR is waiting for OEP-1234 to be accepted.

  • Timeline information

    This PR must be merged by XX date because ...

  • Partner information

    This is for a course on edx.org.

  • Supporting documentation
  • Relevant Open edX discussion forum threads
🔘 Get a green build

If one or more checks are failing, continue working on your changes until this is no longer the case and your build turns green.

🔘 Update the status of your PR

Your PR is currently marked as a draft. After completing the steps above, update its status by clicking "Ready for Review", or removing "WIP" from the title, as appropriate.


Where can I find more information?

If you'd like to get more details on all aspects of the review process for open source pull requests (OSPRs), check out the following resources:

When can I expect my changes to be merged?

Our goal is to get community contributions seen and reviewed as efficiently as possible.

However, the amount of time that it takes to review and merge a PR can vary significantly based on factors such as:

  • The size and impact of the changes that it introduces
  • The need for product review
  • Maintenance status of the parent repository

💡 As a result it may take up to several weeks or months to complete a review and merge your PR.

@codecov
Copy link

codecov bot commented Oct 24, 2025

Codecov Report

✅ All modified and coverable lines are covered by tests.
✅ Project coverage is 77.90%. Comparing base (5b0d465) to head (2285f78).
⚠️ Report is 8 commits behind head on main.

Additional details and impacted files
@@            Coverage Diff             @@
##            main      #54       +/-   ##
==========================================
+ Coverage   0.00%   77.90%   +77.90%     
==========================================
  Files          5       30       +25     
  Lines          7      267      +260     
  Branches       0       73       +73     
==========================================
+ Hits           0      208      +208     
- Misses         7       59       +52     

☔ View full report in Codecov by Sentry.
📢 Have feedback on the report? Share it here.

🚀 New features to boost your workflow:
  • ❄️ Test Analytics: Detect flaky tests, report on failures, and find test suite problems.
  • 📦 JS Bundle Analysis: Save yourself from yourself by tracking and limiting bundle sizes in JS merges.

@jacobo-dominguez-wgu jacobo-dominguez-wgu moved this from Needs Triage to Waiting on Author in Contributions Oct 24, 2025
@diana-villalvazo-wgu diana-villalvazo-wgu added the mao-onboarding Reviewing this will help onboard devs from an Axim mission-aligned organization (MAO). label Oct 31, 2025
@jacobo-dominguez-wgu jacobo-dominguez-wgu force-pushed the enrollment-summary branch 4 times, most recently from 656dc00 to 8c9a8df Compare October 31, 2025 19:38
@diana-villalvazo-wgu
Copy link
Contributor

can you rebase and resolve conflicts pls? @jacobo-dominguez-wgu

@openedx-webhooks openedx-webhooks added the core contributor PR author is a Core Contributor (who may or may not have write access to this repo). label Jan 5, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

core contributor PR author is a Core Contributor (who may or may not have write access to this repo). mao-onboarding Reviewing this will help onboard devs from an Axim mission-aligned organization (MAO). open-source-contribution PR author is not from Axim or 2U

Projects

Status: Waiting on Author

Development

Successfully merging this pull request may close these issues.

Ticket -Display Enrollment Summary

3 participants