Skip to content

Next (Do NOT merge) #5820

Next (Do NOT merge)

Next (Do NOT merge) #5820

Triggered via pull request November 20, 2025 14:05
@csviricsviri
synchronize #2836
next
Status Failure
Total duration 25m 49s
Artifacts

pr.yml

on: pull_request
check_format_and_unit_tests
1m 26s
check_format_and_unit_tests
Matrix: build / httpclient-tests
Matrix: build / integration_tests
Matrix: build / special_integration_tests
Fit to window
Zoom out
Zoom in

Annotations

22 errors
build / integration_tests (21, 1.31.8) / Integration tests (21, 1.31.8, vertx)
Process completed with exit code 1.
build / integration_tests (17, 1.31.8) / Integration tests (17, 1.31.8, vertx)
The strategy configuration was canceled because "build.integration_tests._21_1_31_8" failed
build / integration_tests (17, 1.33.1) / Integration tests (17, 1.33.1, vertx)
The strategy configuration was canceled because "build.integration_tests._21_1_31_8" failed
build / integration_tests (21, 1.32.4) / Integration tests (21, 1.32.4, vertx)
The strategy configuration was canceled because "build.integration_tests._21_1_31_8" failed
build / integration_tests (21, 1.33.1) / Integration tests (21, 1.33.1, vertx)
The strategy configuration was canceled because "build.integration_tests._21_1_31_8" failed
build / integration_tests (25, 1.33.1) / Integration tests (25, 1.33.1, vertx)
The strategy configuration was canceled because "build.integration_tests._21_1_31_8" failed
build / integration_tests (25, 1.32.4) / Integration tests (25, 1.32.4, vertx)
The strategy configuration was canceled because "build.integration_tests._21_1_31_8" failed
build / integration_tests (25, 1.31.8) / Integration tests (25, 1.31.8, vertx)
The strategy configuration was canceled because "build.integration_tests._21_1_31_8" failed
Verify Pull Request
The strategy configuration was canceled because "build.integration_tests._21_1_31_8" failed
Verify Pull Request
The strategy configuration was canceled because "build.integration_tests._21_1_31_8" failed
Verify Pull Request
The strategy configuration was canceled because "build.integration_tests._21_1_31_8" failed
Verify Pull Request
The strategy configuration was canceled because "build.integration_tests._21_1_31_8" failed
Verify Pull Request
The strategy configuration was canceled because "build.integration_tests._21_1_31_8" failed
Verify Pull Request
The strategy configuration was canceled because "build.integration_tests._21_1_31_8" failed
Verify Pull Request
The strategy configuration was canceled because "build.integration_tests._21_1_31_8" failed