Skip to content

Conversation

@GoeLin
Copy link
Member

@GoeLin GoeLin commented Dec 3, 2025

I backport this for parity with 17.0.18-oracle.


Progress

  • Change must not contain extraneous whitespace
  • JDK-8303475 needs maintainer approval
  • Commit message must refer to an issue

Warning

 ⚠️ Found leading lowercase letter in issue title for 8303475: potential null pointer dereference in filemap.cpp

Issue

  • JDK-8303475: potential null pointer dereference in filemap.cpp (Bug - P3 - Approved)

Reviewing

Using git

Checkout this PR locally:
$ git fetch https://git.openjdk.org/jdk17u-dev.git pull/4199/head:pull/4199
$ git checkout pull/4199

Update a local copy of the PR:
$ git checkout pull/4199
$ git pull https://git.openjdk.org/jdk17u-dev.git pull/4199/head

Using Skara CLI tools

Checkout this PR locally:
$ git pr checkout 4199

View PR using the GUI difftool:
$ git pr show -t 4199

Using diff file

Download this PR as a diff file:
https://git.openjdk.org/jdk17u-dev/pull/4199.diff

Using Webrev

Link to Webrev Comment

@bridgekeeper
Copy link

bridgekeeper bot commented Dec 3, 2025

👋 Welcome back goetz! A progress list of the required criteria for merging this PR into master will be added to the body of your pull request. There are additional pull request commands available for use with this pull request.

@openjdk
Copy link

openjdk bot commented Dec 3, 2025

@GoeLin This change now passes all automated pre-integration checks.

ℹ️ This project also has non-automated pre-integration requirements. Please see the file CONTRIBUTING.md for details.

After integration, the commit message for the final commit will be:

8303475: potential null pointer dereference in filemap.cpp

You can use pull request commands such as /summary, /contributor and /issue to adjust it as needed.

At the time when this comment was updated there had been no new commits pushed to the master branch. If another commit should be pushed before you perform the /integrate command, your PR will be automatically rebased. If you prefer to avoid any potential automatic rebasing, please check the documentation for the /integrate command for further details.

➡️ To integrate this PR with the above commit message to the master branch, type /integrate in a new comment.

@openjdk openjdk bot changed the title Backport e1196584d5c61e3a6baa3eb96801a518cd5dca64 8303475: potential null pointer dereference in filemap.cpp Dec 3, 2025
@openjdk
Copy link

openjdk bot commented Dec 3, 2025

This backport pull request has now been updated with issue from the original commit.

@openjdk openjdk bot added backport Port of a pull request already in a different code base clean Identical backport; no merge resolution required labels Dec 3, 2025
@openjdk
Copy link

openjdk bot commented Dec 3, 2025

⚠️ @GoeLin This change is now ready for you to apply for maintainer approval. This can be done directly in each associated issue or by using the /approval command.

@openjdk openjdk bot added the rfr Pull request is ready for review label Dec 3, 2025
@mlbridge
Copy link

mlbridge bot commented Dec 3, 2025

Webrevs

@openjdk openjdk bot added approval Requires approval; will be removed when approval is received ready Pull request is ready to be integrated and removed approval Requires approval; will be removed when approval is received labels Dec 4, 2025
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

backport Port of a pull request already in a different code base clean Identical backport; no merge resolution required ready Pull request is ready to be integrated rfr Pull request is ready for review

Development

Successfully merging this pull request may close these issues.

1 participant